Master Suite Expansion
Preliminary Budget
LSJ Performed Work
May 18, 2009
Subcontractor performed work
Total costs
Phase
Description
Qty Unit
Price
Shipping
Sub
Material
Labor
Totals
General Conditions
$42,300.00
01-514
01-522
01-610
01-621
01-624
01-645
01-665
01-900
01-900
Phones
6
mos
$300.00
$0.00
LSJ
Temporary Enclosures
1
tot
$2,000.00
$0.00
LSJ
Material Handling
20
wks
$600.00
$0.00
LSJ
Temporary Protection
1
tot
$3,000.00
$0.00
LSJ
Construction Cleaning
20
wks
$300.00
$0.00
LSJ
Expendables
5
mos
$1,500.00
$0.00
LSJ
Equipment Rental
4
mos
$1,000.00
$0.00
LSJ
General Requirements- Labor
I
tot
$3,000.00
50.00
LSJ
General Requirements-Mat.
I
tot
$3,000.00
$0.00
LSJ
$1,800.00
$2,000.00
$12,000.00
$3,000.00
$6,000.00
$7,500.00
$4,000.00
$3,000.00
$3,000.00
Inspections/Testing
$15,000.00
02-000
02-000
02-000
02-000
02-000
02-000
02-000
Krauss Manning - Subcontractor
$15,000.00
SUB
Rebar inspections
10
SUB
Concrete placement inspections
10
SUB
Concrete test cylinders
50
SUB
Close in inspections
2
SUB
Electrical inspections
2
SUB
Plumbing inspections
1
SUB
SUB
$15.000.00
Survey
$3,500.00
02-005 SUB Mosley
I
total
$3,500.00
50.00
SUB
$3.500.00
Demolition
$23,070.00
02-070
02-070
02.070
02.070
02-070
02-070
02-070
02.070
02.070
02.070
02-070
02-070
02.070
02.070
02.070
Remove / Dispose outdoor
bathing area
16
hrs
$25.00
LSJ
Excavate for slab & foundation
20
hrs
$25.00
Remove / DisposeSouth wall at
extg. Indoor bathing area
40
hrs
$15.00
LSJ
Remove / Dispose roof at extg.
indoor bathing area
80
hrs
$20.00
LSJ
Remove / Dispose extg. roof
structure at new structure area
80
hrs
$20.00
LSJ
Cap existing utilities
8
hrs
$20.00
LSJ
Remove all plumbing fixtures
8
hrs
$15.00
LSJ
Remove / Dispose existing
interior partitions
80
hrs
$15.00
LSJ
Remove / Dispose all exterior
doors, windows and shutters .
16
hrs
$15.00
LSJ
floor tile
80
hrs
$15.00
LSJ
Remove / Dispose existing
wood flooring
40
hrs
$15.00
LSJ
Remove / Dispose existing
terrace rails and posts
2
hrs
$15.00
LSJ
Remove / Dispose existing
terrace columns
200 hrs
$15.00
LSJ
Remove / Dispose existing
elevated terrace beam
200 hrs
$15.00
LSJ
$400.00
$520.00
$600.00
$1,600.00
$1,600.00
$160.00
$120.00
$1,200.00
$240.00
$1,200.00
$600.00
$30.00
$3,000.00
$3,000.00
Remove dumster debris from
02-071 island
11
ea
$800.00
$&800.00
EFTA00602026
Phase
Description
Qty Unit
Price
Shipping
Sub
Material
Labor
Totals
Shoring
$10,000.00
01-150
01-150
01-150
01-150
Shore extg. roof at Dressing/Master
Bath & remove
LSJ
Shore extg. roof at Master BRM SW
Corner & remove
LSJ
Shore terrace roof & remove
LSJ
Estimated materials
LSJ
$1,440.00
$480.00
$2,080.00
$6,000.00
Pest Control
$2,260.001
02-281 Pest control
2260 sft
S1.00
$0.00
SUB
$2.260.00
Concrete
$56,146.00
03-120
03-130
03-173
03-301
03-350
Complete cast in place concrete
1
$32,000.00
$0.00
LSJ
4000# concrete
50
cyd
$150.00
$0.00
LSJ
Slab on Grade - Labor
756
sft
$3.50
$0.00
LSJ
Admixtures
50
cyd
$20.00
50.00
LSJ
Cementitious Coatings
2000 sft
$2.00
50.00
LSJ
$32,000.00
$7,500.00
$2,646.00
$1,000.00
$4,000.00
03-362 Concrete Pumping
1
tot
$9,000.00
$0.00
SUB
$9.000.00
Masonry
$32,310.00
04-220
04-221
04-450
04.451
CMU Labor
1782 ea
$2.00
$0.00
LSJ
CMU material
1782 ea
$3.00
Native Stone Veneer labor
900
ft
$22.00
$0.00
LSJ
Native stone material labor
900
ft
S4.00
$3,564.00
5346
$19,800.00
$3,600.00
Metals
$11,070.00
05-050
05-500
05-500
Metal Fastening
1
tot
$5,000.00
$0.00
LSJ
Lintels - Labor
16
hrs
$20.00
$0.00
LSJ
Lintels - Material
1
tot
$5,000.00
$750.00
LSJ
2500
$2,500.00
$320.00
$5,750.00
Wood
$158,000.00
06-050
06-100
06-100
06-130
Fasteners - Material
1
tot
$3,000.00
$500.00
LSJ
Rough Carpentry - Labor
1
tot
$25,000.00
$0.00
LSJ
Rough Carpentry - Materials
1
tot
$30,000.00 $3,000.00
LSJ
Heavy Timber Framing
1
tot
$20,000.00 $4,000.00
LSJ
$3,500.00
$25,000.00
$33,000.00
$24,000.00
06-200
06-202
06-400
Finish Carpentry - Labor
1
tot
S15.000.00
$0.00
SUB
Finish Carpentry - Materials
1
tot
$7,500.00
$0.00
LSJ
Architectural Woodwork
1
sub
S50,000.00
$0.00
SUB
$15.000.00
$50.000.00
$7,500.00
Moisture / Thermal
$115,112.00
07-212
07-212
Rigid Insulation - Labor
896
sft
$0.75
50.00
LSJ
Rigid Insulation - Material
896
sft
$2.50
$400.00
LSJ
$672.00
$2,640.00
07-240
07-413
EIFS Cornice/Gutter
224
Ift
$50.00
$0.00
SUB
Metal Roofing - Labor
3200
sft
S6.00
$0.00
SUB
$11.200.00
$19.200.00
07-412 Metal Roofing - Mat.
3200
sft
$12.00 $3,000.00
LSJ
$41,400.00
07.623
07.623
07.632
07-900
Copper Flashings - Labor
1
tot
S12.000.00
$0.00
SUB
Copper Flashings - Material
1
tot
$20,000.00 $1,000.00
LSJ
Downspout Rough - L&M
1
tot
$4,000.00
$0.00
LSJ
Joint Sealants - L&M
1
tot
$3,000.00
$0.00
LSJ
$12.000.00
$21,000.00
2000
$2,000.00
2000
$1,000.00
Doors and Windows
$166,080.00
08-210
08-210
08-215
08-215
08-211
08.211
Wood Doors/Frames/Shutters - La 8
ea
$350.00
$0.00
LSJ
Wood Doors/Frames/Shutters - M; 8
ea
$10,000.00 $2,000.00
LSJ
GlassSliding doors / role down
shutters
2
ea
$350.00
GlassSliding doors / role down
shutters
2
ea
$8,000.00 $1,500.00
Int. Doors & Frames - Mat.
3
ea
$5,000.00
$0.00
LSJ
Int. Doors & Frames - labor
3
ea
$350.00
$0.00
LSJ
$2,800.00
$82,000.00
$700.00
$17,500.00
$15,000.00
$1,050.00
08-370 Glass Shower Enclosures
1
allow
S15,000.00
$0.00
SUB
$15,000.00
08-610 Windows/Shutters - Labor
1
ea
$350.00
$0.00
LSJ
$350.00
EFTA00602027
Phase
Description
City Unit
Price
Shipping
Sub
Material
Labor
Totals
I
08-610
08-710
08-710
Windows/Shutters - Material
1
tot
$2,500.00
$750.00
LSJ
Finish Hardware - Labor
40
hrs
$25.00
$0.00
LSJ
Finish Hardware - Material
1
total
$25,000.00
$0.00
LSJ
$3,250.00
$1,000.00
$25,000.00
08-810 Mirror Glass - L&M
54
sft
$45.00
$0.00
SUB
$2.430.00
Finishes
$146,795.00
09-120
09-200
Ceiling Support - Flat
Plaster
1
tot
$13,000.00 $2.000.00
LSJ
900
sft
$10.00
50.00
LSJ
$15,000.00
$9,000.00
09-300 Wall Stone Tile - Labor
1600
sft
$5.00
$0.00
SUB
$8.000.00
09-300 Wall Stone Tile - Material
1600
sft
$5.00 $2,200.00
LSJ
$10,200.00
09-300 Stone Stone tile Flooring - Labor 1172 sft
$5.00
$0.00
LSJ
$5.860.00
09-300 Stone stone tile Flooring Material 1172 sft
$5.00 $1,800.00
LSJ
$7,660.00
09-500
09-560
09-600
Wood Ceilings
Wood Flooring
Granite Countertops/ tub
slabs/steam room
1
tot
$35,000.00 $4,000.00
SUB
488
sft
$25.00
$500.00
SUB
75
sft
$225.00
$0.00
SUB
$39.000.00
$12.700.00
$16.875.00
I
09-910
09-920
Exterior Painting
Interior Painting
1
tot
$5,000.00
$0.00
LSJ
I
tot
$0.00
LSJ
$5,000.00
7500
$10,000.00
Specialties
$9,330.00
10-800
10-800
Toilet Accessories - Mat.
Toilet Accessories - Labor
1
tot
$8,500.00
$350.00
LSJ
24
hrs
$20.00
$0.00
LSJ
$8,850.00
$480.00
Steam Room Equipment
$19.200.00
13-130 Steam Room Equipment
1
total
$18,000.00 $1,200.00
LSJ
$19,200.00
Plumbing
$23,500.00
15-400 - Supply, waste piping, rough in
$12,000.00
SUB
$12.000.00
15-450 - Fixtures allowance
$10,000.00
1500
LSJ
$11,500.00
HVAC
$87,600.00
Remove and relocate exisitng AC
15-800 condensing units -
15-800 Installing all new system similar to
$2,600.00
SUB
$2.600.00
the Office Pavilion
$85.000.00
Electrical
$75,000.00
16-000 Electrical Complete
1
sub
$35,000.00
$0.00
SUB
$35.000.00
16-500
16-700
Fixtures
Communications
I
allow $35,000.00
50.00
LSJ
I
allow
$5,000.00
50.00
LSJ
$35,000.00
$5,000.00
Sub Total
$996.273.00 $380,425.00
$412.456.00 $203.392.00
6996.273.00
Contingency, 5%
$49,813.65 $19,021.25
$20.622.80 $10.169.60
$49.813.65
Total
61.046.086.65 5399,446.25
5433.078.80 6213.561.60
61.046.086.65
Landscaping not included
Furnishings not included
General Conditions does not Include costs for Supervisors, Project Managers or Project Assistants, as
per Previous Office Pavillion & Mechanical Budgets
EFTA00602028
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Dates
Document Details
| Filename | EFTA00602026.pdf |
| File Size | 229.1 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 8,415 characters |
| Indexed | 2026-02-11T22:58:23.748070 |