Back to Results

EFTA00595249.pdf

Source: DOJ_DS9  •  other  •  Size: 269.5 KB  •  OCR Confidence: 85.0%
View Original PDF

Extracted Text (OCR)

Mechanical Work Shop Zprro Ranch horns Concrete 4000 psi Rebar Expansion joints Concrete Pump Garage Door installed Dry Well for drainage Misc. pvc, gravel forming, glue etc Labor Cost Wash Pad Concrete 4000 psi Rebar Labor Cost Wash Pad Mechanical Shop Total Expenditure for Both Cost 40 yds @ $98.00 $ 3,920.00 130 sticks © $4.00 $ 520.00 20 © $4.00 $ 80.00 1 day @ $1000.00 S 1,000.00 1 © $3260.00 S 3,260.00 1 $ 775.00 $ 2,200.00 In House $ 11 765.00 18 yds ci) 98.00 $ 1,764.00 62 sticks $4.00 $ 248.00 in House 2,012.00 2.00 11,775.00 13,767.00 EFTA00595249 fistaie Repon Page I of I SW Home Documents and lists Create Site Settings Help M.3 Select a View All Events Calendar Current Events lE Report Active Projects Actions ▪ Alert me e Export to spreadsheet e Modify settings and columns Zorro Ranch Estate Report Up to Epstein Interests Intranet PI New Item i FlIter I MEdit in Datasheet I :Blink to Outlook Status Pro) No. Pro) Name Info/Status Info/Status Info/Status Info/Status Info/Status 41 Permitted/Leased Land - Business Lease 55 New Estancia Fountain 99 Refurbishment Landscape Lights - MH 103 Resealing Wood - Stables & Adobe 105 Exterior Stucco Repairs at MH Info/Status 111 Replacement Picket Fences/Refurbishment RC Info/Status 11 ech Workshops/Wash Pad Construction Information Responsibility Photo/Attch Directive lE Comment 4/27 - Awaiting date for an on Brice/Karen No site assessment for fees etc by NM State 4/15 • Installation contractor on Brice/Karen No site, received all relevent details, weight, access, location etc. Expect estimate 4/29 4/27 - Project 90% complete. Brice/Karen No Completion expected 5/1 4/20 - Due to cold weather, start Brice/Karen No date expected mid May 4/15 - Contractor on site to review scope of work. Expect estimate 4/28 4/20 - approved replacement Brice/Karen No of all picket fences & refurbishment of grassed yards at RC Attached material budget, all _ _—iaboratn tkitiTe"- 4/20 - HE approved relocating Mech Workshops to Pole Barn area & construction of concrete wash pad outside Workshops Attached material budget, all labor "in house" Brice/Karen No Brice/Karen No htt p://wehs ry 0 I /torro/Li st sfEstater."020Report/J Eql0Report .aspx ?S how I n ri (I=H TM L 4/27/2009 EFTA00595250

Document Preview

Extracted Information

Locations

Dates

Document Details

Filename EFTA00595249.pdf
File Size 269.5 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 2,395 characters
Indexed 2026-02-11T22:53:17.845142

Related Documents

Documents connected by shared names, same document type, or nearby in the archive.

Ask the Files