Permit #230-09
I)
LSJ Project #1004
LSJ Project Name -Master Bedroom
___ Personnel re iminary walkthrough to check and correct items to prepare for C/O
inspection. Danny Vicars should lead walk through — (Pre-Inspection Check List
Attached)
2) Scheduled Krauss Manning to do final inspection to insure compliance:
Tony Coffelt, CMIT
Project Manager
3) Correction of noncompliance issues, if any — LSJ personnel
4) Re-inspection of corrected issues — Kraus Manning
5) Occupancy forms to be completed and submitted to DPNR - Kraus Manning/LSJ
6) Final inspection — DPNR
No.
230-09
BUILDING PERMIT
DM°
,:tat I.
GOVERNMENT OF THE VIRGIN ISLANDS
DEPARTMENT OF PLANNING AND NATURAL RESOURCES
DIVISION OP PERMITS
CYAK. I
ICING TERMINAI RIM.CMINI. 2nd ILONA
FAX awn 714-9532
CRAM (P LE AMAMI. SI THOMAS. V 100102
TEl. (MO) 7744320
PERMISSION IS HEREBY GRANTED TO
Jet I rey itptite In
TO (cord Kg ,opair, .N4
Renovation 4 Addition
Description of structure:
locallOn:
Approximate cost of work: $
4191,733.90
Person(s) In charge of work:
Undecided
REMARKS: Contract
ion shall
be done In accordance YLth Tina. 29. action 292 oL the T.L.
8" Riks w/ Stone Finish
Building
Code
FEE: $
423.00
Hatt le St. Janet;
7,„Li_reen
B41
Commissioner el odi
l erritozia:. Director
ill and Hanna Rowena
EFTA00600088
LSJ Permit #265-10
LSJ Project # 1006
LSI Project Name - Laundry
1) LSJ Personnel Preliminary walkthrough to check and correct items to prepare for C/O
inspection. Danny Vicars should lead walk through — (Pm-Inspection Check List
Attached)
2) Scheduled Krauss Manning to do final inspection to insure compliance:
Tony Coffelt, CMIT
Project Manager
KMI Insnection Group
3) Correction of noncompliance issues, if any — LSJ personnel
4) Re-inspection of corrected issues — Kraus Manning
5) Occupancy forms to be completed and submitted to DPNR - Kraus Manning/LSJ
6) Final inspection — DPNR
NO. _BP-ST ED265:10
Date§(Z3 2010
BUILDING PERMIT
GOVERNMENT OF THE VIRGIN ISLANDS
DEPARTMENT OF PLANNING AND NATURAL RESOURCES
DIVISION OF PERMITS
45 Mats HR Frederuclmled, SI Mom 00840
Cyrl E lOng Mpat, M Thomas 00602
TM (340)7/3.1062 Fox (340)776 4021)
TM (340)7/43370 Fax (340)714.0532
PERMISSION IS HEREBY GRANTED TO: • LSJ J IC
TO (Construct, Repair, etc.): A(itsbenficumatien_aodJaingky Addil
Description of structure:. As_PCI APPL
id_PJans
Location: Lillie SI .70010SIMROD
Approximate cost of work: VW 0019
Person(*) In charge of work: TAD
REMARRS:.ASESSZSG ik_VICCALTIlle-29 Cmnalmace
FEE:_$G00
1",*".
bC.wr.a se,N Paine 9 iMN ri l;;;tul Les
EFTA00600089
Permit #265-10
1.51 Project # 1007
LSJ Project Name -Kitchen
1) LSJ Personnel Preliminary walkthrough to check and correct items to prepare for C/O
inspection. Danny Vicars should lead walk through — (Pre-Inspection Check List
Attached)
2) Scheduled Krauss Manning to do final inspection to insure compliance:
Tony Coffelt, CMIT
Project Manager
3) Correction of noncompliance issues, if any — LSJ personnel
4) Re-inspection of corrected issues — Kraus Manning
5) Occupancy forms to be completed and submitted to DPNR - Kraus Manning/LSJ
6) Final inspection — DPNR
Nt.BM:C42.05:10—
BUILDING PERMIT
GOVERNMENT OF THE VIRGIN ISLANDS
DEPARTMENT OF PLANNING AND NATURAL RESOURCES
DIVISION Of PERMITS
45 Mats Hie Frederakeleck SI Croot00840
Cyril E Sang Airport* SI. Biome 00802
Tot (340)773.1092 Fax (340)7754620
Tel. (340) 774.3320 Fax (340) 714.0532
Dategd23(2414.______ .
PERMISSION IS HEREBY GRANTED TO: L&LALC._
TO (Construct, Repair, etc.): _IMchteRommaan aniLLaundityAdabgn
Description of structure:.As Pef AporoirgeBans
Location: _Me SL Janes Island
Approximate cost of work:_ ;107.000 90
Porson(s) In charge of work: TOO
REMARKS: As Per IRC2009 & 1 Code Tito 29 C9DPIlarece
FEE: $0.00
_ .
basiaal
NT-Cam
t010tatimg-ia-,
EFTA00600090
Permit # 117-11 LSJ #Project -1011
Main House (Cabana)
1) LSJ Personnel Preliminary walkthrough to check and correct items to prepare for C/O
inspection. Danny Vicars should lead walk through — (Pre-Inspection Check List
Attached)
2) Scheduled Krauss Manning to do final inspection to insure compliance:
Tony Coffelt, CMIT
3) Correction of noncompliance issues, if any — LSJ personnel
4) Re-inspection of corrected issues — Kraus Manning
5) Occupancy forms to be completed and submitted to DPNR - Kraus Manning/LSJ
6) Final inspection — DPNR
BUILDING PERMIT
Oats
08/26/2011
GOVERNMENT OF THE VIRGIN ISLANDS
DEPARTMENT OF PLANNING AND NATURAL RESOURCES
DIVISION OF PERMITS
45 Mars PM, Fredencasted, St, Croix 00840
Cyt II E. King Airport, St. Thomas 00802
Tel: (340) 773.1082 Fax: (340) 778-4020
Tel: (340) 774-3320 Fax: (340) 714-9532
PERMISSION IS HEREBY GRANTED TO: LS' fit:
TO (Construct, repair, Mc): Addition-Cabanna
Description of structure- As PerAPPnved Plans
Location: Pla "C" Usk St James
Approximate cost of work* 1234646.°
Person(sI in charge of work: 7BD
REMARKS: As per WU' 2009 and VI Code 7Ilk 29, CL 5 Code Compliance: asAs per amendment
to Ad 7075, permit for the hutallation olsolar thermal swam k not required
FEE: $ 34040
Olivaitil•I
of
and 'Mama Real/Inn 1
EFTA00600091
Permit #CN 1049
I LSJ Project 1013 I LSJ Project Name - Flagpole Pool
1) LSJ Personnel Preliminary walkthrough to check and correct items to prepare for C/O
inspection. Danny Vicars should lead walk through — (he-Inspection Check List
Attached)
2) Scheduled Krauss Manning to do final inspection to insure compliance:
Tony Coffelt, CM1T
Project Manager
KMI Inspection
3) Correction of noncompliance issues, if any — LSJ personnel
4) Re-inspection of corrected issues — Kraus Manning
5) Occupancy forms to be completed and submitted to DPNR - Kraus Manning/LSJ
6) Final inspection — DPNR
Oate Feb. 7. 2011
BUILDING PERMIT
GOVERNMENT OF THE VIRGIN ISLANDS
DEPARTMENT OF PLANNING AND NATURAL RESOURCES
OPOSION OF MOOTS
45 Mao iss. Frettenctmea. St. Crow 00540
eyniF trio gepart St lhoov.s 00tie:
'5•1 ,StO) 47S-1017 I-54 (320)778.1020
Ter (34:0 T24.1570 is. Fr 40, 7I4 0517
PERMISSION IS HEREBY GRANTED TO:. !.l..SALAW.._
TO (Construct, Repair, etc.11: COnt,01100001v4Cabaps. DeSta_LauPlUtP.1200is
Description of structure: _Att..
pro.ttlthgb
Location: PeszingiStle,SUI.amcs Brest
Approximate cost of work: $333,300.00
Person(s) in charge of work:1 .(
1U_
REMARKS:. s rof IRC 2009 u:s1 VI Co® The 29. CFI 5 Celle Coniaacs_
FEE: $0.00
oW
m a no Panama, moon'
COPY
dew, twin,/ ym. ce-7 -'2•S - /04
/0-
/0
EFTA00600092
Permit #018-12 I LSJ Project #1014
LSJ Project Name - Dock Shelters
I) LSJ Personnel Preliminary walkthrough to check and correct items to prepare for CIO
inspection. Danny Vicars should lead walk through — (Pre-Inspection Check List
Attached)
2) Scheduled Krauss Manning to do final inspection to insure compliance:
Tony Coffelt, CMIT
Project Manager
3) Correction of noncompliance issues, if any — LSJ personnel
4) Re-inspection of corrected issues — Kraus Manning
5) Occupancy forms to be completed and submitted to DPNR - Kraus Manning/LSJ
6) Final inspection — DPNR
NO.
tila-1E
Date
ip,r1A/2011
BUILDING
PERMIT
GOVERNMENT
OR TIRE. VIRGIN
ISLANDS
DEPARTMENT
OF PLANNING
AND NATURAL
RESOURCES
oivielOal or Praetor*.
46 MS's Hipp. Prortortokotoit. St. Craig 00040
Cyril H. Khoo Airport. St. Thomas 00b02
Tol (340) te3-1052 I-pc:(340) 770.4620
Tel: (340) 7743326 Pair: ( 840) 714.5533
PERMISSION IS Hannay
GRANTED TO:
Lay, LLC4
Consirorr New Shreds
TO occoowlesol.
Deeeription
or atruottsre•
dis per Approwv/ Plans
Panne/ No. C
AMUR,
LowlitiOn:
Approximate
cost or work•
148..9.71.00
ParstoMa) In charms or work:
TOD
REMARKS:
As per /RC 2009
/
Code Tide 2946.5 CodeCootplionee.rrir
per
//// dotesel to riot
7070. period' few dor insioilestion n/ gopher the. 0000 Anatem
nor required.
FEE:
S. "5.6.
EFTA00600093
Permit #011-12
LSJ Project #1015 1 LSJ Project Name - Five Palms
1) LSJ Personnel Preliminary walkthrough to check and correct items to prepare for C/O
inspection. Danny Vicars should lead walk through — (Pm-Inspection Check List
Attached)
2) Scheduled Krauss Manning to do final inspection to insure compliance:
Tony Coffelt, CM1T
Project Manager
KMI Inspection Group
3) Correction of noncompliance issues, if any — LSJ personnel
4) Re-inspection of corrected issues — Kraus Manning
5) Occupancy forms to be completed and submitted to DPNR - Kraus Manning/LSJ
6) Final inspection — DPNR
No.
011-12
Date
10/13/2011
BUILDING PERMIT
GOVERNMENT OF TIIE VIRGIN ISLANDS
DEPARTMENT OF PLANNING AND NATURAL RESOURCES
DIVISION OF PERMITS
45 Mars Hill, FrederIcksted, St. Croix 00840
Cyril E. King Airport. SI. Thomas 00802
Tel: (340) 773.1082 Fax: (340) 778-4620
Tel: (340) 774.3320 Fax: (340) 714-9532
PERMISSION IS HEREBY GRANTED TO:
1.1.0
TO (Construct, repair, etc):,
Addition-Musie Room
Description of structure:
As Per Plans Submitted
Location:
Mtge St James
Approximate cost of work:
71,680.00
Person(s) in charge of work: TRD
REMARKS: : s per 11W 2009 and VI Code Title 29, Ch. .5 Code Compliante:**As per Amendment to
Art 7075, permit for the installation °holar thermal system is not required.
2
FEE: $
46.75
Come
lone
Planning and Natural Anources
EFTA00600094
Permit # 133-08 LSJ Project #1002
LSJ Project Name - Mechanical Building (Shell)
1) LSJ Personnel Preliminary waikthrough to check and correct items to prepare for C/O
inspection. Danny Vicars should lead walk through — (Pre-Inspection Check List
Attached)
2) Schedule Maguire Group Inc.— Inspection
33 Commerical Street, Suite One
Foxborough, MA 02035
Tel. 508-543-1700
Fax 508-543-5157
3) Scheduled Krauss Manning to do final inspection to insure compliance:
Tony Coffelt, CMIT
Project Manager
KMI Insrlaction Grout,
4) Correction of noncompliance issues, if any — LSJ personnel
5) Re-inspection of corrected issues — Kraus Manning
6) Occupancy forms to be completed and submitted to DPNR - Kraus Manning/LSJ
7) Final inspection — DPNR
No
BUILDING PERMIT
GOVERNMENT OF THE VIRGIN ISLANDS
—
o —
DEPARTMENT OF PLANNING AND NATURAL RESOURCES
OfYISION OP PERMITS
CYRIL F KING 'FRA1Wµ autumn-, ≥n FLUX.,
FAA IJ40110I SS32
cnatILOTTO ALIALPE. SI THOMAs V I 00002
TEL (340)7r4.3.120
PERMISSION IS HERESY GRANTED TO
LSJ, LEC
TO (Cc”"xl, Feta,. M:I
Guns t 'List Mechanical Building
DoscripIlon of SIrtICIUra
Rein!. Conc.
Leonean:
[Little St. Jame
Approximate cost of weft $
$2000,000
_
Person(s)In charge of work:
Lafayette Contractors, LLC
REMARKS:
Corrector Lion shall be done In accurdance with Tl
otion 292 of the V.1.
Building Code
Oat. Dec. 10. 2007
FEE: $
20.00
CZ41 fredsni fieZ
.53-011.
7 O7
l/A_
r-.
j
illeureen Bur
V
era, Territorial Director
COIMItilliGIS of PI•nnIrtg •nd Hamra Rneunkss
EFTA00600095
Permit #375-08
LSJ Project # 1010
LSJ Project Name - Mechanical Dual (Outfit)
1) LSJ Personnel Preliminary walkthrough to check and correct items to prepare for C/O
inspection. Danny Vicars should lead walk through — (Pre-Inspection Check List
Attached)
2) Schedule Maguire Group Inc.— Inspection
33 Commerical Street, Suite One
Foxborough, MA 02035
Tel. 508-543-1700
Fax 508-543-5157
3) Scheduled Krauss Manning to do final inspection to insure compliance:
Tony Coffelt, CMIT
Project Manager
KMI Inspection Group
4) Correction of noncompliance issues, if any — LSJ personnel
5) Re-inspection of corrected issues — Kraus Manning
6) Occupancy forms to be completed and submitted to DPNR - Kraus Manning/LSJ
7) Final inspection — DPNR
No.
375-ki
BUILDING PERMIT
Dale
:La
'6..ZOSS—
COVERNNIENT OF Tilt VIRGIN ISLANDS
— •
DEPARTMENT OF PLANNING AND NATURAL RESOURCES
eiwIlOta Or PERIWIG
0 .11% • mural muitsm "JIANG
neon
vex tam /14
1:144111.017, mat ST 14C,Ing. V. /0,32
'It Oils 214 2420
PERMISSION IS HERESY ORANIED TO
L. F.l.,,
TO cee.p....ua. a: I
anmulletlaa m elespepteal tselpesm___
DesolpPon al mans
OW.
Lormlea:
•
04. rOOMAlal foil el wort I
lalayecie Contractors
PeesoMs) on Outgo al watt
REMARKS:
Ant Ulm% I.N.
dual-
RE: $
11,704..:2
feta %ran-
:7'749
Y
I 2
Cs' reales shall—be-1=E le staorteater. 1Ih Eaglet
it
C/:
/1 -
6)/
neReanillemeese
Ceemullene• ei
r2
.
S..
EFTA00600096
Certificate of Occupancy
Pre-Inspection Check List
Health & Safety
_Egrees (exits)
_Pest Control
Grounds
_Garbage & Debris
_Grading & Drainage
_Walkways & Driveways
Exterior
_Foundation Walls
_Exterior Walls
_Roof & Rood Drainage
Windows & Doors
Interior
_Stairs, Handrails, Guardrails
_Interior Surfaces
Plumbing
Fixtures
_Water System
_Water Heater
_Sanitary Drainage
Mechanical
_A/C system
Electrical
_Ground Fault Circuit Interrupter(s)
Fire Safety
_Fire Extinguisher
_Smoke Detector
Egress -a safe, continuous and unobstructed means of egress shall be provided from the interior
Structure
Pest Control - Structures shall be generally free from wood destroying insects and rodent infestation
Sanitation —Grounds and structures shall be maintained in a clean, safe, and sanitary condition
Grading & Drainage - All premises shall be sufficiently graded and sloped in a approved manner to
prevent the erosion of soil and water accumulation around immediate perimeter of any structure
Walkways & Driveways — Free from potentially hazardous conditions or major defects.
Foundation Walls & Exterior walls— shall be free major defects, deterioration, or open cracks.
Roof - be sound, tight and not have defects that admit rain. Rood Drainage components should be
adequate to drain collected roof run-off.
Window and Doors - Frames and hardware should be in sound condition
Stairs, Handrails & Guardrails - should be in good repair and firmly fastened to support normal loads
Fixtures— free from obstructions, leak, major defects, and performing intended purpose.
Water Systems — Kitchen sinks, lavatories, laundry Facilities, bathtubs and showers should be supplied
with hot and cold running water with adequate volume and water supply to ensure fixtures to function
properly
EFTA00600097
Water Heater — Temperature not less than 110 degrees.
Sanitary Drainage — Plumbing fixtures should be properly connected to an approved disposal system,
free from obstructions, leaks and major defects
Air condition system — Ensure system is functioning properly
Electrical - Ensure system is functioning properly. Look for potential hazards, insufficient outlets
Ground Fault Interrupter— Ensure GFI are installed at potentially wet areas or where water can splash
Fire Safety - Egress, fire extinguisher , single station smoke detector, shall comply with the Uniform Fire
Code
EFTA00600098
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Dates
Document Details
| Filename | EFTA00600088.pdf |
| File Size | 1167.1 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 14,803 characters |
| Indexed | 2026-02-11T22:57:49.050495 |