EFTA00609128.pdf
Extracted Text (OCR)
Emad Hanna
From:
Monique Harry
Sent:
Thursday, July 01, 2010 2:53 PM
To:
Emad Hanna
Subject:
Uriel Caleb
Attachments:
Uhel R Caleb 6-29-10.pdf
Emad,
Attached for payment via Check Hi- Tech Concrete Pumping in the amount of $2,825.00. Project 1010
Code 03-362. Please make check payable to Uriel Caleb.
Monique
Your E-mail and More On-the-Go. Get Windows Live Hotmail Free. Sion uo now.
1
EFTA00609128
Mr
Hi— Tech Concrete Pumping. LLC
bate:
[Cell:
Job Name and Location:
ime--xe
Mix Type
I
1 Cb.antity
Fee (5)
- -
or
DispatS
-t
, Setup Charge (1-15a_
----
/
.
.--)
Arms." -• j
3000psie$16.00
iCubic Yards Poured
I
-----.2e,
C.-,
troy
-.9.----1-r-1
Start
9561sie516.00
i Extra Pipe(s) / Hose(s)
/
S
1-155. 'est"'
c
c.
I_H
50000psie&18.00
i Transportation
,
Frets r
•
"" Grout e$14.00
iOvertime Surcharge
.
.
Miselloncous
!Total Yards ,.... 7 r Tiirotal Charges
el g e2 r
•
..."`
Miscellaneous
' /CYO,
C 3. 34 4
Wilt-
/
11/f/ 4
Additional Job Notes:
Contractor to orovick
I
Grout to prime the pump and delivery system
2. Pump able concrete mix.
3. Labor for setup and cleanup of delivery system.
Suitable access onto and off of the jobsite (provide wrecker, bulldozer etc. if situation dictates)
5. Responsibility for any loss of delivery systems (pipes, clamps. gaskets, elbows, hoses etc.).
6. Labor to man hose.
7. Safe working conditions (operator reserves the right to cease operations should equipment or conditions prove unsafe).
Terms of Payment
Net Invoice is due on delivery date. Customer agrees to pay reasonable collection fees in addition to a delinquent fee of 1 5%
per month if collection proceedings are initiated
'Note: Customers will be allowed ten (10) - Fifteen (15) minutes per truck (8-10 cubic yards) free unloading tune after
arrival of concrete truck to pump. Any delay caused by customer over this time will be charged at a rate of $75.00 per
hoar. If driver is asked to drive off main road onto private property the customer accepts full responsibility for any arid all
damage to any property, including but not limited to sidewalks, fences, septic tanks, power lines, phone lines etc. We do every-
thing possible to provide our customers with trouble free equipment: however Hi-Tech Concrete Pumping. LLC. Will not be held
Liable for any loss time. Labor and/or materials due to any mechanical failure
The person, corporation or entity signing this contract has full and complete authority to act for and on behalf of the owner and
to legally bind the owner for the performance of this contact in its entirety
By signing 'his contract the owner, whether acting individually or through his/her/its duly authorized agent agrees to pay Hi•
Tech Concrete Pumping, LLC. at the rate specified for both the hourly rate and the per cubic yard rate but in no even less than
the minimum specified rate.
t
[ general Terms & Conditions
ea- enif
/-
„
I 6.
,
MINT
11111
I Herby certify that the above times and yardages are Hi. Tech Concrete Pumping LLC Has completed the job to the owner/contractors
satisfaction
for both the hourly rate and the per cubic yard rate but in no even less than
-•••
...5; 474.2
at the rate specific
EFTA00609129
Document Preview
Extracted Information
Document Details
| Filename | EFTA00609128.pdf |
| File Size | 307.9 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 3,265 characters |
| Indexed | 2026-02-11T23:03:16.404212 |
Related Documents
Documents connected by shared names, same document type, or nearby in the archive.