Back to Results

EFTA00609130.pdf

Source: DOJ_DS9  •  Size: 311.0 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

Emad Hanna From: Monique Harry Sent: Wednesday, August 18, 2010 3:24 PM To: Emad Hanna Subject: FW: Hi- Tech Concrete Pumping Attachments: Hi-Tech Concrete Pumping 5.pclf Emad, Please process for payment via check to Hi-Tech Concrete Pumping not Uriel Caleb. Monique > From: > To: > Subject: Re: Hi- Tech Concrete Pumping > Date: Wed, 18 Aug 2010 15:04:37 -0400 > > Approved. Gary > > Sent from my iPhone > > On Aug 18, 2010, at 11:56 AM, "Monique Harry" > > wrote: > > Good Day Gary, > > > Attached for your approval Hi-Tech Concrete Pumping Invoice #5 in > the amount of $3,085.00. Project 1010 Code 03-362. - > > > Monique > > » <Hi-Tech Concrete Pumping 5.pdf> EFTA00609130 nil Hi— Tech Concrete Pumping, LLC bate: Job Name and Location: 47,0:, Fee (5) Time Mix Type Dispatch 5:*„.1 Arrival/ ;0, 3000psi@516.00 Setup Charge (1.15) Cubic Yards Poured Starty 7) 4000psie$16.00 1-15 2 -"- „et --50000psie$18.00 Grout @$14.00 Miscellaneous Additional Job Notes: Quantity Extra Pipe(s) / Hose(s) Transportation Overtime Surcharge Miscellaneous Total Yards ,.....„"es... e2 Contractor to provide 1. Grout to prime the pump and delivery system 2. Pump able concrete mix. 3. Labor for setup and cleanup of delivery system. 4. Suitable access onto and off of the jobsite (provide wrecker, bulldozer etc. if situation dictates). 5. Responsibility for any loss of delivery systems (pipes, clamps, gaskets. elbows, hoses etc.). 6. Labor to man hose. 7. Safe working conditions (operator reserves the right to cease operations should equipment or conditions prove unsafe). Terms of Payment Net Invoice is due on delivery date. Customer agrees to pay reasonable collection fees in addition to a delinquent fee of I.57, per month if collection proceedings are initiated. 'Note: Customers will be allowed ten (10) - Fifteen (l5) minutes per truck (8-10 cubic yards) free unloading time after arrival of concrete truck to pump. Any delay caused by customer over this time will be charged at a rote of $75.0O per hour If dnver is asked to drive off main road onto private property the customer accepts full responsibility for any and all damage to any property, including but not limited to sidewalks, fences, septic tanks, power lines. phone lines etc. We do every- thing possible to provide our customers with trouble free equipment: however Hi-Tech Concrete Pumping. LLC. Will not be held Liable for any loss time. Labor and/or materials due to any mechanical failure. The person corporation or entity signing this contract has full and complete authority to act for and on behalf of the owner and to legally bind the owner for the performance of this contact in its entirety. By signing this contract the owner, whether acting individually or through his/her/its duly authorized agent agrees to pay Hi- Tech Concrete Pumping, LLC. at the rate specified for both the hourly rate and the per cubic yard rate but in no even less than the minimum specified rote. cpsr,/ t_g Total Charges 7 c5 General Terms 6 Conditions 'en e/Z) /1#6e- TITIA 0..01/4'i:ft& 1.:6•4, 4.* i I Herby certify that the above t,mes and yordogrs arc Hi- Tech Concrete Punpng ILL was completed the job to the owner/contractors satisfaction EFTA00609131

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA00609130.pdf
File Size 311.0 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 3,308 characters
Indexed 2026-02-11T23:03:16.434979
Ask the Files