Back to Results

EFTA00606397.pdf

Source: DOJ_DS9  •  Size: 374.7 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

en/ 40/ 400. 10:0f a eau:148494 BRAISLY RIOCERT førtist 3517, DZ.Z PAGE .e2 GSR Technolotpee 14 Dartmouth Road Mountain Lakes. NJ 07048 To The Epstein Rordent II east 71r Now York, NY 10021 P.U. tt Terms Du* on risesIpt Description GSR eel supply end natal 4 new steam valves and hot water aittetnantal bypass valve on the two Neataxonanea in the hawthorn Prazonly one valve Is not openeitc and 3 are leakirs9. we will Insist' valves. fe Yoke Us* power to vanes actuators and test with the existirg automation system. qty 4 508-0030 star valves and 1 508-0031 . instillation 2 man two days APPROVED APR 20 ?Mg RICHARD BARNET'. ficliettrads,netscape net Dato 2009-04-07 Invoice I 40 Ship To Ship Data 200904-07 D JO Data 2000-04-07 Other (Ay Rate Amount 0.00 0.00 IS; MOO 3,17500 0; 125.001 0.00 973 334.5494 Total 973 334.5494 PaymanbiCretlits Balance Due c4t 6606.-?' $3,175.00 e- EFTA00606397 Emad Hanna From: Sent: To: Subject: Fro To: Subject: Fw : 71st Date: Fn, 27 Mar 2009 17:01:10 -0400 Richard Barnett Thursday, May 0 , 2009 11:48 AM Emad Hanna FW: 71st Begin forwarded message: From: Date: ar . To: Rich Remelt Subject: net HI Rich, so I got a few answers from JE.. He asked if you could send a photo of your new work area so he can get a sense of how the room looks now with the equipment and decide if we should put a countertop on etc., He said you should go over to the Frick museum and just ask them about the reason for the cameras they installed looking into )E's house He said yes, to putting blinds on all the doors going out to the terrace; we can get the same ones as we have in the kitchen area on 6th floor We will replace the desk on the 5th floor with )E's current desk here in the Palm Beach office once we leave here. He does want to change the striped walls, but doesn't know what to yet He said yes to putting up window shades in the bathroom windows on the 5th floor He said yes to finishing the kitchen on the 5th floor; adding appliances, replacing the floor He wants to replace the carpet in the elevator. He likes one I found at Tai Ping, so I will look into getting it custom made; what is the size needed? maybe I should get 2 sets made? He said yes to buying halogen lamps for the yoga room to try and match the ones in the gym He said we should try and get the carpet on the 5th floor cleaned to try and get the markings out; see if that helps We should get the carpet in the elephant room cleaned and see if the black stuff comes out first-beforeme-consider_replacing it m..He approved the GSR Technologies estimate for replacirs the_steam_valveS_Nt$7,175.015:, I see 2 quotes for painting the security office and lunch room; one is for $4425.00 and one is for $7675.00; which one is accurate so I can try and get it approved? .IE commented that the stone floor of the 6th floor terrace needs to be cleaned; is this something you're waiting to do once the weather is nice? Regarding the walls on the 4th floor guest rooms; he said he knows those rooms need to be redone, but I don't think it's something he wants to think about right now; maybe when he's back and meet with designers, etc.. not on his priority list.. Hope this all helps.. 1 EFTA00606398

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Extracted Information

Phone Numbers

Document Details

Filename EFTA00606397.pdf
File Size 374.7 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 3,306 characters
Indexed 2026-02-11T23:01:46.814730
Ask the Files