Back to Results

EFTA00595272.pdf

Source: DOJ_DS9  •  Size: 215.1 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

11/05/2008 15:38 FAX 505 898 9293 BUILDERS CHOICE PAINTING (ffi 2 balltlers***** a les plintito TO: vat ailiarr Zorro Ranch Attn: Brice Gordon 49 Zorro Ranch Rd. Stanley, NM 87056 I3nildAnisClinoice Painting, LTA1 7121-A Washington St. NE Albuquerque, NM 87109 505.898.9180 505.898.9293 fax Invoice DATE INVOICE X 10/31/2008 22694 Phone* 832.2678 ADDRESS / S.O. PROJECT TERMS REP E. Number Windows Upon Completion Eric 8456 WORK COMPLETED AMOUNT Patio Courtyard Wood 1. Lightly pressure wash courtyard tongue and groove ceiling, corbels, soffit and 2 additional areas on the'south side. 2. Apply stain to above to match existing color. Labor and Materials Yellow Room Ceiling 1. Paint ceiling with commercial grade latex to match original faux finish. Ceiling painted twice (base and faux) due to drywall repairs done by others. Labor and Materials Materials, equipment & insurance supplied by Builders Choice Painting \46 ck 616 - Itodaks krfr 6,910.00 1,20100 Subtotal 58,110.00 TERMS: Past due accouotS may be subject to a finance charge of 1 I/2% per month (18 % pee annum). In the event or &huh you will bc responstble for reasonable attorney fees and a11 collection colts. --6g Vifr Oks— \)iqic)-& 7\e'(\ctk Sales Tax (7-9315%) 5643.73 Total $8,753.73 EFTA00595272 Emad Hanna From: Sent: Wednesday, November 12, 2008 1:24 PM To: Emad Hanna Subject: Project 95 Attachments: Project 95 002.jpg; Project 95 003.jpg; Project 95003.pdf Dear Emad, Attached invoice for payment from Builders Choice Painting $8,753.73 for Project 95. Original Bids: Patio Courtyard Wood - $1,540.00 Yellow Room Ceiling - $720.00 Patio Courtyard - Original bid was for 1 coat on the exterior section of the courtyard, this area has never been restained since construction of the house. It became quite clear that the wood was in worse condition than we anticipated, hence 3 coats were required & also we then included the interior section of the courtyard, to insure that all wood was in uniform color & condition. There was a eave section outside the yellow bedroom which we also added. Yellow Bedroom Ceiling - The curved ceiling was replastered with no problems, 2 weeks later it was sealed & painted, but for some reason the celing popped in numerours areas, hence required resurfacing. Please note there has been previous water damage in this room, roof leaking, another reason for replacement of roof tiles. Please Note: Due to weather & poor scheduling by Choice Painting, we are seriously considering closing this project & completeing the remaining work closer to JE's return As you know there is stucco work required at the MH, which after repair will require painting, hence we could complete this at the same time. I will let you know by early next week if we will be closing this project If you have any questions or concerns please let me know Warmest regards Karen Call T Get the Moviefone Toolbar. Showtimes, theaters, movie news & more! EFTA00595273

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA00595272.pdf
File Size 215.1 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 3,044 characters
Indexed 2026-02-11T22:53:19.625949
Ask the Files