Please process for payment via check to Hi-Tech Concrete Pumping not Uriel Caleb.
Monique
> From:
> To:
> Subject: Re: Hi- Tech Concrete Pumping
> Date: Wed, 18 Aug 2010 15:04:37 -0400
>
> Approved. Gary
>
> Sent from my iPhone
>
> On Aug 18, 2010, at 11:56 AM, "Monique Harry"
>
> wrote:
>
>
Good Day Gary,
> >
>
Attached for your approval Hi-Tech Concrete Pumping Invoice #5 in
> the amount of $3,085.00. Project 1010 Code 03-362.
-
> >
>
Monique
> >
»
<Hi-Tech Concrete Pumping 5.pdf>
EFTA00609130
nil
Hi— Tech Concrete Pumping, LLC
bate:
Job Name and Location: 47,0:,
Fee (5)
Time
Mix Type
Dispatch 5:*„.1
Arrival/ ;0, 3000psi@516.00
Setup Charge (1.15)
Cubic Yards Poured
Starty 7)
4000psie$16.00
1-15 2 -"- „et --50000psie$18.00
Grout @$14.00
Miscellaneous
Additional Job Notes:
Quantity
Extra Pipe(s) / Hose(s)
Transportation
Overtime Surcharge
Miscellaneous
Total Yards ,.....„"es... e2
Contractor to provide
1.
Grout to prime the pump and delivery system
2. Pump able concrete mix.
3. Labor for setup and cleanup of delivery system.
4. Suitable access onto and off of the jobsite (provide wrecker, bulldozer etc. if situation dictates).
5. Responsibility for any loss of delivery systems (pipes, clamps, gaskets. elbows, hoses etc.).
6. Labor to man hose.
7. Safe working conditions (operator reserves the right to cease operations should equipment or conditions prove unsafe).
Terms of Payment
Net Invoice is due on delivery date. Customer agrees to pay reasonable collection fees in addition to a delinquent fee of I.57,
per month if collection proceedings are initiated.
'Note: Customers will be allowed ten (10) - Fifteen (l5) minutes per truck (8-10 cubic yards) free unloading time after
arrival of concrete truck to pump. Any delay caused by customer over this time will be charged at a rote of $75.0O per
hour If dnver is asked to drive off main road onto private property the customer accepts full responsibility for any and all
damage to any property, including but not limited to sidewalks, fences, septic tanks, power lines. phone lines etc. We do every-
thing possible to provide our customers with trouble free equipment: however Hi-Tech Concrete Pumping. LLC. Will not be held
Liable for any loss time. Labor and/or materials due to any mechanical failure.
The person corporation or entity signing this contract has full and complete authority to act for and on behalf of the owner and
to legally bind the owner for the performance of this contact in its entirety.
By signing this contract the owner, whether acting individually or through his/her/its duly authorized agent agrees to pay Hi-
Tech Concrete Pumping, LLC. at the rate specified for both the hourly rate and the per cubic yard rate but in no even less than
the minimum specified rote.
cpsr,/
t_g
Total Charges
7 c5
General Terms 6 Conditions
'en
e/Z)
/1#6e-
TITIA
0..01/4'i:ft& 1.:6•4, 4.* i
I Herby certify that the above t,mes and yordogrs arc Hi- Tech Concrete Punpng ILL was completed the job to the owner/contractors
satisfaction
EFTA00609131
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA00609130.pdf |
| File Size | 311.0 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 3,308 characters |
| Indexed | 2026-02-11T23:03:16.434979 |