EFTA00595249.pdf
Extracted Text (OCR)
Mechanical Work Shop Zprro Ranch
horns
Concrete 4000 psi
Rebar
Expansion joints
Concrete Pump
Garage Door installed
Dry Well for drainage
Misc. pvc, gravel
forming, glue etc
Labor
Cost
Wash Pad
Concrete 4000 psi
Rebar
Labor
Cost
Wash Pad
Mechanical Shop
Total Expenditure for Both
Cost
40 yds @ $98.00
$
3,920.00
130 sticks © $4.00 $
520.00
20 © $4.00
$
80.00
1 day @ $1000.00 S
1,000.00
1 © $3260.00
S
3,260.00
1
$
775.00
$
2,200.00
In House
$
11 765.00
18 yds ci) 98.00
$
1,764.00
62 sticks
$4.00 $
248.00
in House
2,012.00
2.00
11,775.00
13,767.00
EFTA00595249
fistaie Repon
Page I of I
SW Home Documents and lists Create Site Settings Help
M.3
Select a View
All Events
Calendar
Current Events
lE Report
Active Projects
Actions
▪ Alert me
e Export to
spreadsheet
e Modify settings
and columns
Zorro Ranch
Estate Report
Up to Epstein Interests Intranet
PI
New Item
i
FlIter I MEdit in Datasheet I :Blink to Outlook
Status
Pro) No. Pro) Name
Info/Status
Info/Status
Info/Status
Info/Status
Info/Status
41 Permitted/Leased Land -
Business Lease
55 New Estancia Fountain
99 Refurbishment Landscape
Lights - MH
103 Resealing Wood - Stables
& Adobe
105 Exterior Stucco Repairs at
MH
Info/Status
111 Replacement Picket
Fences/Refurbishment RC
Info/Status
11
ech Workshops/Wash
Pad Construction
Information
Responsibility Photo/Attch
Directive lE Comment
4/27 - Awaiting date for an on
Brice/Karen
No
site assessment for fees etc by
NM State
4/15 • Installation contractor on
Brice/Karen
No
site, received all relevent details,
weight, access, location etc.
Expect estimate 4/29
4/27 - Project 90% complete.
Brice/Karen
No
Completion expected 5/1
4/20 - Due to cold weather, start Brice/Karen
No
date expected mid May
4/15 - Contractor on site to
review scope of work. Expect
estimate 4/28
4/20 -
approved replacement Brice/Karen
No
of all picket fences &
refurbishment of grassed yards at
RC
Attached material budget, all
_ _—iaboratn tkitiTe"-
4/20 - HE approved relocating
Mech Workshops to Pole Barn
area & construction of concrete
wash pad outside Workshops
Attached material budget, all
labor "in house"
Brice/Karen
No
Brice/Karen
No
htt p://wehs ry 0 I /torro/Li st sfEstater."020Report/J Eql0Report .aspx ?S how I n ri (I=H TM L
4/27/2009
EFTA00595250
Document Preview
Document Details
| Filename | EFTA00595249.pdf |
| File Size | 269.5 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 2,395 characters |
| Indexed | 2026-02-11T22:53:17.845142 |
Related Documents
Documents connected by shared names, same document type, or nearby in the archive.