Construction Proposal
August 7, 2O15
By the Contractor:
Betteroads Asphalt Corporation
For the Project:
LSJ_Added Aggregate Base
Little St. James Island
VI
SCOPE OF WORK:
Place and compact 3 inches aggregates base as per plan
TOTAL BASE PRICE:
Project Totals:
$90,712.00
Name
Aggregate
Quantity
Unit Cost
Unit
Total Cost
Crushed stone Aggregate Base
1360
530.00
Ton
540.800.00
Materials Transport
Trucking and Hauling
68
$400.00
Each
$27.200.00
Excavation and Fill
Loading and/or Spreading Base
Structural Compaction
1360
$3.00
$5.00
Ton
Ton
54.080AX)
S6.800.00
1360
Company Overhead
Company Overhead Percentage
15.00% I
$0.00
Percent of Costs
SI 1.832.00
Grand Total
$90,712.00
Page 1 of 2
L.1.1 Added Aggregate Proposal
EFTA00608342
Document Preview
Extracted Information
Locations
Document Details
| Filename | EFTA00608342.pdf |
| File Size | 37.5 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 785 characters |
| Indexed | 2026-02-11T23:02:22.224275 |
Related Documents
Documents connected by shared names, same document type, or nearby in the archive.