Zorro Development Corp - Project Report 11/22/13
31 - MICROWAVE &
START
EST.COST
NOTES
PHOTO
STATUS
if
4/27/13 — JE requested to investigate Microwave option
5/9/13 — Existing Microwave details forwarded to JE, RK & JR
5/16/13 — JE requested contacting Dam Baumann reference
delivery of service from Sandia Crest verses D Mark
5/17/13 — Dam Baumann forwarded details of RSM — Craig
Franck. Brice has been in contct with Craig
5/24/13 — Received bid from Southwestern Wireless, have call
set up for 5/28/13 to review bid
5/31/13 — Forwarded update of Project to JE, RK & JR
6/8/13 — Forwarded TW Telecom proposal for Delivery of Service
to JE & RK. Firm bids due 6/14/13
6/14/13 — Received bid from Southwestern Wireless confirming
details. Informed JE, will forward once all details confirmed
ADoroval JE
6/2W13 — JE approved Southwestern Wireless bid.
RK to negotiate final bid
6/27/13 — Southwestern Wireless unable to deliver bundled T1
6/28/13 — Looking into other options
7/12/13 — Awaiting proposal from Advanced Comm
Will review proposed Link Plan with JE on site
8/14/13 — Proposal received
8/15/13 — Conference call completed with RK, BG, SD & RB
8/17/13 — Advanced Comm on site to review Project with JE
8/18/13 — Confirming Advanced Comm require Service Provider
before their can engineer final solution
8/26/13 — Filed a complaint with PRC NM regarding Century Link
backing out of Service Provider option. 10 days to respond
8/27/13 — Contacted Steven Grabiel (High Speed Internet
Edgewood) Expect Proposal 8/6/13. Will forward once in hand
8/29/13 — Received Proposal from RMC for x 3 40ft poles
Page 1
EFTA00608664
Zorro Development Corp - Project Report 11/22/13
9/17/13 — Received Proposal from High Speed Internet.
$500.00 per mth for 10 mbps plus $10000.00 to run Ethernet
Cable to Tele Beeper shed on Sandia Crest
ADoroval JE
9/19/13 — JE approved site vast by HugesNet
9/20/13 — Have forwarded info to HugesNet, awaiting installation
date. Order #5709982. Once installation is complete & account
active, final details of package will be added.
9/23/13 — Received proposal from Advanced Comm on
Upgrading Router & Wireless Links to RC & Lodge
9/27/17 - Forwarded to RK & Di proposals from RMC
Electric & Advanced Comm. Awaiting Direction
9/3W13 — HugesNet due on site
10/1/13 — Postponed HugesNet until direction provided
HugesNet Order been cancalled — Site Account # (SAN)
SNE 00042454
10/10/13 — Proposal from Advanced Comm forwarded to JE.
RK is to review. Awaiting Direction
10/28/13 - 10/30/13 - Terrace Rabsalt on site to review project
Awaiting Proposal
11/1/13 — Forwarded to Terrence Access Point Schedule & Map
11/4/13 - Proposal from Terrence received forwarded to
RK, MT & BG. Awaiting Direction
11/21/13 — Reestablished install of HughesNet Order #5988745
Awaiting contact for installation date
Awaiting
Direction
Awaiting
Direction
Awaiting
Direction
Page 2
EFTA00608665
Zorro Development Corp - Project Report 11/22/13
22 - LANDSCAPING
START
):ND
EST.cOST
NOTES
PHOTO
STATUS
MU
06/01/13
$75,000.00 3/28/13 — Refurbishment & Mainteance Proposals from 3
companies forwarded to RK & DI
Approval JE
4/27/13 — JE approved Aspen for Refurbishment Project & Aspen
to remain as ZDC Mainteance Company
5/9/13 — New Proposal forwarded to JE, RK awaiting direction
5/16/13 — Final proposal forwarded to RK
5/24/13 — Aspen agreed to $75,000.00
5/31/13 — Deposit of $44,383.08 issued to Aspen
6/1/13 — Project Started
6/8/13 — Work continues, soil preperation in progess
6/14/13 — Plant material starting to arrive
6/18/13 — More plant materail on site
6/21/13 — Back Parking Area - Planting & Irrigation Complete
6/22/13 — Planting & Irrigation continues — attached photos
6/26/13 — More plant material on site
6/27/13 — Preperation of front parking area begins, Columbines
& Trumpert Vine planted along pathway between MH & Dog Pen
Irrigation installed In all planted areas — attached photos
7/12/13 — Plant & Irrigation installation continues —
Attached plant schedule & photos
7/26/13 — Project 90% Complete
Having Issues locating Cypress Trees.
Approval JE
8/7/13 — JE decided not to install Cypress Trees, in lu Aspen will
7
remove 4 old Hawthorns & replace with 4 Junipers
8/9/13 — Final Breakdown of Project forwarded to JE
8/10/13 — JE to meet Jose from Aspen to review Project
Approval JE
8/11/13 — JE updated request — remove old Hawthorns & Junipers
8/22113 — Forwarded to JE suggested colourful plant,
Awaiting_
material selected for discussed areas — awaiting direction
Direction
Page 3
EFTA00608666
Zorro Development Corp - Project Report 11/22/13
8/24/13 — Awaiting Proposals - 3 vendors for Preventive Spraying
& Fertilizing of new & exisiting plant material due by 9/24/13
9/16/13 — Aspen Landscaping removed old Hawthorns & Junipers
attached photos
9/26/13 — Forwarded to RK, 3 Proposals for Preventive
Spraying & Fertilizing
9/27/13 — Forwarded to JE & RK photo of proposed
Awaiting
Junipers, 6 — 7 ft, larger would be available In the Spring.
Direction
10/4/13 — Awaiting direction
10/22/13 — JE has requested that Preventive Spraying &
Fertilizing to be completed by ZDC.
Forwarded cost of spraying equipment to MT. $4,809.95
Awaiting
Awaiting Direction
Direction
Approval JE
10/30/13 — JE Approved placement of Christmas Trees (pines) in
the locations where Junipers were to be planted. After Winter vist
they would be planted elsewhere on the Ranch
11/1/13 — Will forward proposal by 11/13/13
11/13/13 — Awaiting Pines to become available, before proposal
can be forward.
11/22/13 — Pines due to be available locally 11/23/13
Page 4
EFTA00608667
Zorro Development Corp - Project Report 11/22/13
22A - LANDSCAPt
LIGHTING
START
END
EST.COST
NOTES
PHOTO
STATUS
4/27/13 — JE Approved New Landscape Lighting
5/1/13 — Unable to move forward until Project 22 — Landscaping
has been resolved
6/1/13 — Reviewing with Aspen about plant location
7/18/13 — Have installed Lighting where planting is complete
7/27/13 — Before proceeding will review with JE on site
8/22/13 — Will Complete Project once Project 22 — Landscaping
MH Complete
11/22/13 — Project will be completed Spring 2014
Project
To Be
Completed
Spring 2014
Page 5
EFTA00608668
Zorro Development Corp - Project Report 11/22/13
22B IN HOUSE -
START
END
EST.COST
NOTES
PHOTO
STATUS
LANDSCAPING
Approval JE
06/03/13
4/27/13 — JE Approved, removal of dead Pine in courtyard,
removal of Ponderosa Pines, Landscape Lighting at front
Enterance & to relocate Pinons to the area
6/3/13 — Project Started
6/18/13 — Removal of Pine & Ponderosa Pine complete -
attached photos
7/19/13 — Relocation/Installation of Pinons from remote areas of
the Ranch to front enterance continues
7/27/13 — Project 90% complete, will review with JE while on site
8/21/13 — Reviewed area with JE, outlining scope of work
8/29/13 - Removal of dead & infected Pinions — Complete
9/18/13 — Forwarded to JE & RK estimate — hand dug & plant
Pinions by Aspen Landscaping $375.00 per tree
To purchase & plant locally 8ft to10ft trees $150.00 per tree
Estmated number of trees, MH —12, LV —14
9/22/13 — Awaiting Direction
Aooroval JE
$5,040.00
9/24/13 — JE Approved purchase of local Pinions at $180.00 per
tree, awaiting proposal due 9/30/13
9/30/13 — Received proposal, reviewing with vendor
10/2/13 — Forward Proposal to JE & RK
10/3/13 — Working with Vendor to schedule start date
11
10/15/13 - JE & MT informed the Approved Contract withdrawn
by Vendor, unable to provide enought Pinions
10/16/13 — Mother local vendor will be on site to review project
10/17/13 — Forwarded to JE, MT & RK estimate from Jaquez
Pinion Tree Service. $200.00 each plus tax.
ZDC will dig holes & assist with planting
Approval JE
10/17/13 — JE Approved purchase of trees
Page 6
EFTA00608669
Zorro Development Corp - Project Report 11/22/13
10/21/13 — Tree location was marked out, forwarded to JE & MT
Have relocated the Fire Truck Acess further to the left
10/22/13 —1" shipment of trees on site, planting of MH started
Wildflowers will be seeded Spring 2014
10/25/13 — Planting of trees complete at MH & LV
Irrigation at the MH will be completed in the Spring
11/1/13 — Loads of dirt from other locations on ZDC being
relocated around newly planted Pinions at MH & Lodge
11/8/13 — Work continues — attached photos
11/21/13 — Dirtwork around newly planted Pinions & front
enterance complete — attached photos
11/22/13 — Project to be reviewed when JE on site
Page 7
EFTA00608670
Zorro Development Corp - Project Report 11/22/13
24 - MEDIA ROOM
START
END
EST.COST
NOTES
PHOTO
STATUS
CURTAINS
Blackout & Rings
$6,262.08
4/27/13 - JE Selected Fabric for Project
Awaiting
5/10/13 — Project Request Form forwarded to JE & RK
Direction
5/17/13 — Resubmitted Project Request Form to JE
5/31/13 — As of date Awaiting Direction
25 — OFFICE
START
END
EST.COST
NOTES
PHOTO
STATUS
CURTAINS
Lined & Rings
$2,527.01 4/27/13 — JE Selected Fabric for Project
Awaiting
5/2/13 — Vendors & Manufacturer enable to provide enough
Direction
yardage of selected fabric
5/9/13 - Another fabric option forwarded to JE
5/10/13 — Project Request Form forwarded to JE & RK
5117113 - Resubmitted Project Request Form to JE
5/31/13 - As of date Awaiting Direction
Page 8
EFTA00608671
Zorro Development Corp - Project Report 11/22/13
29 - REPAIR
START
END
eST.COST
NOTES
PHOTO
STATUS
pOOLJSPA
5/9/13 — Vendor on site
Project
5/16/13 — Bid breakdown forwarded to RK
Due to
6/10/13 —JE requested that work be started in Sept 2013
Start
8/20/13 — JE requested that 3 B's submit a bid for Project
12/02/13
9/3/13 — 3 B's on site to review Project
9/24/13 — 3 B's declined moving forward with Project
Aooroval JE
9/24/13 — JE approved moving forward with replastering of Pool
& Cleaning Spa tile
9/27/13 — Forwarded Proposal to RK from Lee Sum Pools
Awaiting Direction
10/4/13 — RK contacting Lee Sure Pools on their proposal
10/9/13 — RK requested another vendor proposal
10/11/13 —As of date still trying to locate another vendor who can
complete this work, will continue to investigate options
10/19/13 — Blue Water Proposal forwarded to MT
10/21/13 — Forwarded Plaster Sample to JE
ADDroval JE
10/22/13 — JE approved sample
10/23/13 — Project on Hold until after winter visit
10/29/13 — Have 2 companies due on site 11/1/13 for bids
ADDroval JE
$15,057.58 10/30/13 —JE Approved moving ahead with Leisure Pools
Resubmitted original bid from Lee Sure Pools to MT
11/1/13 — Natures Creations forwarded bid $38,758.19
11/6/13 — Funds Wired to Lee Sure Pools via E Mail from MT
11/7/13 - E Mailed to MT & RK bids from Natures Creations
Awaiting
& Poolside Services for Pool Controls/ Specs on Chemicial
Direction
Injection Systems & comparislon pricing from Pool Plaza
for Pentair Controls — Awaiting Direction
11/15/13 - Leisure Pools to start plastering work in the New Year
Page 9
EFTA00608672
Zorro Development Corp - Project Report 11/22/13
11/21/13 — Forwarded to MT Poolside Services estimate
with material & labor breakdown
Awaiting
Direction
Page 10
EFTA00608673
Zorro Development Corp - Project Report 11/22/13
30- FRONT GATE
START
END
EST.COST
NOTES
PHOTO
STATUS
OPENER$
Call Boxes/Loops
07/25/13
$10,833.00
4/20/13 — Bid received, requested vendor to make adjustments
5/9/13 — Received Revised bid. Options & Equipment reviewed
5/12/13 — Options & Equipment selected
5/21/13 — Final bid faxed, unreadable, vendor will resend
6/8/13 — Final bid from RMC Electric - $11,941.00
6/11/13 — RK requested material breakdown
8/14/13 — Material breakdown forwarded to RK
6/19/13 — RMC Electric resubmitted revised pricing to RK
6/28/13 — RK requested that 3 B's submit an estimate. Have
contacted 3 B's, they will be on site next week to review
6/29/13 — Forwarded E Mail to 3B's outlining scope of work to be
included within the bid
7/9/13 — RK neogiated 3 B's bid
Aooroval RK
7/11/13 — 3 B's Bid Approved.
7/12/13 — Forwarded Deposit Request $6,750.00 to BK & RK
•
7/12/13 - 3B's received Deposit
7/25/13 — Project Started
7/27/13 — Gate 1 Controllers & Key Pad installed. New Key Pad
for Gate 2 faulty, vendor has reordered — attached photos
8/10/13 — Waiting for installation of loops & Gate 2 Key Pad
8/19/13 — Vendor to meet JE
8/21/13 — Gate 2 Key Pad installed, gate phone lines down,
hence no remote control to operate gates
8/3W13 — Contacted RMC regarding phones & gate controllers
will be on site next week
9/2/13 — As of date Gate Loops Not Installed
9/3/13 — 3 B's on site to review Project
9/16/13 — The bid that 3 B's neogiated with RK did not include the
purchase or installation of gate loops, which was on the orginal
bid submitted by RMC Electric & E Mail submitted to 3 B's by BG
Change Order
$481.50
9/17/13 — Change Order submitted for Gate Loops from 3 B's
9/18/13 — Submitted Change Order to JE & RK
Page 11
EFTA00608674
Zorro Development Corp- Project Report 11/22/13
Approval JE
9/18/13 — JE Approved Change Order
9/21/13 — Awaiting delivery of Gate Loops to Vendor
9/25/13 — E Mailed 3 B's & RK - #2 Gate Controller shorting out
phone lines to gate. Amtel on site to troubleshoot
1012/13 — Gate Loops on Back Order, awaiting delivery to Vendor
10/15/13 — Gate Loops due to be installed
10/16/13 — Forwarded to 3 B's & MT E Mail & photo of installed
% hp gate opener, when 1 hp openers were requested 6/29/13
Approval JE
10/30/13 - JE Approved moving ahead with Project
11/13/13 - Awaking Vendor to Complete Project - install Gate
Loops, Gate Openers
Estimate & Options to get gates up and running forwarded
Awaiting
to MT. Awaiting Direction
Direction
32 - PHONES RANCH
START
END
EST.COST
NOTES
PHOTO
STATUS
CENTRAL
6/21/13 — Will forward proposal for Phone System by 6/28/13
Project
6/27/13 - Project On Hold until Microwave Solution resolved
On Hold
Page 12
EFTA00608675
Zorro Development Corp - Project Report 11/22/13
arEQQLEAK
START
ff,m2
EST.COST
NOTES
PHOTO
sTATIS
Engineering Inspection
4/29/13 — Quote forwarded to RK, who requested more detail
$9,100.00
5/8/13 — Revised quote forwarded to RK, awaiting direction
Unit Cost
5/22/13 — Beaudin Ganze on site to review Project
$43,170.00
5/29/13 — Beaudin Ganze report forwarded to JE & RK
Approval JE
5/29/13 — JE Approved invesigation via camera
6/3/13 — JBH forwarded estimate
Approval JE
6/4/13 — JE Approved moving ahead
Camera Duct Inspection
6/11/13 —JBH due on site
$1,214.91
6/12/13 — JBH on site, complete camera inspection, awaiting
Report/Disc
6/21/13 — Report/Disc forwarded to Beaudin Ganze
7/8/13 — Report/Disc due on site
7/9/13 — Informed that Report has been delayed
RK forwarded Report to JE
7/20/13 — Beaudin Ganze on site to review Project with JE
JE did not approve any design solutions by Beaudin Ganze
8/22/13 — Contacted Dessert Air & fonvrded info regarding
existing space & equipment design
9/18/13 - Site visit expected by Dessert Air to confirm their
proposed solution
9/19/13 — Dessert Air have rescheduled for 9/27/13
Approval JE
9/24/13 — JE approved investigating purchase of new Poolpak
9/25/13 — Dessert Air pending visit— placed on hold
9/30/13 — Trane Poolpak Rep on site
10/1/13 — Trane forwarded all info to Poolpak
10/3/13 — Forwarded Mech Drawings of area to Trane
10/8/13 — Trane due to be on site to confirm air flow details
10/8/13 —Trane on site
10/11/13 —Irene on site to confirm auxiliary heating operation
Page 13
EFTA00608676
Zorro Development Corp - Project Report 11/22/13
10/11/13 — Trane Proposal forwarded to RB & MT. Suggested
system is different from exisiting — automated outside air
Dampers & circulating pump on loop water
Awaiting estimate from Trane for cleaning and or replacement of
ex heating coil. Due 10/15/13
10/28/13 — Revised Contact from Trane forwarded by RK
10/23/13 — Project on Hold until after winter visit
Approval JE
10/29/13 — JE Approved purchase of Poolpak
50% Deposit forwarded to Trane $24,127.00
11/8/13 — Energy Control Proposal - interfacing I/Net
to Pool Pac forwarded to MT & RK — Awaiting Direction
11/13/13 — RK requested a breakdown of Parts & Material
Awaiting Energy Control breakdown
11/15/13 — Forwarded Energy Controls breakdown to RK &
MT. Awaiting Direction
12/16/13 — Trane expects unit to be on site
Awaiting
Direction
Page 14
EFTA00608677
Zorro Development Corp - Project Report 11/22/13
34 - REPAIR & PAINT
WORK - ION
START
END
EST.COST '
NOTES
PHOTO
STATUS
5/7/13 — E Mailed Photos to JE showing work required
5/23/13 — Forwarded all work details to Ion, including work that
will be required after MBR Terrace is completed
6/29/13 — Additional work — Sign on Adobe, Sarah's Office Wall
-6130/13 —As of date Awaiting Direction
10/28/13 — As requested forwarded photos & details of scope
of work to SH
10129/13 — Awaiting Direction
Awaiting
Direction
37 — WELL K
START
Plugging 1s`Hole
$15,000.00 Estimate to Plug 1 st Hole
40 — LANDSCAPING
START
END
EST.COST
NOTES
PHOTO
STATUS
LODGE
10/08/13
10/8/13 — Removal of dead trees, prunning trees started
10/11/13 — All dead trees have been removed from back of
Lodge. All trees surrounding the Lodge have been pruned
- attached photos
Work will continue after guests leave 10/21/13
11/1/13 — Work has continued on Project 42 LV Refurbishment,
once complete will retum to Project 40
Aooroval
11/13/13 — Approval via E Mail from MT for 2 workers for 4 days
© $15.00 per hours to rake out soil
11/15/13 — Loads of dirt from other locations on ZDC have been
relocated to the area. Work continues — attached photos
11/20/13 — Relocation & raking out of dirt & complete
Project to be reviewed when JE on site
Page 15
EFTA00608678
Zorro Development Corp - Project Report 11/22/13
41-
START
END
EST.COST
NOTES
PHOTO
STATUS
REFURBISHMENT
HOME THEATER
8/13/13 — JE requested replacement of exisiting Sony Projector
8/15/13 — 3 Vendors on site — Proposals due next week
8/22/13 - JE forwarded 2 Proposals
8/25/13 — Received 3i" Proposal
JE requested Purchase of Projector to be placed On Hold as
new projector to be released Dec 2013
Aooroval JE
$83.06
9/17/13 — JE approved purchase of HDMI Cable
$320.00 + tax 9/17/13 — JE approved 3 B's installation of HDMI Cable
9/18/13 — HDMI Cable ordered
9/28/13 — HDMI Cable on site
9/30/13 — HDMI Cable installation begins
9/2/13— HDMI Cable installed
10/3/13 — New Model of Sony Projector will start to be shipped
end of Oct Forwarded E Mail to JE & RK with details, awaiting
direction
10/10/13 — Vendors to provide revised bids with new projector
and screen.
10/11/13 — Awaiting revised bids
10/22/13 —Via JE Sony to Complete Project
11/4/13 — MT confirmed that Sony will supply everything required
a tech is expected on site within the next 2 weeks
1118/13 — Awaiting Sony Tech Site Visit
11/21/13 — Have been calling Sony Rep every day, with no
response
11/22/13 — E Mail received from Sony, "In-Home Consultation
set for 9am 11/25/13
Page 16
EFTA00608679
Zorro Development Corp- Project Report 11/22/13
43 - REFURBISHMENT START
END
gST.00ST
NOTES
PHOTO
STATUS
LANDSCAPING - LV
8/22/13 — JE Approved Project
Cover Rock with soil, Pinion installation
8/22/13 — Forwarded JE suggested colourful plant material
Awaiting
Direction
for discussed areas - awaiting direction
9/16/13 - Router Tilling Complete. Ready for Top Soil
9/18/13 — Forwarded JE & RK breakdown of installation/purchase
etc of sod. Total $5,512.50
9/18/13 — JE asked how much sod. 5,350 sq ft
9/27/13 — Reviewing sod estimates
10/2J13 — Resubmitted revised installation/purchase etc of
sod to RK. Total $5,356.25
10/24/13 — Due to weather, now unable to lay sod
10/25/13 — Pinions planted — attached photos
11/1/13 — Loads of dirt from other locations on ZDC being
relocated around Pinions
11/8/13 — Work continues — attached photos
Avoroval
11/13/13 — Approval via E Mail from MT for 2 workers for 4 days
6$15.00 per hours to rake out soil
11/15/13 — Work continues — attached photos
11/20/13 — Relocation & spreading of dirt complete
Project to be reviewed when JE on site
Page 17
EFTA00608680
Zorro Development Corp - Project Report 11/22/13
(PURCHASES
EPAIRS
as -
START
END
EST.COST
NOTES
PHOTO
STATUS
REFURBISHMENT
DAKOTA WELL
10/17/13 — Forwarded CC Request for New Membranes for
Dakota Well, with Back Up showing 2012 unit price & labor rate
to BK, RK &MT
Approval RK
10/25/13 — CC Request approved by RK via BK
10/29/13 — Forwarded Completed Project Request &
Awaiting
Approval Form to RK, MT & DI — awaiting direction
Direction
11/15/13 — Membranes have not been ordered as of date, until
direction is received on Project Request & Approval Form
submitted 10/29/13
46- HEATING STAFF
START
ENO
EST.COST
NOTES
PHOTO
STATUS
COTTAGE
11/18/13
11/20/13
$1,189.00
10/19/13 — Forwarded Completed Project Request & Approval
Complete
Form to Bic RK & MT — awaiting direction
Approved RK
10/29/13 — Project Approved RK
11/7/13 — Trane on site, heat strips no longer made, reviewing
other options
11/13/13 — Mother solution has been found at the expense as
I
heat strips
11/20/13 — Project Complete
Page 18
EFTA00608681
Zorro Development Corp - Project Report 11/22/13
48-MAIN
START
END
EST.COST
NOTES
PHOTO
STATUS
DISTRUBUTION
POPS RC
11/12/13
$1,551.00
11/5/13 — Forwarded Completed Project Request & Approval
Form with photos to MT & RK — Awaiting Direction
Approved
11/13/13 - Project Approved via E Mail from MT
11/15/13 —JCH on site
There is an issue with the existing pump, before pulling the pump
JCH are recommending replacing the capacitors, they also need
additional fitting to install refurbished pump, hence back on site
next week
11/22/13 — Project 50% complete. Capacitors need replacing on
original Pump & new nipples for 2nd Pump. Due to be completed
by 11/27/13
49 —1961 FIRE
START
UP
EST.COST
NOTES
PHOTO
STATUS
TRUCK
11/05/13
$250.00
10/25/13 - Fire Truck hauled to West Truck Service for review
10/27/13 —West Truck Services would inspect & forward a
breakdown for repairs/service etc for $640.00
&woad
11/05/13 — Approval to move ahead with inspection via E Mail MT
11/6/13 - West Truck Services contacted ZDC, requesting that
..
the Fire Truck be removed from their property. Vendor not happy
with communcations with NYC
$500.00
Fire Truck hauled from West Truck Services to ZDC, then onto
Hal Bums Truck & Equipment, who will Inspect & forward
repair/service details as soon as possible
11/22/13 — Hal Bums still trying to locate a water pump
Page 19
EFTA00608682
Zorro Development Corp - Project Report 11/22/13
60 - HVAC - Mil
7 START
END
EST.COST
NOTES
PHOTO
STATUS
11/19/13
11/22/13
11/16/13 - Forwarded Completed Project Request &
Complete
Approval Form to RK MT & BK — Awaiting Direction
11/19/13 — Vendor due on site
11/20/13 — Heat Pump 7A, Heating Coil Actuators repaired, need
to replace HP5 (Gym) Compressor
11/22/13 — Project Complete
RB will submit a complete report on the HVAC system
51 — OUTSIDE
START
):ND
EST.COST
NOTES
PHOTO
STATUS
FURNITURE — LODGE
8/22J13 — JE agreed new outside furniture required, will relocate
exiitng table & benches from Shooting Range to uncovered back
deck
9/1/13 — Will Investigate funiture options for covered back deck
On Hold
9/16/13 —After reviewing uncovered deck, we believe that the
until
deck will not handle the weight of the table & benches from the
Spring 2014
Shooting Ranch. especially if we receive snow
9/22113 — Will investiage all options over the next week
9/27/13 — Will forward suggestions 10/4/13
10/4/13 — Unable to find anything locally, so late in the season.
Will relocate funiture from other areas to cover up coming guest
visit. Will place this project On Hold until Spring 2014
WELLS
10/31/13 — Extension of Time filed. Awaiting approval from
DAKOTA & K
Page 20
EFTA00608683
Outlook Print Meqqage
Cancellation Notification: 505071708109
Mon 11/18/13 1 1:35 AM
RESERVATION CANCELLATION NUMBER: 505071708109
SUMMARY OF CANCELLED BOOKING
Page 1 of 2
Room booked for 1 night(s), Friday, December 6, 2013 - Saturday,
December 7, 2013
Primary Guest Information
Credit Card Information
ROOM DETAILS
Room Guest Information
Friday, December 6, 2013 -
Saturday, December 7, 2013
3 Adult 0 Children
CANCELLATION POLICY:
Room Information
King Suite
King Bedroom, Living Room SOfabed, Fireplace, Wet
Bar, Mini-Fridge, CableTV In both rooms.
https://b1u175.maiLlive.com/mail/PrintMessages.aspx?epids-26444510-5080-11e3-a905-... 11/22/2013
EFTA00608684
Outlook Print Message
Page 2 of 2
Cancel by 10:00 7 days before arrival to avoid penalty of 1 night.
MIL
Follow us
f
11/22/2013
EFTA00608685
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA00608664.pdf |
| File Size | 4607.3 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 25,076 characters |
| Indexed | 2026-02-11T23:03:09.326022 |