EFTA00606397.pdf
PDF Source (No Download)
Extracted Text (OCR)
en/ 40/ 400.
10:0f
a eau:148494
BRAISLY RIOCERT
førtist
3517,
DZ.Z
PAGE
.e2
GSR Technolotpee
14 Dartmouth Road
Mountain Lakes. NJ 07048
To
The Epstein Rordent
II east 71r
Now York, NY 10021
P.U. tt
Terms
Du* on risesIpt
Description
GSR eel supply end natal 4 new steam valves and
hot water aittetnantal bypass valve on the two
Neataxonanea in the hawthorn Prazonly one valve
Is not openeitc and 3 are leakirs9. we will Insist'
valves. fe Yoke Us* power to vanes actuators and test
with the existirg automation system.
qty 4 508-0030 star valves and 1 508-0031
. instillation 2 man two days
APPROVED
APR 20 ?Mg
RICHARD BARNET'.
ficliettrads,netscape net
Dato
2009-04-07
Invoice I
40
Ship To
Ship Data
200904-07
D JO Data
2000-04-07
Other
(Ay
Rate
Amount
0.00
0.00
IS;
MOO
3,17500
0;
125.001
0.00
973 334.5494
Total
973 334.5494
PaymanbiCretlits
Balance Due
c4t
6606.-?'
$3,175.00
e-
EFTA00606397
Emad Hanna
From:
Sent:
To:
Subject:
Fro
To:
Subject: Fw : 71st
Date: Fn, 27 Mar 2009 17:01:10 -0400
Richard Barnett
Thursday, May 0 , 2009 11:48 AM
Emad Hanna
FW: 71st
Begin forwarded message:
From:
Date:
ar
.
To: Rich Remelt
Subject: net
HI Rich, so I got a few answers from JE..
He asked if you could send a photo of your new work area so he can get a sense of how the
room looks now with the equipment and decide if we should put a countertop on etc.,
He said you should go over to the Frick museum and just ask them about the reason for the
cameras they installed looking into )E's house
He said yes, to putting blinds on all the doors going out to the terrace; we can get the same
ones as we have in the kitchen area on 6th floor
We will replace the desk on the 5th floor with )E's current desk here in the Palm Beach
office once we leave here.
He does want to change the striped walls, but doesn't know what to yet
He said yes to putting up window shades in the bathroom windows on the 5th floor
He said yes to finishing the kitchen on the 5th floor; adding appliances, replacing the floor
He wants to replace the carpet in the elevator. He likes one I found at Tai Ping, so I will look
into getting it custom made; what is the size needed? maybe I should get 2 sets made?
He said yes to buying halogen lamps for the yoga room to try and match the ones in the
gym
He said we should try and get the carpet on the 5th floor cleaned to try and get the
markings out; see if that helps
We should get the carpet in the elephant room cleaned and see if the black stuff comes out
first-beforeme-consider_replacing it
m..He approved the GSR Technologies estimate for replacirs the_steam_valveS_Nt$7,175.015:,
I see 2 quotes for painting the security office and lunch room; one is for $4425.00 and one
is for $7675.00; which one is accurate so I can try and get it approved?
.IE commented that the stone floor of the 6th floor terrace needs to be cleaned; is this
something you're waiting to do once the weather is nice?
Regarding the walls on the 4th floor guest rooms; he said he knows those rooms need to be
redone, but I don't think it's something he wants to think about right now; maybe when
he's back and meet with designers, etc.. not on his priority list..
Hope this all helps..
1
EFTA00606398
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Phone Numbers
Document Details
| Filename | EFTA00606397.pdf |
| File Size | 374.7 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 3,306 characters |
| Indexed | 2026-02-11T23:01:46.814730 |