Manager's Cottage
Revised Conceptual Budget
Gary :
Date:
JEE:
Date:
$220,190.00
18 July 2011
Group
Phase
Description
gti
afti
aim
Shipping ' Clearance
Total,
01
Direct Expenses
01-045
Cut & Patch
80
hrs
25.00
0.00
0.00
2,000.00
01-410
Testing
1
tot
0.00
0.00
0.00
0.00
01-420
Special Inspections
1
tot
0.00
0.00
0.00
0.00
01-512
Temporary Lighting
1
tot
500.00
0.00
0.00
500.00
01-522
Temporary Enclosures/Safety
1
tot
1,000.00
0.00
0.00
1,000.00
01-610
Material Handling
60
hrs
20.00
0.00
0.00
1,200.00
01-624
Construction Cleaning
40
hrs
20.00
0.00
0.00
800.00
01-636
Punch List
24
hrs
25.00
0.00
0.00
600.00
01-645
Expendables
1
tot
3,500.00
0.00
0.001
3,500.00
01-654
Equipment Rental
1
tot
3,000.00
0.00
0.00
3,000.00
01-665
Equipment Operation
40
hrs
25.00
0.00
0.00
1,000.00
01-900
Misc. Expenses
1
tot
1,500.00
0.00
0.00
1,500.00
Division Total
16,100.00
02
Sitework
02-050
Demolition
170
hrs
20.00
0.00
0.00
3,400.00
02-071
Disposal
42
hrs
20.00
0.00
0.00
840.00
02-281
I Pest Control
1
tot
2,000.00
0.00
0.00
2,000.00
Division Total
6,240.00
03
Concrete
03-055
Drill & Dowel
1
tot
$1,500.00
$0.001
$0.00
$1,500.00
03-130
4000# Concrete
10
cyd
$165.00
$0.001
$0.00
$1,650.00
03-170
Misc. Concrete
1
tot
$2,500.00
$0.00
$0.00
$2,500.00
03-210
Rebar
500
lbs
$3.50
$0.00
$0.00
$1,750.00
Division Total
$7,400.00
EFTA00600167
06
Wood
06-050
Fasteners
1
tot
$3,000.00
$0.00
$0.00
$3,000.00
06-100
Rou h Ca
nt
1
tot
$30,000.00
$2,500.001
$0.00
$32,500.00
06-200
06-400
Finish Carpentry
Architectural Millwork
1
1
tot
tot
$15,000.00
$0.00
$0.00
$0.00
$0.00
$15,000.00
$0.00
Division Total
$50,500.00
07
Moisture / Thermal
07-100
Waterproofing
1
tot
$3,500.00
$0.00
$0.00
$3,500.00
07-623
Copper Flashings
200
Ift
$40.00
$500.00
$0.00
$8,500.00,
$1,200.00
07-900
Sealants
1
tot
$1,200.00
$0.00
$0.00
Division Total
$13,200.00
08
Doors / Windows
08-210
Exterior Wood Doors & Frames
2
ea
$450.00
$0.00
$0.00
$900.00
08-211
Interior Wood Doors & Frames
6
tot
$300.00
$0.00
$0.00
$1,800.00
08-500
Metal Windows
6
ea
$900.00
$450.00
$0.00
$5,850.00,
$2,400.00
08-710
Finish Hardware
8
ea
$300.00
$0.00
$0.00
08-810
Mirror Glass
1
allow
$300.00
$0.00
$0.00
$300.00
Division Total
$11,250.00
09
Finishes
09-200
Plaster
3000
sft
$6.00
$1,000.00
$0.00
$19,000.00
09-300
Tile Flooring
700
sft
$10.00
$2,000.00
$0.00
$9,000.00
09-920
Interior Paintin.
1
tot
$3,000.00
$0.00
$0.00
$3,000.00
Division Total
$31,000.00
10
Specialties
10-700
Hurricane Shutters
1
tot
$21,000.00
$0.00
$0.00
$21,000.00
10-800
Toilet & Bath Accy's
1
tot
$2,500.00
$0.00
$0.00
$2,500.00
Division Total
$23,500.00
EFTA00600168
11
Specialties
11-451
Kitchen Equipment
1
tot
$4,000.00
$0.00
$0.00
$4,000.00
Division Total
;4,000.00
12
Furnishings
12-300
Cabinets
1
tot
$4,000.00
$0.00
$0.00
$4,000.00
12-310
Countertops
1
tot
$1,000.00
$0.001
$0.00
$1,000.00
Division Total
$5,000.00
15
Mechanical
15-400
Plumbing
1
sub
$15,000.00
$0.001
$0.001
$15,000.00
15-450
Fixture Allowance
1
allow
$5,000.00
$0.00
$0.00
$5,000.00
15-600
NC Systems
1
sub
$15,000.00
$0.00
$0.00
$15,000.00
Division Total
$35,000.00
16
Electrical
16-000
Electrical Complete
1
sub
$13,000.00
$0.00
$0.00
$13,000.00
16-510
Fixture Allowance
1
allow
$5,000.00
$0.00
$0.00
$5,000.00
Division Total
$18,000.00
Total
I
$220,190.00
EFTA00600169
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Document Details
| Filename | EFTA00600167.pdf |
| File Size | 133.8 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 3,691 characters |
| Indexed | 2026-02-11T22:57:50.127976 |