EFTA00606399.pdf
PDF Source (No Download)
Extracted Text (OCR)
Dominik Ziewiec
Attn: Richard Barnett
9 East 71°` .
Sep.01.2008.
Proposal to exchange two glass door window panels.
1. Protection of work area.
2. Removing existing damaged window glass panels.
3. Installing new glass panels.
4. Installing finishing moldings around the glass panels.
5. Repainting to match existing color and finish.
Total cost of labor: $ 500.00
Total cost of material: $ 328.89
Total amount due: $ 828.89
aAjui " TV
,N=1
EFTA00606399
Emad Hanna
From:
gmax
Sent:
Tuesday, September 02, 2008 12:39 PM
To:
Emad Hanna
Subject:
Re: Approval
Ok..
On 9/2/08 12:19 PM, "Emad Hanna" <
G,
Please provide approval for the attached quote.
Thanks
Emad Hanna
Project Controller
> wrote:
EFTA00606400
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA00606399.pdf |
| File Size | 60.6 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 736 characters |
| Indexed | 2026-02-11T23:01:46.836281 |