EFTA00600443.pdf
PDF Source (No Download)
Extracted Text (OCR)
Emad Hanna
From:
Monique Harry [
Sent:
Monday, Decanter 21, 2009 11.50 AM
To:
Gary Kerney
Cc:
Emad Hanna
Subject:
Scott Garf
Attachments:
Scott Graf Invoice #1 MSOSI.pdf
Gary,
Attached for your approval Scott Graf Invoice #1 Dated 12/18/09 in the amount of $400.00. Project
#1005 Code 02-441.
Monique
Windows Live: Keep your friends up to date AitIlithatgaiLstaanhat*
6,4 0, 1 a \ 09
1
EFTA00600443
Emad Hanna
From:
Monique Harry
Sent:
Monday, December 21, 2009 12:22 PM
To:
Emad Hanna
Subject:
FW: Scott Gad
hj
> From:
> To:
> Subject: Re: Scott Garr
> Date: Mon, 21 Dec 2009 12:20:22 -0500
> Approved. Gary
> Sent from my iPhone
> On Dec 21, 2009, at 11:49 AM, "Monique Harry"
> <
> wrote:
> > Gary,
> >
>
Attached for your approval Scott Graf Invoice #1 Dated 12/18/09 in
>
the amount of $400.00. Project #1005 Code 02-441.
> >
>
Monique
> >
> >
> >
> >
>
Windows Live: Keep your friends up to date with what you do online.
<htto://www.microsoft.com/middleeast/windows/windowsliveisee-it-in-action/social-network-
basics.asox?ocid=PID23461::T:WLMTAGL:ON:WL:en-xm:SI SB 1:092010
> > >
>
<Scott Graf Invoice #1 MSOSI.pdf>
Windows Live: Keep your friends up to date with what you do online.
EFTA00600444
SCOTT GRAF
6501 Red Hook Plaza. Suite 201
St. Thomas. USVI 00802
340-777.6064
December 18,2009
TO:
ATTN:
RE:
TIME:
340.690-0730
Office Pavilion Project - construction
505.991.0024 505-220.5911
Bill Royals 779-8054 779-8055 FAX
Monique Harry
779-8054
Steve Capplinger
Installation of piping and sleeving at office pavilion
5400.00
A total for labor performed and completed with 2 men @ 5400 per day for 12/15/09
11/10
2 men
installed 80' 1.5" water main from backside of mbr addition to backside. We also ran 1'
conduit in the same trench and stubbed out next two curb planters and back filled all
piping, Installed 4' of 1.5" water main through office pavilion roadway V sleeve.
Installed sr conduit in same sleeve for the direct burial cable access to the office
planters. We recorded all pvc fittings, etc received from distributer wholesaler in our
trailer.
TOTAL FOR THIS INVOICE - $400.00
EFTA00600445
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Phone Numbers
Document Details
| Filename | EFTA00600443.pdf |
| File Size | 223.3 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 2,199 characters |
| Indexed | 2026-02-11T22:58:14.099956 |