Back to Results

EFTA00595307.pdf

Source: DOJ_DS9  •  Size: 225.1 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

Emad Hanna From: Jeffrey Epstein Sent: Wednesday, October 06, 2010 6:15 PM To: bgordon.lsj contact Cc: Emad Hanna Subject: Re: Zorro: Fountain and terrace Invoices pay . except for extra , pay 1140 terrace , and the original estimate of 26 On Wed, Oct 6, 2010 at 10:15 PM, brice gordon wrote: Jeffrey For your approval attached are the corrected invoices from JJ for the installation of the water proof membrane on the Master bedroom terrace and the lowering of the fountain at Zorro. Terrace Work dated 8/19/10 Cost: $114O.00 Fountain bowl lowering , dated 8/ 181 10 and 9/8/10 Cost: $3883.50 Brice *** ************************ **** ************ ****** *** IP** * ** The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of Jeffrey Epstein Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediate) by return e-mail or by e-mail to and destroy this communication and all copies thereof, including all attachments. 1 EFTA00595307 Three B's LLC 6023 Osuna NE Albuquerque, NM 87109 Lic.# 83498 Invoice Zorro Ranch Stanley, NM 10/6/10 Install self adhesive water proofing material on deck outside mater bedroom to protect lower terrace ceiling from water damage. This material is only a temporary fix and will not withstand the elements for longer than 6 months. Wok was completed on 8-19-2010 Material 750.00 Labor 390.00 Tax 77.00 Price 1,140.00 plus tax Total due 51,217.00 d y. Please call me if you have any questions at 450-3654. Thank you, JJ Blea EFTA00595308 Three B's LLC 4600 Lincoln rd. NE Albuquerque, NM 87109 Lic.# 83498 505-450-3654 Invoice Zorro Ranch Stanley, New Mexico 06 October, 2010 Phase 1 8/18/2010 Support fountain bowl with l-beams and heavy duty material lifts (4) Saw cut grout joint Raise bowl and remove middle piece of fountain. Lower bowl and set into place for owner to approve Cost: $2450.00 Tax: 171.00 ate404-1, — Total: $2621.50 '6)(#2-1:r 5,c -Aittc,tvtrk Phase 2 9/8/2010 Support fountain bowl with 1-beams and heavy duty material lifts (4) Raise fountain and apply grout Lower fountain to height indicated by owner and level Fill bowl to check for uniformity of water flow around the perimeter of bowl. Some grinding may need to be done to achieve water flow. Cost: $1,180.00 Tax: $ 82.00 Total: $1262.00 Includes: material, labor, equipment to complete project Excludes; electrical and plumbing * Fountain to be lowered after the 17th of August and to be completed before owner returns o the 21 xi of August so that owner can confirm height. Material 400.00 Equipment rental 1200.00 Labor 2030.00 Tax 253.00 Final total $ 3,883.50 Call me if you have any questions at 450-3654 Thank you, JJ Blea EFTA00595309

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA00595307.pdf
File Size 225.1 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 3,054 characters
Indexed 2026-02-11T22:53:20.520643
Ask the Files