EFTA00595304.pdf
PDF Source (No Download)
Extracted Text (OCR)
Zorro Development Corp.
49 Zorro Ranch Road Stanley, eth4_87056
•
2920 Fax:SOS 938 2924
E-mail
Wire Transfer Request Form
Date of Request: 09/13/2010
Amount Requested:
Payee:
54,600.00
Three B's LLC
Bank Name:
Bank Account:
Requested By.
As on File
As on File
Renee Burns
Purpose / Description:
Payee
Address:
Bank
Address:
As on File
As on File
Payment of Invoice for applying adhesive roofing material on terrace on east side of MH
Payment of Invoice for additional work on Estancia fountain • lowering to final position
Special Notes / Instructions:
Final photos sent to Mr Epstein 09/12/2010
G / L Account Information:
G / L Description: Repairs and Maintenance - MH
G / L Number:
Authorization
& (
tfr-Ca \•
1/
73110
fatalkh-t-
tfrAtaaj
*it 1"
elit
fp,t
G006.L arcs„
43/33-1-0 "r""
EFTA00595304
Three B's LLC
4600 Lincoln rd. NE
Albuquerque, NM 87109
Lief* 83498
505-450-3654
Invoice
Brice Gordon
c/o Zorro Ranch
Stanley, New Mexico
Brice,
Here is the price for lowering the fountain in the Estancia
Phase 1
Support fountain bowl with I-beams and heavy duty material lifts (4)
Saw cut grout joint
Raise bowl and remove middle piece of fountain
Lower bowl and set into place for owner to approve
Phase 2
Support fountain bowl with I -beams and heavy duty material lifts (4)
Raise fountain and apply grout
Lower fountain and level
Fill bowl to check for uniformity of water flow around the perimeter of bowl. Some
grinding may need to be done to achieve water flow.
Project should take about 3 day's total
Includes; material, labor, equipment to complete project
Excludes; electrical and plumbing
Price S 2,450.00 plus tax
Total S 2,621.50
'•We had additional labor, materials and equipment rentals to lower the bowl to its final
position after meeting with Mr. Epstein. 51,180.00 plus tax
Total 51,262.00
Final total
Call me if ybu4 aaty questions at 450-3654
Thank you,
JJ Blea
Managing Member
EFTA00595305
Three B's LLC
6023 Osuna NE
Albuquerque, NM 87109
Lic.# 83498
Invoice
Brice Gordon
Zorro Ranch
Stanley, NM
Install self adhesive roofing material on east side of the house
Price 1,140.00 plus tax
Total due S1,217.00
Please call me if you have any questions at 450-3654.
Thank you,
JJ Blea
EFTA00595306
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Document Details
| Filename | EFTA00595304.pdf |
| File Size | 233.8 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 2,305 characters |
| Indexed | 2026-02-11T22:53:20.496042 |