LSJ - Island
Punch List/Project list
as of 1/3/2013
PRIORITIZE
PROJECT DESCRIBT1ON
I Laborers I Hours
Labor Cost
atomic
Total Estimated cost
Start Date
End Date
Note
MAINTENANCE
I. Equipment and Vehicles
Brakes Black Bikes
1/3/2013 - reviewed & adjusted 1/3
Excess Oil Disposal
- proposal forward to Rich K
relowarded to Jeanne 12/29 awaiting direction
3,000.00
I
Electric Golf Cart Damage
- forwarded photos to dealer 1/1 awaiting response
1
-2. Five Palms
Picture Frame (86 x 70)
1/3/2013
1/22/2013 Canvas on site -forwarded to framer 1/3 completion expected 1/22
3. Dock Boxes
Fabricated a lighter lid, still to heavy
-investigating resin/plastic option, up to 4 ft high win forward 1/5
6. Roads
General re-grading of roads-ongoing
S. Landscaping- Peter's UN
Line all Roads with Rocks - ongoing
Removed Palm Tree on MC Hill
- replacement JEE to advise
Black Hell Under Pads- installation to begin 1/10 existing pads
to be removed
1/10/2013
12. Stone Wags
Repair work to replace missing loose stones & complete Hell Pad
wag - after Employee Bathroom Protect
a
20. Storage Areas-
All areas to be organized & inventoried
21. AC -
Proposing that the 2"r unit from Kitchen is replaced & relocated
to a Hobbits
Barge
Brice to
Maintenance contract option
request proposal from island Marine
Paint window frames
Danny Projects
Move kghts on flag pole
Chilies bathroom electrical
Beach Office - repair outside hard
Relax Bathroom - rewiring
Pool Cabana - change lights parking area
Screen Room - repair lamp
5 Pages - repair x 2 floor lamps
5 Palms - review exposed wires around coconut palms
berm - cover Electrical box
kilo Center - review outside electrical box area
1 of 5
EFTA00598504
LSJ - Island
Punch List/Project list
asof 1/3/1013
PRIORITIZE
PROJECT DESCRIBTION
Laborers I Hours
labor Cost
Kite House & Pebble Beach - review solar, relocate solar panel to fool of Pebble Beach House
Ilki House - instant hot water system to be installed 1 9
Ilki House- reinstall light cover in kitchen
Captains Office - installation new AC (on site)
Under Master Bedroom - repair AC unit
Llghtbulb Replacement - Sarah's Off Ice. Library Blackboard & Ceiling. Master Closet Area.
Beach Lighting - section out
Water Picot Covers- for all outside electrical areas - hanger, flag pole pool
Jermaine Pro cis
Beach Office - no Internet/phone
Phones Down - master bathroom. room 4. 5 Palms.
Various maintenance
Bronze Sculpture - base painted same as wall color
GyntBathroorwRool - repainted
Hanger Area - door resurface & stain
- paint concrete block supporting wind sock
Tild Kitchen Rool - replacement
Flag Pole Pool - resurface & finish outside table & benches
- fridge need to be bolted down
MC - replasterrpaint rising lawn edging
- restaln upper telling St John & Courtyard
Sarah's Office - repaint air vent
Wooden Planters (new & old) - seal
Captains office - plasteepaint interior
Thatch - all locations require new sections
Fans - Rust
Info Center - review drainage In parking area
elEZIECIN
swarm Total Estimated cost
Start Date
End Date
1/9/2013
since -12/14
S. Landscapine
Loading Dock - requires redesign
Peter 3 days
Sea Grape/Citrus Fertilizer/Mulch/Plant Material -
1/8/2013
ordered - tottery reopens 1/7 awaiting ETA
Sunflower seeds
1/8/2013
- ordered -John Deere reopens 1/7 awaiting ETA
Caribbean Plants with color
Ingrid -Change Jasmine qty to 50 plants,100 bright red bougainvillea to order. 3 gal.
1/8/2013 Ingrid to work on order
Dave projects
$ 13,000.00
$
13,000.00
3/2/2013 13 week contract ending 3/2/2013
MSI - bill $5,318.55 plus $4000 estimated lit out ( no list) - material on site, demo
1
Staff ballrooms
$ 9.500.00 $
9,500.00
12/28/2012
1/18/2013 started 12/28 rough in plumbing complete, concrete work to begin 1/4
Porta potty
$ 1,000.00 $
1,000.00
2
Pops garden
3,730.00 $
3,730.00
2/15/2013 MSI - $ 3730 - Demo existing, construct new shade/planter area
Barge window frames
$ 1,000.00 $
1,000.00
Brke to provide material list - wood and hinges
Beach Equipment/Toy Rack
2/9/2013
3
Planter boxes
1/10/2013 4 done 2 to go using materials on site
Barge chocks
Bronze sculpture gym
To be raised
20f5
EFTA00598505
LSI - Island
Punch List/Prolect list
as of 1/3/2013
PRIORITIZE
PROJECT DESCRIBTION
I Laborers Hours
Labor Cost
Mwamron
Total Estimated cost
Start Date
End Date
TIM House - Propane Stand
Lattice Panels Installed - tunnel
Nap Housettall Cottage - Replacement of all Screens
4
Audio equipment kitchen
Captains Office - AC Frame
Pergola Construction - High Road Benches
-require design detalls/numbers from JE
Redesign & install all new beach signs
Cleaning, Organizing & inventory of Wood Shop
17. Pools -
- Installation of x 2 variable speed pumps per pool
1/12/2013
1/10/2013
- Flag Pole Pool - steps to be Installed- require JE direction
- MC Pool - steps to be installed to pool pump room
Heater
1/2/2013
14. Solar -
- Solar Vendors-Toshiba reps on site 1/7. Toshiba have
postponed on site visit. Awaiting final proposal
Question Toshiba on new meter to measure line loss and solar batter life in Stair
7. Library
Chiller - estimate forwarded 12/24 to JE for review. 12 week
lead time for equipment. 2 to 3 weeks installation
130,000.00
Bid from Atlanta refrigeration f contact Kent) alternative bids to be obtained
9 Steel Shed
Paid In advance Buck steal ; 2nd building shipped 1.2.2013 ETA 1.51013 on 577; Roll up
Structure
43,140.00
1/18/2013
2/28/2013 door ETA at Tropical 1.4.2013 sailing 1.9.2013 ETA STT 1.12.2013
Shipping and trucking
7,554.55
12/19/2012 -.0.0.0.0astana emptmd on Li! sland until imtaltsbon ma on ifte.Caetruclion OMV ETA IPA
Fit out
6,500.00
-Lights, Switches, Electrical Equipment order -Danny to finalize 1/5
Tools
TBA
Accommodations
7,920.00
1/18/2013
1/29/2013 200/nt 3 units 11 Ms plus @20%
Air
2,401.90
Paid in advance spirit
Food
TBA
Existing shed
Resign
12,008.00
1/18/2013
2/28/2013 -Relit Existing Shed — sheeting etc ETA 1/5 roll up door to sail 1/9
Fit Out lights
1,500.00
Bid approved 11/8 Material on site. Start to empty cisterns 1/3. Work to start 1/11
13. cisterns.
13200.00
1/11/2013
2/13/2013
Expected completion by 2/13 $8,500 deposit made All furniture in rooms 1 & 2 needs
to be removed or covered before work begins After repair complete Laundry,
Hobbits, Bathroom, Pump Rm, Tech Rm all require repair/plaster/paint
8. Hangar
Fuel Containment Pad
—Plan ready for submission Plans sent out for new bid
18. Roads —
3 of 5
EFTA00598506
LSJ - Island
Punch List/Project list
as of 1/3/2013
PRIORITIZE
PROJECT DESCRIBTiON
taborers I Hours
Labor Cost
Mwaulron Total Estimated cost
Start Date
End Date
- Other solutions to be investigated
22. Fire System —
-Pipe that feeds the 300,000 gal system needs to be replaced.
Draining of tank started 1/3 Will forward complete costing once
pipe is inspected & scope of work determined
Derust and Paint equipment
Hire individual to paint equipment - one month tine
PUROMSESISALES/DELIVERIES
4. Boats
Lady G -sell - will remain at Nanny Cay until sold.
Midnight Express - sell
1/15/20121 - buyer on site 12/21 will make contact by 1/15
Purchase Yacht Tender
- options forwarded toff awaiting direction
Purchase New Boat to replace Midnight 146
- require budget
Repower Little C
-Jeanne investigating
10. ggulizintntillotrabold_Puccha se and Delivery
Italian Deck Chain
E 12/20/2012
1/23/2013 - shipped from Italy 12/20 ETA STT 1/23
Pool Towels
- on site -JE not happy with "leer prefers previous towels. Sarah investigating other op
- shipped to incorrect address - reordered - again delivered 12/28 to incorrect address.
Pace Cocks x 2 Unit]
Daphne trying to track down awaiting ETA
Ride on Mower - with bag option.
9,500.00
Brice to provide commercial Invoice JE approved. Rick K to finalize
Fuel Truck
- repair work estimate 515K. Larry to get quote Review purchasing new unit.
Tool Boxes- will forward options ASAP
Pool Ladders -ETA 1/11
1/11/2013
Outside Lanterns
- unable to get replacements, investigating other options
Media Center - Relax Room -
Copenhagen unit selected, Sarah will forward options
Desk - Flagpole Pool Cabana
- still in Paris awaiting ETA
Rug- Flagpole Pool Cabana
- ordered ETA mid Feb
Portable Electric Oven
12/26/2012
1/8/2013 - shipped to FL 12/26 ETA R. 1/8
Small Ref igerator ( 4 to 8 bottles) live palms
11. Containers - RO & Generators in remaining container
r
1/5/2013
- possible offer due 1/5
15. Media -
Stewart Screen
15,500.00
Larry Investigating purchase
Blue Ray DVD Mayer( Screen Rm)
Sub and Mini System (Kitchen)
Move exsisting system to NY
16. Cell Repeater & Broadband -
YAGI and repeater
2,200.00
1/8/2013
PEE approved Jermaine to order
Hansen for Life Jackets
Carlos to purchase 8
4of5
EFTA00598507
LSJ - island
Punch List/Prolect list
as of 1/3/1013
PRIORITIZE
PROJECT DESCRIBTION
Laborers Hours
Labor Cost
MwMACOI Total Estimated cost
Start Date
End Date I
Notes
GENERAL DIRECTIVES
1. Equipment and Vehicles
- No equipment or vehicles etc off the island unless approved
19. Moorings —
- Request inspection from USCG —Darren
8. Hangar/Fuel depot
Fuel ContainmeM Pad —Man ready for submission,
Permit status
Bolke and fuel amibbilty
tease
Cell towers
Internet service
Personnel
Full time house keeper
IT Support
Big N Barge Captain
Land scape superybor - once a week
1/8/1015
Dempsey had requested inspection - Hodge preparing letter to DPNRLIP Oriel) and is
completing army Corp certification form
Permit has been reviewed awaiting P. smiths signature
LV to discuss with Bolke
Lease to be submitted on Tuesday, Jan 8, 2013
Draft letter for review with DID re ATT real estate division requesting tower
Option to install Broadband VI at one location I $99) a month 10 meges Continual - 5 up
5 of 5
EFTA00598508
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA00598504.pdf |
| File Size | 268.8 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 10,010 characters |
| Indexed | 2026-02-11T22:57:08.904378 |