Back to Results

EFTA00606964.pdf

Source: DOJ_DS9  •  other  •  Size: 44.5 KB  •  OCR Confidence: 85.0%
View Original PDF

Extracted Text (OCR)

Paul Ferreras, P.E. Structural Engineer PO Box 600122 St. Thomas VI 00801 Name /Address Gary Kerney LSJ LLC Construction 6100 Red Hook Qtr Suite A2-7 St. Thomas, USVI 00802 Estimate Date Estimate # 7/712011 200972 Project Cottage 85' x 53' Little St. James St. Thomas, USVI Project Cottage Item Description Hours Cost Total Scope of Work Engineering Engineering Using Architect Design Development Plans - Prepare Construction Documents for obtaining DPNR permits. Assist Owner with Permit Acquisition. Structural Design of Building with Details, prepare Floor Plans, Elevations, Structural, Plumbing & Electrical Plans. Plot Plan (based on survey Owner). Building Permits (assuming CM by Owner) Budget We will make revisions prior to Design & Drawings without charge. revisions after Design / Drafting will be at our standard rates. Should the foregoing be acceptable, please sign, date and return to may schedule your work. Approved: Dated: by Arty us so we 1 0 12,000.00 150.00 12,000.00 0.00 It's a pleasure working with you! Total $12.000.00 EFTA00606964

Document Preview

Extracted Information

Locations

Document Details

Filename EFTA00606964.pdf
File Size 44.5 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 1,109 characters
Indexed 2026-02-11T23:01:59.120233

Related Documents

Documents connected by shared names, same document type, or nearby in the archive.

Ask the Files