EFTA00604303.pdf
PDF Source (No Download)
Extracted Text (OCR)
ASPHALT COW.
Betteroads Asphalt Corp.
PO Box 301946
Bid Letter
St Thomas, VI 00803
Date: June 17, 2014
Tel
Re: Asphalt Pavements
To: Little St. James
Attn: Anna
Email: annrodriquezgyahoo.com
Dear Anna,
We am pleased to provide you with the competitive proposal.
Project: Asphalt Paving
Little St. James Island
Sent Via Email
•
The Scope of Work is as follows;
o Prepare and level sub base.
o Eradicate and remove weeds and organic materials from sub base.
o Compact sub base to insure stability
o Apply Tack Coat prior to asphalt placement.
o Place new 2 inch asphalt overlay.
•
The areas are of the following size; 13,000 SY
•
Costs of work;
o Site Preparation (includes removal of organic material)
$37,000.00
o Tack Coat =1,950 GAL @ $16.00 per
$31,200.00
o Asphalt Paving = 1,500 Tons @ $375.00 per
$562,500.00
o Mobilization @ 12%
$75.680.00
Total Costs
$706,384.00
*Total Costs quoted inclusive of labor, equipment, materials and materials related costs, but is
exclusive of barging to and from Little St. James Island.
Contract Price: $706,384.00, for the total scope of work
Respectfully,
Eason
Jeffers
Oigialty signed by. Eason Jeffers
ON; CN - Eason Jena's email -
a
erseemdi.net C - VI 0
toads Asphalt COrp. Cu -
$1/I Genet.) Manager
e. 2014.06.17 10:28:17
0400
Bid Letter
EFTA00604303
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Dates
Document Details
| Filename | EFTA00604303.pdf |
| File Size | 56.0 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 1,345 characters |
| Indexed | 2026-02-11T23:00:11.360834 |