EFTA00603223.pdf
Extracted Text (OCR)
Gul£stream
PRELIMINARY INVOICE
A OMMRAI. DYNAMIC* COMPANY
550 Connole Street - Brunswick. Georgia 31525
ParVModel #: CIV
AC Serial No)Tail No.:
Mail Remittance To:
Gulfstream Aerospace Corporation
P.O. Box 730349
Dallas, Texas 75373-0349
Overnight Remittance To:
Gulfstream Aerospace Corporation (Box # 730349)
do JP Morgan Chase Bank, NA
ATTN: Dallas National Wholesale Lockbox TXI-0029
14800 Frye Road
Ft. WOrdl, TX 76155
Wire Remittance To:
Ciulfstrcam Aerospace Corporation
JP Morgan Chase Bank, NA
Chicago, IL 60670
Fedwire Routing No. (ABA) 021 000 021
S.W.I.F.T. CHASUS33
ACH Credit Routing No. (ABA)071 000 013
Bill To: JEGE LLC
C/O GALAXY AVIATION INC
ATTN: LARRY VISOSKI
3800 SOUTHERN BLVD, SUITE 204
WEST PALM BEACH, Florida 33406
United States
Title: JEGE LLC
Invoice Number.
Invoice Date:
Customer IDI
P.O. Number.
Repair Station:
In Date:
Out Date:
Payment Type:
Payment Terms:
1/19/2017
FAA CRS GR4D216111
01/13/2017
01/21/2017
Net 30-Open terms
INVOICE SUMMARY FOR WORK ORDER NUMBER:
Time & Materials
Flat Rate
Total
Labor USD:
$39,016.28
50.00
$39,016.28
Parts USD:
$34,180.66
$1,560.65
$35,741.31
Services USD:
$0.00
51,500.00
$1,500.00
Detail Subtotal USD:
$73,196.94
$3,060.65
$76,257.59
Subtotal USD:
$76,257.59
Funds on Deposit USD:
$0.00
Total USD:
$76,257.59
For detail description of the work complied with see the Work Order Detail report.
Unless otherwise indicated, all financial values listed in this document arc in US Dollars (USD).
GAC_WorkOrderPreliminaryInvoice.rpt 2011
Page 1 of 22
Printed: 1/19/2017 4:33:16PM
Ref:312
EFTA00603223
Bill To:
Invoice Number
Item: I
AIRFRAME Culfstream CIV
Team Manager.
Jeff Stahl
Customer Coordinator:
James White
Discrepancy: 1.1
Resolution:
Step: 1.1.1
kciurn tm acre ice
Open
Inspection Labor Only
Part/Model tr: CIV
AC Serial No./Tail No.:
TSNJTSO:
CSN/CSO:
Aircraft Time:
Discrepancy: 1.2
Comply with Inbound and Outbound Inspections in accordance with Traveler RSQCT-57 Rev. 21
Resolution: Complied with Inbound/Outbound Inspection per RSQCT - 56 Rev. 17
Labor USD:
No Charge
N/ C
Step: 1.2.1
Completed
Inbound Preliminary Inspection
Step: 1.2.2
Open
Outbound Inspection
Step: 1.23
Open
SC Maintenance/Hangar/ Primary Codes / Touch Labor Only
Step: 1.2.4
In Progress
Inspection Labor Only
Discrepancy: 13
Resolution:
Accomplish Preflight Inspection
Step: 1.3.1
Open
Step: 1.3.2
Open
Insure key has been returned to acft or customer if removed
SC Maintenance/Hangar/ Primary Codes / Touch Labor Onb
Discrepancy: 1.4
Resolution:
Tool Clearance
Discrepancy: IS
CMP CIV NISC3 010010-Service Center Maintenance Induction Checklist
Resolution: Complied with Service Center Maintenance Induction Checklist.
For detail description of the work complied with see the Work Order Detail report.
Unless otherwise indicated, all financial values listed in this document are in US Dollars (USD).
GAC_WorkOrderPreliminaryInvoice.rpt 2011
Page 2 of 22
Printed: 1/19/2017 4:33:16PM
Ref:312
EFTA00603224
Bill To:
Invoice Number:
Discrepancy: 1.6
Advise customer of preservation requirements per chapter 10 of the relevant maintenance manuals for airframe.
engines, and APU; review requirements in relation to scheduled outdate and possible extensions of outdate: and
perform maintenance or preservation actions as directed by the customer and documented on the work order item
list.
Resolution: Advised customer of preservation requirements. None requested.
Discrepancy: 1,7
Billable Consumables & Shop Supplies (% per published Rate Letter), calculated based on the total labor revenue
man-hours invoiced on work order.
Resolution: Completed as Required
Billing Method
I Inure
Rate
Total
Parts USD:
Flat Rate
41,560.65
Total USD:
41,560.65
Discrepancy: IS
Cover and Protect Aircraft Interior and Exterior as Required
Resolution: Completed as Required
Labor USD:
No Charge
N/ C
Discrepancy: 1.9
Service Chemical Toilet Clean Galley
Resolution: Completed as Required
Labor USD:
NO Charge
NI C
Discrepancy: 1.10
Arrival! Departure Assist & Video Aircraft
Resolution: Completed as Required
For detail description of the work complied with see the Work Order Detail report.
Unless otherwise indicated, all financial values listed in this document are in US Dollars (USD).
GAC_WorkOrderPreliminaryInvoice.rpt 2011
Page 3 of 22
Printed: 1/19/2017 4:33:16PM
Ref:312
EFTA00603225
Bill To:
Invoice Number.
Discrepancy: 1.11
Comply with hydraulic fluid contamination checks on the hydraulic cart.
Resolution: Completed as Required
Discrepancy: 1.12
Aircraft Cleaning
Resolution: Completed as Required
Discrepancy: 1.13
FUEL
Resolution:
Step: 1.13.1
Open
FUEL/ DEFUELAS REQUIRED
Step: 1.13.2
Open
TICKET =
GALLONS FUELED=
DATE =
Item: 6
AVIONICS
Team Klanager.
Jeff Stahl
Customer Coordinator:
James White
Part/Model 14: GIV
AC Serial No./Tail No.:
TSN/TSO:
CSNICSO:
Aircraft Time:
Discrepancy: 6.1
Copilot DLIDI erratic. (Shakes)
"Customer on Bopp***
Resolution: Removed and replaced Copilot Standby DDRMI / DBDI
P/N 520-3030-003 SIN 11534 with REPAIRED P/N 520-3030-003 S/N 210. Performed operational checks and compass
swing with no defects noted. Reference items 11.8, 11.10, and 11.13 for work performed.
Billing Method
Hours
Rate
Total
Labor USD:
Time and Material
ST
9.95
®
5136.00
51,353.20
Labor USD:
Time and Material
OT
0.47
®
5204.00
595.88
Parts USD:
Time and Material
46,382.00
For detail description of the work complied with see the Work Order Detail report.
Unless otherwise indicated, all financial values listed in this document are in US Dollars (USD).
OAC_WorkOrderPreliminaryInvoicerpt 2011
Page 4 of 22
Printed: 1/19/2017 4:33:16PM
Ref:312
EFTA00603226
Bill To:
Invoice Number:
Total USD:
57,831.08
Pans:
Re. No.
Pan number:
Description
Quantity
Sell price USD
Extended USD
6.1 NI
520-3030-003
INDICATOR, BEARING DISTANCE
I
56,382.00
$6,382.00
Step: 6.1.1
Step: 6.1.2
Completed
Inspection Labor Only
Completed
AV1 Electrical Labor Only
Discrepancy: 6,2
/42 IRU intermittent fail message.
Note: Customer has already swapped IRU's and FWC's and problem didn't follow. Customer suspects a faulty
bus controller.
Resolution: Removed and Replaced Bus Coupler 5M16 P/N 1159SCAV400-I SRI 5105 with "NEW" P/N 1159SCAV400-1 S/N 031767,
and Coupler 55A24 P/N 1159SCAV400-1 S/N 4357 with "NEW" P/N 1159SCAV400-1 S/N 031766. Performed operational
checks with no defects noted. Reference 11.14, 11.15, 11.18, and 11.19 for work performed.
See steps for details of work performed.
Billing Method
I tours
Rate
Total
Labor USD:
Time and Material
ST
2033
fa
$136.00
$2,792.08
Labor USD:
Time and Material
OT
0.89
'a
$204.00
$181.56
Parts USD:
Time and Material
$1,318.24
Total USD:
54,291.88
Parts:
Ret. No.
Part number.
lkseription
Quantity
Sell price USD
Extended USD
6.203
1159SCAV400-1
COUPLER
2
5659.12
$1,318.24
Step: 6.2.1
Completed
Inspection Labor Only
Step: 6.2.2
Completed
AV1 Electrical Labor Only
Step: 6.2.3
Completed
Trouble shoot IRU system 02 with power on aircraft and radio master on IRU 01 and 02
fails (that's normal) Selected IRU on only the 01 fail message cleared indicating the
flight guidance is not seeing IRU data during the power up test. Swapped 1RU 02 with
IRU 01 still failed swapped IRU back to original locations. Swapped FCC 01 and 02 still
failed, swapped FGC back to original locations. More trouble shooting required.
Step: 6.2.4
Completed
Swapped NAV computers 01 and 02 still failed swapped NAV computers back to original
locations. Removed IRU 02 checking pins. all looks good, reinstalled IRU 02. Started to
check FCC and IRU computers by placing the aircraft in maintenance mode checking
ASCB data. the aircraft failed to go in to maintenance mode, also noticed aircraft
airspeed at 50 knots indicating the aircraft is in the air mode. After speaking with
costumer maintenance tech was advised this airspeed at 50 knots in normal for this
aircraft. Re-racked both FGC reboot aircraft system now abele to go into maintenance
test. Access maintenance test checking the FGC on ASCII data buss they checked good..
Checked the IRU. The 01 IRUis on the ASCB data buss. The 02 IRU is not received on
ASCB data buss. After 2 hours IRU 02 faults cleared IRU checked good in maintenance
test howed on ASCB date buss. I suspect buss coupler 55A16 and 55A24 for IRU 02
bad, place 2 on order.
Discrepancy: 63
Rill AFT up-wash light loop.
Resolution: Removed and replaced the aft right hand up-wash light and performed the operational check with no defects noted per
the CIV Supplemental Manual 25-20-30.
For detail description of the work complied with see the Work Order Detail report.
Unless otherwise indicated, all financial values listed in this document arc in US Dollars (USD).
GAC_WorkOrderPreliminaryInvoice.rpt 2011
Page 5 of 22
Printed: 1/19/2017 4:33:16PM
Ref:312
EFTA00603227
Bill To:
Invoice Number:
Billing Method
I lours
Rate
Total
Labor LSD:
Time and Material
ST
3.75 Ir
5136.00
S510.00
P.,ri. LSD:
Time and Material
S80.65
Total USD:
5590.65
Parts:
Ref: No.
Pan number:
Description
Quantity
Sell price USD
Extended USD
63#1
AL-1235-T-1320
LAMP
I
$80.65
$80.65
Step: 6.3.1
Step: 6.3.2
Step: 6.33
Completed
Hangar( Primary Codes /Touch Labor Only
Completed
Inspection Labor Only
Completed
AVE / Electrical Labor Only
Discrepancy: 6.4
During trouble shooting of the IRS SQWK.. Found the aircraft will not go into maintenance test and airspeed at
50 knots constantly
Resolution: Suspected there was trash in the pilot static lines, Complied with CIV MM 34-01-00 pitot static system drain and purging.
We did get some mud bobber out of the lines but airspeed still at 50 knots, contacted the current customer maintenance
group and was told the 50 knots in normal for this aircraft. pulled the FCC CB and re-rack FCC #1 and #2 reset CB
aircraft then accessed the maintenance test page. No further action required.
Labor USD:
No Charge
Step: 6.4.1
Completed
Hangar / Primary Codes / Touch Labor Only
Step: 64.2
Completed
Inspection Labor Only
Step: 6.43
Completed
Mil / Electrical Labor Only
Step: 6.4.4
Completed
PITOT/STATIC RECONCECF CHECK REQUIRED
Step: 6.4.5
Open
Operational test required for MCI and 2 removed for troubleshooting.
Item: 7
INTERIOR
Team Manager.
Jett Stahl
Customer Coordinator:
James NN bite
Pan/Model #: GIV
AC Serial No./Tail No.:
TSN/TSO:
CSN/CSO:
Aircraft Time:
Discrepancy: 7.1
Per customer request comply with the following cleaning polish items
4 club scat leather cleaning. (Fwd four)
4 ea "E" window surround polish.
Polish Left and Right inlet cowlings.
Polish Left and Right TR's
Resolution: Completed as Requested
Services USD:
Billing Method
Hours
Rate
Total
Flat Rate
$1,500.00
Total USU:
51,500.00
For detail description of the work complied with see the Work Order Detail report.
Unless otherwise indicated, all financial values listed in this document arc in US Dollars (USD).
GAC_WorkOrderPreliminaryInvoicerpt 2011
Page 6 of 22
Printed: U19/2017 4:33:16PM
Ref:312
EFTA00603228
Bill To:
Invoice Number.
Item: 8
MECHANICAL
Team Manager.
Jeff Stahl
Customer Coordinator:
James While
Part/Model N: cay
AC Serial No./Tail No.:
TSN/TSO:
CSN/CSO:
Aircraft Time:
DisercpancN: 8.1
Repair Left and Right Wheel Wells Corrosion.
itcsolumm: installed final rivet on lower inboard of Left Hand trailing edge per B/P 1159N`40226 and 1159W40504 Rev C. All work
performed ref Engineering Disposition: Acceptable alternate fastener with 130 degree head is GAF511AB3-xx. Use in
areas inaccessible to install b/p Composilok type fasteners due to installation tool. u304769 MRB 028
Engineering Disposition: Acceptable to trim material from "L" clip for seal reatiner installation to maintain clearance
with Sponson plate lug. Maintain minimum 2 X dia edge distance on rivets. Condition due to production variation. Touch
up 213, 2012 per GAFI4A. u304769 MRB 028
Engineering Disposition: Use IIL18-08 IliLok pin with IIL70 collar per GANIPS2206 as alternate fastener in horizontal
holes and NAS1919M05 rivets per GAMPS2232 in vertical holes at subject outbd locations for MLG seal retainer
structure due to fastener and installation tool availability. Touch up 213, 2012 process code, holes and surfaces, per
GAF14A. u304769 MRB 028
Billing Method
Hours
Rate
Total
Labor USD:
Time and Material
ST
131.17
6f.,
$136.00
$17,839.12
Labor USD:
Time and Material
OT
4.25 (e!..,
$204.00
$867.00
Labor USD:
Time and Material
ST
4.00 (e!..,
$222.00
$888.00
Parts USD:
Time and Material
$4,396.10
Total USD:
$23,990.22
Parts:
Rel. No.
Part number:
Description
Quantity
Sell price USD
Extended USD
8.1 HI
1159W40226-1IB
ANGLE
I
$614.44
$614.44
8.1 #2
I159W40226-12B
ANGLE
I
S284.92
$284.92
8.1 #3
HLGPL9SP-V05B03
PIN
21
$8.00
$168.00
8.1 #4
SLFC-MV05
COLLAR
80
$5.48
$438.40
8.1 #5
GASI3AN-1-41
SEAL, BUTTONED STRIP, WHEEL
2
$113.42
$226.84
WELL DOOR (5' SECTION)
8.1 #8
GAFMIAB08-200
BLIND RIVET
60
$9.27
$556.20
8.1 #9
HLGPL9SCV05B03
PIN
70
$6.42
$449.40
8.1 #10
HLGPL9SP-V06804
LOCK BOLT
10
$10430
$1,043.00
8.1 #11
NASI399C5-3
RIVET
16
$433
$69.28
8.1 #14
GMS5005-II
EPDXY PRIMER COATING, 3012
1
$7.64
$7.64
TYPE II- 1 OZ KIT
8.1 HIS
GAF511AB08-300
RIVET-BLIND,SELF LOCKING
8
$22.90
$183.20
8.1#16
GAF511AB3-300
BLIND BOLT
10
$16.64
$166.40
8.1 H2O
PR1440B1-2-654
SEALANT, 6 OUNCE #654 SEMK IT
I
$52.56
$52.56
1/2 HOUR WORK LIFE
8.1#21
GAISHAB08-200
BLIND RIVET
10
$9.27
$92.70
8.1 #22
GMS5005-II
EPDXY PRIMER COATING, 3012
1
$7.64
$7.64
TYPE II- 1 OZ KIT
8.1 #23
GMS5005-II
EPDXY PRIMER COATING, 3012
I
$7.64
S7.64
TYPE II- 1 OZ KIT
For detail description of the work complied with see the Work Order Detail report.
Unless otherwise indicated, all financial values listed in this document arc in US Dollars (USD).
GAC_WorkOrderPreliminaryInvoice.rpt 2011
Page 7 of 22
Printed: 1/19/2017 4:33:16PM
Ref:312
EFTA00603229
Bill To:
Invoice Number.
Pans:
Ref. No.
Pan number:
Description
Quantity
Sell price USD
Extended USD
8.1824
NASI921M05-06
RIVET
4
56.96
$27.84
For detail description of the work complied with see the Work Order Detail report.
Unless otherwise indicated, all financial values listed in this document arc in US Dollars (USD).
GAC_WorkOrderPreliminaryInvoice.rpt 2011
Page 8 of 22
Printed: 1/19/2017 4:33:16PM
Ref:312
EFTA00603230
Bill To:
Invoice Number:
Step: 8.1.1
Completed
Hangar/ Primary Codes /Touch Labor Only
Step: 8.1.2
Completed
Inspection Labor Only
Step: 8.1.3
Completed
Painted LIH and RfH breather angles per Ramps 4000 per customers request
Step: 8.1.4
Completed
Removed corroded 1.11 and RH gear door aft seal support angles 1159W40226-11 and
059W40226-12.
Step: 8.1.5
Completed
Disassembled LH and RH gear door support angles.
Step: 8.1.6
Completed
Match drilled new LI1 gear door aft seal support angle pin 1159W40226-I I per CAMPS
8316.
Step: 8.1.7
Completed
Match drilled new RH gear door aft seal support angle p/n 1159W40226-12 per CAMPS
8316.
Step: 8.1.8
Completed
Assembled LH gear door aft seal support angles p/n 1159W40226-1 land
1159W40226-15 per GAC Drawing 1159W40504 rev C.
Step: 8.1.9
Completed
Assembled RH gear door aft seal support angles pin 1159W40226-12 and
059W40226-I6 per CAC Drawing 1159W40504 rev C.
Step: 8.1.10
Completed
Request engineering disposition to fill extra hole on angle bracket pin 1159WII40201-29.
Step: 8.1.11
Completed
Request engineering disposition to use alternate fastner for clearance issues as required.
Blueprint fastner pin GAB512GC. Request to use either Jo-bolt pin GAF311AB or
Hi-tigue pin GABMOGT.
Step: 8.1.11.1
onipleted
Engineering Disposition: Acceptable alternate fastener with 130 degree head is
GAFMIAB3-xx. Use in areas inaccessible to install b/p Composilok type fasteners due to
installation tool. u304769 MRB 028
Step: 8.1.12
Completed
Engineering Disposition for step 8.1.10: Double flush plug extraneous 430 hole in
059WM40201-29 clip only with "AD" rivet material. Backdrill from adjacent hole and
install hip fastener. Touch up process code 213. 2012 per GAF14A. u304769 MRB 028
Step: 8.1.13
onipleted
Recieved ok to install and installed all but four fastners throught RJH brakets P/N
1159W40226-12 and 1159W40226-16 per drawing 1159WH40201 Rev. B.
(Four fastners not installed Marked with streamer and tape).
Step: 8.1.14
Completed
REQUEST ENGINEERING REVIEW USE OFALTERNATE FASTENERS ON LIB
AND RAI FWD LOWER TfE BOX BRACKETS GOING THROUGH THE
1159W40226-11 AND -12 AND THE -13 CLIP (0/8 2 HORZ HOLES). ALTERNATE
FASTENERS ARE ALSO NEEDED FOR THE FASTENERS GOING THROUGH
THE -II AND -12 AND THE -17AND -III CLIPS (0/8 2 VERT HOLES).
REQUESTING USE OF HILOCS FOR THE HORZ HOLES AND BLIND RIVETS
FOR THE VERTICAL HOLES DUE TO INTERFERENCE ISSUES.
Step: 8.1.14.1
Completed
Engineering Disposition: Use 11118-08 HiLok pin with HI..70 collar per GANIPS2206 as
alternate fastener in horizontal holes and NASI919M05 rivets per GAMPS2232 In
vertical holes at subject undid locations for MLG seal retainer structure due to fastener
and installation tool availability. Touch up 213,2012 process code, holes and surfaces.
per GAF14A. u304769 MRB 028
Step: 8.1.15
Completed
REQUEST ENGINEERING REVIEW TRIMMING THE LM 1159W40226-13 "I."
CLIP FOR CLEARANCE FROM SPONSON RIB AFT LU(.
Step: 8.1.15.1
Completed
Engineering Disposition: Acceptable to trim material from "I." clip for seal reatiner
installation to maintain clearance with Sponson plate lug. Maintain minimum 2 X dia
edge distance on rivets. Condition due to production variation. Touch up 213. 2012 per
GAFI4A. u304769 MRB 028
Step: 8.1.16
Completed
R/H Wing Lower Trailing Edge Box. Installed QTY 2 H118-08 HiLoks with HL 70
Collars in the bin (yrm) most horizontal holes. Installed QTY 2 NAS1919h105 Blind
Rivets in the () r
vertical holes (FWD of the Composite Panel). All work Completed
per Eng. Disposition in step 8.1.14.
Step: 8.1.17
Completed
Install Rill and till Aft Gear well Seal.
Step: 8.1.18
Completed
Complied with Engineering Disposition for step 8.1.10: Double flush plug extraneous
830 hole in I159WM40201-29 clip only with "AD" rivet material. Backdrill from
adjacent hole and install b/p fastener. Touch up process code 213.2012 per GAFI4A.
u304769 MRB 028
Step: 8.1.19
Completed
Complied with Engineering Disposition for step 8.1.10: Double flush plug extraneous
#30 hole in I159WM40201-29 clip only with "AD" rivet material. Backdrill from
adjacent hole and install b/p fastener. Touch up process code 213.2012 per GAF14A.
u304769 MRB 028
For detail description of the work complied with see the Work Order Detail report.
Unless otherwise indicated, all financial values listed in this document arc in US Dollars (USD).
GAC_WorkOrderPreliminarylnvoice.rpt 2011
Page 9 of 22
Printed: 1/19/2017 4:33:16PM
Ref:312
EFTA00603231
Invoice Number:
Bill To:
Step: 8.1.20
Completed
Step: 8.1.21
Completed
Installed 1.11 gear door aft seal support angles p/n 1159W40226-11and 1159W40226-15
per GAC Drawing 1159W40504 rev C. Except one rivet inboard lower TE Box. All
work performed ref Engineering Disposition: Acceptable alternate fastener with 130
degree head is GAF511AB3-xx. Use in areas inaccessible to install b/p Composite:4c type
fasteners due to installation tool. u304769 MRS 028
Engineering Disposition: Acceptable to trim material from "I." clip for seal reatiner
installation to maintain clearance with Sponson plate lug. Maintain minimum 2 X dia
edge distance on rivets. Condition due to production variation. Touch up 213. 2012 per
GAF14A. u304769 MRB 028
Engineering Disposition: Use 111.18-08 HiLok pin with 111.70 collar per GAMPS2206 as
alternate fastener in horizontal holes and NASI919N105 rivets per GANIPS2232 in
vertical holes at subject outbd locations for MLG seal retainer structure due to fastener
and installation tool availability. Touch up 213,2012 process code, holes and surfaces.
per GAF14A. u304769 MRB 028
Installed final rivet on lower inboard of Left Hand trailing edge per B/P I159W40226
and 1159W40504 Rev C. All work performed ref Engineering Disposition: Acceptable
alternate fastener with 130 degree head is CAE5IIAB3-xx. Use in areas inaccessible to
install b/p Composilok type fasteners due to installation tooL u304769 MRB 028
Discrepancy: 8.2
Comply with full bleed air system integrity check per acft AMM.
Resolution: Complied with full bleed air system integrity check per G1V AMM 21-00-00. 36-00-00 and 36-13-00. No defects noted.
Billing Method
Hours
Rate
Total
Labor USD:
Time and Material
ST
70.20 (t,
$136.00
$9,547.20
Labor USD:
Time and Material
OT
4.21
€1;
$204.00
$858.84
Parts USD:
Time and Material
$81.07
Total USD:
$10,487.11
Parts:
Ref. No.
Pan number:
Description
Quantity
Sell price USD
Extended USD
8.242
S2L226
0 -RING SEAL FLUOROCARBON
4
$4.17
$16.68
(VITON) LOW COMPRESSION. 2.00
IN.
8.243
S2L226
0-RING SEAL. FLUOROCARBON
4
51.17
$16.68
(VITON) LOW COMPRESSION. 2.00
IN.
8.287
GAC835MG2OP
CONTACT
10
$0.78
$7.80
8.288
GAC115P1
LUBRICANT/SEALANT-SILICONE
1
539.91
$39.91
For detail description of the work complied with see the Work Order Detail report.
Unless otherwise indicated, all financial values listed in this document are in US Dollars (USD).
0AC_WorkOrderPreliminaryInvoice.rpt 2011
Page 10 of 22
Printed: 1/19/2017 4:33:16PM
Ref:312
EFTA00603232
Bill To:
Invoice Number.
Step: 8.2.1
Completed
Hangar/ Primary Codes /Touch Labor Only
Step: 8.2.2
Completed
Inspection Labor Only
Step: 8.23
Completed
Performed Air Conditioning operational test per GIV MM 21-00-00.
Step: 8.2.4
Completed
Performed Bleed Air Configuration Annunciation operational test per GIV MM
21-00-00.
Step: 8.2.5
Completed
Performed Bleed Air System- Operational test Per GIV MM 36-00-00.
Step: 8.2.6
Completed
Removed the APU Air Check valve and performed an APU Air Chick Valve - Inspection.
Ref. 11.6 for inspections
Step: 8.2.7
Completed
Installed the APU Air check valve per GIV MM 36-13-00.
Ref. item 11.7 for Installation.
Step: 8.2.8
Completed
Complied with Tempurature Control Valve ( Cockpit ) - Removal/Installation per CMP
GIV 216082. Swapped Cockpit and cabin temperature control valves for
troubleshooting purposes.
Reference item 11.3 for ChIP task card
Removed PN: 397122-2-1
Removed SN P-502
Installed PN: 397122-2-I
Installed SN: 1335
Step: 8.2.9
Completed
Complied with Tempurature Control Valve ( Cabin ) - Removal/Installation per CMP
GIV 216080. Swapped Cockpit and cabin tempurature control valves for
troubleshooting purposes.
Reference item 11.4 for CMP task card
Removed PN: 397122-2-I
Removed SN: 1335
Installed PN: 397122-2-I
Installed SN: P-502
Step: 8.2.10
Completed
Complied with Servo Air Pressure Regulator Valve ( Cockpit ) - Removal/Installation
per CMP GIV 212055. Swapped Cockpit and Cabin Servo Air Pressure Regulators for
troubleshooting purposes.
Reference item 11.1 for CN1P task card
Removed PN: 3214068-2-1
Removed SN: 1076
Installed PN: 3214068-2-1
Installed SN: 1074
Step: 8.2.11
Completed
Complied with Sono Air Pressure regulator Valve ( Cabin ) - Removal/Installation per
CMP GIV 212056. Swapped Cockpit and Cabin Servo Air Pressure Regulators for
troubleshooting purposes.
Reference item 11.2 for CN1P task card
Removed PN: 3214068-2-I
Removed SN: 1074
Installed PN: 3214068-2-1
Installed SN: 1076
Step: 8.2.12
Completed
Leak checked the precooler inlets and fan air valves on the pylons.
For detail description of the work complied with see the Work Order Detail report.
Unless otherwise indicated, all financial values listed in this document arc in US Dollars (USD).
GAC_WorkOrderPreliminaryInvoice.rpt 2011
Page II of 22
Printed: 1/19/2017 4:33:16PM
Ref:312
EFTA00603233
Bill To:
Invoice Number:
Step: 8.2.13
Completed
Complied with ACM Bypass Shutoff Valve ( Left ) - Removal/Installation per ChIP GIV
212085. Swapped valves for troublshooting purposes.
Reference item 11.11 for CMP task card
Removed PN: 3289922-2-1
Removed SN: 326
Installed PN: 3289922-2-1
Installed SN: 335
Step: 8.2.14
Completed
Complied with ACM Bypass Shutoff Valve ( Righ )- RemovaUlnstallation per ChIP GIV
212086. Swapped valves for troublshooting purposes.
Reference item 11.12 for CMP task card
Removed PN: 3289922-2-1
Removed SN: 335
Installed PN: 3289922-2-I
Installed SN: 326
Step: 8.2.15
Completed
Complied with resistance cks to cabin anticipator and both temp sensors per GIV.ANINI
21-01-05 and 21-01-06. all readings ek good. Complied with comparison readings of
cockpit and cabin overhead rheostats during with the cabin was found to be INOp in all
auto settings. Replacement overhead control panel on order.
meter # 567201. Due 05/17
Step: 8.2.16
Completed
During troubleshooting. cabin and cockpit anticipator were swapped per GIV ANINI
21-01-06. need to be re-installed in origional locations.
Step: 8.2.17
Completed
While running A/C system found this A/C has a switch dividing cabin and cockpit temp
control panels. Complied with A/C system ops ck per GIV MM 21-00-00. All systems
check good with no abnormal sounds or vibrations at fwd seats.
Discrepancy: 8.3
Left hand wing lower TE box has three oversized holes where angle was removed in item 8-1. Each hole marked
with tape.
Resolution: FILLED DICREPANT HOLES WITH 50/50 MIXTURE OF RESIN AND CHOPPED CARBON FIBER PER
ENGINEEERING DISPOSITION IN STEP BELOW.Redrilled and recountersunk holes after resin cure. Installed B/P
fastners. All work done per engineering disposition in step 8.4.1.1 and drawing 1159W1I40201.
Billing Method
Hours
Rate
Total
Labor USD:
Time and Material
ST
8.00
(iThir,
$136.00
$1,088.00
Total USD:
41,088.00
Step: 8.3.1
Completed
Request Engineering disposition for repair countersink hole lower left hand TE box
Step: 8.3.1.1
Completed
Engineering Disposition: Fill c'sk hole with 50/50 mixture of EA956 B/A and chopped
carbon fiber cloth. Allow full cure and re-drill for b/p fastener. u304769 MRB 028
Step: 8.3.2
Completed
Service Engr Labor Only
Step: 8.3.3
Completed
SC Maintenance/Hangar/ Primary Codes / Touch Labor Only
Step: 8.3.4
Completed
Inspection Labor Only
Discrepancy: 8.4
Right hand wing lower TE box has three oversized holes where angle was removed in item 8-1. Each hole marked
with tape
Resolution: FILLED DICREPANT HOLES WITH 50/50 MIXTURE OF RESIN AND CHOPPED CARBON FIBER PER
ENGINEEERING DISPOSITION IN STEP BELOW.Redrilled and recountenunk holes after resin cure. Installed B/P
fastners. All work done per engineering disposition in step 8.4.1.1 and drawing 1159W1I40201.
For detail description of the work complied with sec the Work Order Detail report.
Unless otherwise indicated, all financial values listed in this document arc in US Dollars (USD).
GAC_WorkOrderPrcliminaryInvoice.rpt 2011
Page 12 of 22
Printed: 1/19/2017 4:33:16PM
Ref:312
EFTA00603234
Bill To:
Invoice Number:
Billing Method
Hours
Rate
Total
Labor USD:
Time and Material
ST
4.95
@,
S136.00
$673.20
Labor USD:
Time and Material
OT
1.27
@,
S204.00
$259.08
Total USD:
$932.28
Step: 8.4.1
Step: 8.4.1.1
Step: 8.4.2
Step: 8.4.3
Step: 8.4.4
Step: 8.4.5
Completed
Request Engineering disposition for repair countersink hole lower right hand TE box
Completed
Engineering Disposition: Fill c'sk hole with 50/50 mixture of EA956 B/A and chopped
carbon fiber cloth. Allow full cure and re-drill for b/p fastener. u304769 MRB 028
Completed
Service Engr Labor Only
Completed
SC 3Iaintenance/Hangar / Primary Codes / Touch Labor Only
Completed
Inspection labor Only
Completed
Redrillcd and recountersunk holes after resin cure. Installed B/P fastners. All work done
per engineering disposition in step 8.4.1.1 and drawing I159W1140201.
Discrepancy: 8.5
Left hand and right hand turbine bypass shut off valve requires safety wire on cannom plug.
NO LABOR
Resolution: Safetled left and right hand turbine bypass shut off s als e carillon plugs as per GIV AMM 20-70-41.
Discrepancy: 8.6
CUSTOMER REQUESTS TO REMOVE IAI AND RAI WATER SEPERATORS AND INSPECT FOR
POSSIBLE PRESSURIZATION ISSUES WITH BLEEDS ON.
Resolution: Removed tilI and Rill water separator as per CIV CMP 217070 and 217071, Ref. 11.24 and 11.25. Performed water
separator bag inspection as per GIVAMM 21-01-12 PG. 301.
SEE 8.7 AND 8.8 FOR SQUAWKS
SEE 11.24 AND 11.25 FOR REMOVALAND REPLACEMENT OF MI AND RAI WATER SEPERATORS.
Billing Method
Hours
Rate
Total
Labor USD:
Time and Material
ST
4.00
@
$136.00
$544.00
Parts USD:
Time and Material
$691.78
Total USD:
S1,235.78
Pans:
Rd. No.
Pan number:
Description
Quantity
Sell price USD
Extended USD
8.6 #1
83237-20
SOCK, WATER SEPARATOR,
2
532729
$655.78
CONDENSER BAG
8.6 #3
S2L-232
O-RING SEAL, FLUOROCARBON
4
59.00
$36.00
(VITON) LOW COMPRESSION, 2.75
IN.
Step: 8.6.1
Completed
Removed LIR and 12. 11 ss aster sepa
as per GIV CMP 217070 and 217071, Ref. 11.24
and 11.25. Performed %sorer separator bag Inspection as per GIV AM NI 21-01-12 PC.
301.
For detail description of the work complied with sec the Work Order Detail report.
Unless otherwise indicated, all financial values listed in this document arc in US Dollars (USD).
GAC_WorkOrderPreliminaryInvoice.rpt 2011
Page 13 of 22
Printed: 1/19/2017 4:33:16PM
Ref:312
EFTA00603235
Bill To:
Discrepancy: ti
Left hand water separator condensor assembly has pitting corrosion of vanes.
Invoice Number.
REF 11.24 FOR R&R
Resolution: Repair recertify and return to stock
Part 91
Billing Method
Hours
Rate
Total
Parts USD:
Time and Material
$10,630.82
Total USD:
$10,630.82
Pans:
Ref. No.
Pan number
Description
Quantity
Sell price USD
Extended USD
8.7 #1
2340186-2-3
SEPARATOR, WATER
I
$10,600.00
$10,600.00
8.7 #2
521.345
0 -RING SEAL, FLUOROCARBON
2
$15.41
$30.82
(VITON) LOW COMPRESSION. 4.00
IN.
Discrepancy: 8.8
Right hand water separator condensor assembly has pitting corrosion of vanes.
REF 11.25 FOR R&R
Resolution: Repair, recertify, and return to stock
Part 91
Billing Method
Hours
Rate
'fetal
Parts USD:
Time and Material
$10,600.00
Total USD:
$10,600.00
Parts:
Ref. No.
Pan number:
Description
Quantity
Sell price USD
Extended USD
8.8 NI
2340186-2-3
SEPARATOR, WATER
1
S10.600.00
$10,600.00
Discrepancy: 8.9
Resolution:
Durin- preflight LH art p) loo light failed to operate.
Item: 9
PAINT
Team Manager.
Jeff Stahl
Customer Coordinator.
James White
Pan/Model #: GIV
AC Serial No./Tail No.:
TSNUTSO:
CSN/CSO:
Aircraft Time:
For detail description of the work complied with see the Work Order Detail report.
Unless otherwise indicated, all financial values listed in this document are in US Dollars (USD).
GAC_WorkOrderPreliminaryInvoice.rpt 2011
Page 14 of 22
Printed: 1/19/2017 4:33:16PM
Ref:312
EFTA00603236
Bill To:
Invoice Number.
Discrepancy: 9.1
Blow in Lill and R/II AI•T wheel wells where repairs was made
Resolution: Complied with perpping and repainting area behind the I./II and R/II AFT wheel wells where repairs was made. PER
CAMPS 4000
Billing Method
I lours
Rate
Total
Labor USD:
Time and Material
ST
11.17
(a;
$136.00
$1,519.12
Total USD:
41,519.12
Step: 9.1.1
Step: 9.1/
Completed
SC Paint Labor Only
Completed
Complied with prepped.applied and sanded overcoat to contour then masked off 1./H
and RIB AFT lower wings just AFT of wheel wells per stamps 4000
Item: 10
OUTSTANDING PARTS, MATERIALS AND I OR SERVICES AT DEPARTURE
Team Manager
Jeff Stahl
Customer Coordinator:
James White
PartiModel 0: GIV
AC Serial No./Tail No.:
TSNUTSO:
CSN/CSO:
Aircraft Time:
Discrepancy: 10.1
Resolution:
Engineering Labor
Discrepancy: 10.2
Resolution:
Backorder Parts
Services USD:
Services:
No Charge
N/C
Ref. No.
Description
Quantity
Sell Price USD
Extended USD
10.2 PI
10.2 #2
CLEANING A/C EXTERIOR
CLEANING A/C INTERIOR
1.00
1.00
$0.00
$0.00
$0.00
$0.00
Discrepancy: 103
Parts to be Returned
Resolution:
Parts USD:
No Charge
N/C
Services USD:
No Charge
N/C
Parts:
Ref. No.
Part number.
Description
Quantity
10.3 04
S2L345
O-RING SEAL, FLUOROCARBON
4
(VITON) LOW COMPRESSION. 4.00
IN.
For detail description of the work complied with see the Work Order Detail report.
Unless otherwise indicated, all financial values listed in this document are in US Dollars (USD).
GAC_WorkOrderPreliminaryInvoice.rpt 2011
Page 15 of 22
Printed: 1/192017 4:33:16PM
Ref:312
EFTA00603237
Bill To:
Invoice Number.
Services:
Ref: No.
Description
Quantity
10.3 MI
VENDOR SERVICES
1.00
Item: 11
FOLLOW ON CMP/ MAINTENANCE TASKS
Team Manager.
Jeff Stahl
Customer Coordinator.
James White
Pan/Model 4: ay
AC Serial No./Tail No.:
TSNUTSO:
CSN/CSO:
Aircraft Time:
Discrepancy: 11.1
CMP GIV 212055 VA, Cockpit Servo Air Press Reg
Ref 8.2
Resolution: COMPLIED WITH CMP GIV 212055 VA, Cockpit Servo Alr Press Reg
Discrepancy: 11.2
CMP GIV 212056 VA, Cabin Servo Air Press Reg
Ref 8.2
Resolution: COMPLIED WITH CMP GIV 212056 VA, Cabin Servo Air Press Reg
Discrepancy: 11.3
CMP GIV 216082 Valve, Cockpit Tempature Control
Ref 8.2
Resolution: COMPLIED WITH CMP GIV 216082 Valve, Cockpit Tempature Control
Discrepancy: 11.4
CMP G1V 216080 Valve. Cabin Tempature Control
Ref 8.2
Resolution: COMPLIED WITH CMP GIV 216080 Vale. Cabin Tempature Control
For detail description of the work complied with sec the Work Order Detail report.
Unless otherwise indicated, all financial values listed in this document are in US Dollars (USD).
GAC_WorkOrderPreliminaryInvoice.rpt 2011
Page 16 of 22
Printed: 1/19/2017 4:33:16PM
Ref:312
EFTA00603238
Bill To:
Invoice Number.
Discrepancy: 11.5
CMP CIV 215005 Air Conditioning System—OPS Test
Ref 8.2, 11.1, 11.2, 11.3, & 11.4
Resolution: COMPLIED WITH CMP GIV 215005 Air Conditioning System—OPS Test
Discrepancy: 11.6
CMP CIV 361053 APU Air Check Valve - Removal I Installation
Ref 8.2
Resolution: COMPLIED WITH CMP GIV 361053 APU Alr Check Valve - Removal / Installation
Discrepancy: 11.7
CMP CIV 361056 APU Air Check Valve - Inspection
Ref 8.2
Resolution: COMPLIED WITH CMP GIV 361056 APU Air Check Valve - Inspection
Discrepancy: 11.8
CMP GIV 342032 Copilot Standby DDRMI DBDI - Removal / Installation
REF Item 6.1
Resolution: COMPLIED WITH CMP CIV 342032 Copilot Standby DDRMI DBDI - Removal / Installation
part number off:520-3030-003
serial number off:11534
part number on:520-3030-003
serial number on:1210
Discrepancy: 11.9
CMP GIV 342038 Compass Swing No. 2
REF item 6.1
Resolution: Entered in error. Canned squawk was for 342037 #1 Compass Swing. #2 Compass swing was required by 6.1.
For detail description of the work complied with sec the Work Order Detail report.
Unless otherwise indicated, all financial values listed in this document are in US Dollars (USD).
GAC_WorkOrderPreliminaryInvoice.rpt 2011
Page 17 of 22
Printed: 1/19/2017 4:33:16PM
Ref:312
EFTA00603239
Bill To:
Invoice Number.
Discrepancy: 11.10
CMP CIV 342034 Standby DDRMI / DBDI Indicator - Operational Check
REF item 6.1
Resolution: COMPLIED WITH CMP GIV 342034 Standby DDRMI I DBDI Indicator - Operational Check
Tic Box - CN: 567976 Cal Due: 11117
Discrepancy: 11.11
CMP GIV 212085 Air Cycle Machine Bypass Shutoff Valve (Left) - Removal / Installation
Ref. 8.2
Resolution: COMPLIED WITH CMP GIV 212085 Air Cycle Machine Bypass Shutoff Valve (Left) - Removal/ Installation
Discrepancy: 11.12
CMP CIV 212086 Mr Cycle Machine Bypass Shutoff Valve (Right) - Removal / Installation
Ref. 8.2
Resolution: COMPLIED WITH CMP GIV 212086 Aft Cycle Machine Bypass Shutoff Valve (Right) - Removal Installation
Ref. 8.2
Discrepancy: 11.13
Chili GIV 342038 Compass Swing No. 2
Resolution: COMPLIED WITH CMP GIV 342038 Compass Swing No. 2
Discrepancy: 11.14
CMP CIV 314116 ASCB DATA COUPLER (55A16)
Ref item 6.2
For detail description of the work complied with sec the Work Order Detail report.
Unless otherwise indicated, all financial values listed in this document are in US Dollars (USD).
GAC_WorkOrderPreliminaryInvoice.rpt 2011
Page 18 of 22
Printed: 1/19/2017 4:33:16PM
Ref:312
EFTA00603240
Bill To:
Invoice Number.
Resolution: COMPLIED WITH CMP GIV 314116 ASCB DATA COUPLER (55A16)
part number off: I159SCAV400-1
serial number off:5105
part number on:1159SCAV400-1
serial number on:031767
Parts USD:
No Charge
N/ C
Discrepancy: 11.15
CMP GIV 314124 ASCB DATA COUPLER (55A24)
Ref Item 6.2
Resolution: COMPLIED WITH CMP GIV 314124 ASCB DATA COUPLER (55A24)
part number off:1159SCAV400-1
serial number off4357
part number on:1159SCAV400-1
serial number on:031766
Parts USD:
No Charge
N/ C
Discrepancy: 11.16
cm> GIV 342034 Standby DDRMI / DBDI Indicator -Operational Check
Resolution: DUPLICATE SQUAWK SEE ITEM 11.10 FOR SQUAWK RESOLUTION
Discrepancy: 11.17
CMP GIV 344067 BATTERY PACK, #3 IRU
Resolution: Item written in error
Discrepancy: 11.18
CMP CIV 344006 Inertial Reference Unit No. 2 - Removal / Installation
Resolution: COMPLIED WITH CHIP GIV 344006 Inertial Reference Unit No. 2 - Removal / Installation. Reference item 6.2
part number off:11G1075AEO3
serial number off:208/AE02
part number on::HG1075AEO3
serial number on:2081AE02
For detail description of the work complied with see the Work Order Detail report.
Unless otherwise indicated, all financial values listed in this document are in US Dollars (USD).
GAC_WorkOrderPreliminaryInvoice.rpt 2011
Page 19 of 22
Printed: 1/19/2017 4:33:16PM
Ref:312
EFTA00603241
Bill To:
Invoice Number:
Discrepancy: 11.19
CMP CIV 344086 Attitude and Heading Reference System / Inertial Reference Unit - Operational Check.
Reference item
Resolution: COMPLIED WITII CMP CIV 344086 Attitude and Heading Reference System /Inertial Reference Unit - Operational
Check
Discrepancy: 11.20
CMP CIV 216050 Selector, Cabin Tempature Cont Removal/Installation
Cabin Overhead Temp Rehostat INOP
Ref. 8.2
Resolution: COMPLIED WITH CMPGIV 216050 Selector, Cabin Tempature Cent Removal! Installation
P/N OFF: 622150-1-1
S/N OFF: 068C-0229
PIN ON: 622150-1-1
S/N ON: 026C-0035
Ref. 8.2
Discrepancy: 11.21
CMP CIV 216050 Selector, Cabin Tem pat wee ( tint RC [Ill
II/
Original Pan installed
Ref. 8.2
Resolution: COMPLIED WITH CMP GIV 216050 Selector, Cabin Tempature Cent
P/N OFF: 622150-1-1
S/N OFF: 026C-0335
PIN ON: 622150-1-1
S/N ON: 068C-0229
Discrepancy: 11.22
CMP CIV 341076 Pitot / Static System (Pilot) - Reconnect Check
For detail description of the work complied with sec the Work Order Detail report.
Unless otherwise indicated, all financial values listed in this document are in US Dollars (USD).
GAC_WorkOrderPreliminaryInvoice.rpt 2011
Page 20 of 22
Printed: 1/19/2017 4:33:16PM
Ref:312
EFTA00603242
Bill To:
Invoice Number.
Resolution: COMPLIED WITH CMP GIV 341076 Pitot / Static System (Pilot) - Reconnect Check
DPS 5000- 560115 2/17
IFR 6000 566411 12/17
Discrepancy: 11.23
CMP CIV 341093 Picot / Static System (Copilot) - Reconnect Check
Resolution: COMPLIED WITH CMP GIV 341093 Pilot / Static System (Copilot) - Reconnect Check
DPS 5000- 56015
CAL DATE 2/17
IFR 6000- 566411
CAL DATE 12/17
Discrepancy: 11.24
CMP CIV 217070 Water Separator, I.
Ref. 8.6
Resolution: COMPLIED WITH CMP GIV 217070 Water Separator. L
P/N off 2340186-2-3
S/N off 87-283
P/N on 2340186-2-3
S/N on 1101
Discrepancy: 11.25
CMP GIV 217071 Water Separator, R
Ref. 8.6
Resolution: COMPLIED WITH CMP GIV 217071 Water Separator. R
P/N off 2340186-2-3
S/N off 87-289
P/N on 2340186-2-3
S/N on 47-845
Discrepancy: 11.26
Comply with clearance check of newly installed IA and Rt T/E box angles. Ref. item 8.I.
For detail description of the work complied with see the Work Order Detail report.
Unless otherwise indicated, all financial values listed in this document are in US Dollars (USD).
GAC_WorkOrderPreliminaryInvoice.rpt 2011
Page 21 of 22
Printed: 1/19/2017 4:33:16PM
Rd:312
EFTA00603243
Bill To:
Invoice Number.
Resolution: Complied with clearance check of newly Installed Lt and Rt
box angles per CIV AMM 32-00-00, no defects noted.
Communications concerning disputed debts, including a check or other instrument
tendered as MI satisfaction of a debt, must be forwarded to:
Gulfstream Aerospace
Ann: Credit Manager
M/S 13-05
PO BOX 2206,
Savannah, GA 31402
For detail description of the work complied with see the Work Order Detail report.
Unless otherwise indicated, all financial values listed in this document arc in US Dollars (USD).
GAC_WorkOrderPreliminaryInvoice.rpt 2011
Page 22 of 22
Printed: 1/19/2017 4:33:16PM
Ref:312
EFTA00603244
Document Preview
Extracted Information
People Mentioned
Organizations
Locations
Document Details
| Filename | EFTA00603223.pdf |
| File Size | 1117.7 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 41,384 characters |
| Indexed | 2026-02-11T22:59:12.334589 |
Related Documents
Documents connected by shared names, same document type, or nearby in the archive.