Back to Results

EFTA00609205.pdf

Source: DOJ_DS9  •  Size: 615.8 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

LSJ CONSTRUCTION Subcontractor Payout Project: Mechanical Desal Trade: Water System Subcontractor TSG Technologies, Inc Invoice # Phase # Requisition #05 11-200 Original Contract Sum: Change Orders Submitted & Approved: New Change Orders: Total Work Contracted to Date: Total Work Completed to Date: Less Retainage: Total Payments Made to Date: Total Current Payment Due: Balance to Finish including Retainage: Sales Tax Liability: February 3, 2011 Requisition #05 Insurance ex iration: March I, 2011 $592,160.00 $6,905.00 $0.00 $599,065.00 95% $569,457.00 a. Subcontractor/Supplier is liable, explail install only / tax included in contract b. Non-resident Subcontractor/Supplier Bond Applicable: c. Use Tax to be paid by our company: d. Shipping Total Outlays for this contract incl. Sales or Use Tax: JEE approval attached YES NO X Submitted Bill Signed:// ,4 Date: February 3, 2011 Approved by: Emad Signed: Date: )191 (( $0.00 / $533,944.00 ‘,/ $35,513.00 OF $29,608.00 None $569,457.00 Invoice Attached YES NO X tt Approved by: Gary Signed: Date: February 3, 2011 Approved by: Signed: Date: Is I ' EFTA00609205 LSJ CONSTRUCTION Project Mechanical Desal krOcontractor • rue legal name TSG Trecnnotogien Phases 11.200 Trade Water System 'mace I Requisition 405 Insurance ealaration I 444, 11 Payment Para] Final X Invoice/Re:14 Dale C/O Amount Retainage Due Paid Date Paid Check?, Balance I Contract Amount 12/22/69 592.10000 COat C002 C003 C004 C045 10.11/10 Watch Guard SYSIere 1.000 00 10:1 3/to Storage / Insurance 1000 00 01118el 1 Lost time 4.905.00 Requisition et 0202/10 Doman RSOCO - 8% 47.80000 000 47 900.00 47,800 00471. 000 Requisition #2 033/30//0 Procurement - 42% 248.280 00 000 248,280.00 248.280 60a/ ..,. 000 Reguitition /3 08/05/10 Ready to Ship. 30% 177.648 00 000 177,048Q9_ 177.648 Untie'?" 0.00 Remmition 44 12/20110 Equip. on Site - 10% 60.216.00 0.00 60.216.00 60.216 00 000 Requisition e5 02103/11 Subsumes' COmpluton - 594_ 79.608 00 000 29,608.00 29,608 00 02/03/11 CO's #2. 43 5.905.00 0.00 5,905.00 5.90500 Rkque.$000 *6 Final Completion • 5% 70101 569,457 00 000 569.457.00 533.944.00 35.51300 I Dale Revised Fkon.ingy 3. 2011 Contract Amount Phase Convect con con C013 CON CO'S RO Plant 592,160 00 Watch Guard 1.00000 Descnotion Storage / Insurance 1,000 00 Da stnption Lost time 4.90500 Description Description Descnotion Cootraccoo To Date Balance of Contract Ye/Retainer 599.065 00 29.608 00 EFTA00609206 TSG TECHNOLOGIES. INC. k a lbA TES e wag nu• MO two Name Use I James. LL Cab Financial Trust Company. kV Address 6100 Red Hook Quarter 8.3 City SI Thomas State USVI Zip 00802 Phone (340)7798054 Ann Gary Kerney 40-204-02-PRP05 Little St. James amnia Number 40-204-02-PRM0S Dale 2/3/2011 Order No. TSG Contact Bob Petersen Michael Malo Phone (340) 776-7766 Fax (3401774-9489 Una Price Extended Price -'r 1 i 1 Pay Request IS Change Order 42 Change Cutler //3 529 608 00 51.000 00 S4.905 00 Payment Schedule: a Task Percentage Payment I Design Phase- NIP -1 8% 547.800.00 2 Begin Procurement - NIP 2 42% $248.280 00 3 Ready to Ship 30% 5177.648.00 Change Order at $1.000.00 4 Equipment on Site 10% $59.21600 Change Order 42 $1.00000 Change Order 43 54.905 00 5 Substantial Completion 5% 529.608 00 6 Final Compilation 5% 529.608 00 Total 100% $599 065 00 Total per Contract: $599,065.00 Loss Previously Invoiced: $533,944.00 Total this Invoice: $39513.00 Remaining Contract Value: $29,608.00 1/(ve,/,„ A .'(7 Were information: TSG Technologies. Inc. Darby Bank and Trust Subtotal Shipping and Handling Taxes Total invoice amount $35.513.00 Sono $35,513.00 EFTA00609207 TSG 'moor MAKIDG (VERY DROP CUNT TO Gary Kerney LSJ LLC FROM: TSG Technologies DATE: October 13. 2010 CONTRACTOR CHANGE ORDER REQUEST PROJECT NAME: Little St. James RO PROJECT NUMBER: 40-204-02 ORIGINAL CONTRACT SUM $ 592.160.00 (Contract Dated - February 11, 2010) PREVIOUSLY APPROVED CHANGE ORDERS $ 1 000 00 (Total Number of Approved Change Orders- 1) REQUESTED CHANGE ORDER NO. 2 $ 1 000 00 TOTAL 594 160 00 Description of Request (Include time, schedule, authorizing associate) Item 1: Sloragehnsurance for RO equipment through December 2010 $1.000 TSG TECHNOLOGIES Att-L-AL: Page I dl LLC EFTA00609208 'TSG S PARKING (VERY DROP COOT TO: Gary Kerney L S.J LLC c/o Financial Trust Company. Inc FROM: TSG le_c_hnolockes DATE January 18. 2011 CONTRACTOR CHANGE ORDER REQUEST PROJECT NAME. Little St James RO PROJECT NUMBER: 40-204.02 ORIGINAL CONTRACT SUM $ 592.160.00 (Contract Dated - February 11. 2010) PREVIOUSLY APPROVED CHANGE ORDERS $ 2.000 00 (Total Number of Approved Change Orders- 2) REQUESTED CHANGE ORDER NO. 3 $ 4 905 00 TOTAL .$ 599.065 00 Description of Request (include time, schedule, authorizing associate) Item 1: Time lost due to power not being available to TSG stall as of 1/19/11. Newest information conveyed to TSG has power available al end of day 1/21/11. for a loss of 3 days. Installers: 2 people x 9 hrs/day x $50/hr x 3 days 52.700 Project Manager: 1 person x 9 hrs/day x $65/hr x 3 days $1.755 Per Diem: 3 people x $50/day x 3 days $450 If work cannot be completed by 1/28/11. TSG's original finish date. Then extra charges will be incurred for housing and change ticket fees. TSG TECHNOLOGIES Page I ol I LS.J., LLC EFTA00609209 Emad Hanna From: Monique Harry Sent: Friday, Februaris i tr 1 1.12 P M. To: Emad Hanna Subject: TSG Attachments: TSG Req 5.pdf Emad, Attached for payment TSG Technologies, Inc Req 5 in the amount of $35,513.00. Project 1010 Code 11-200. Monique 1 EFTA00609210

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA00609205.pdf
File Size 615.8 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 5,893 characters
Indexed 2026-02-11T23:03:18.224075
Ask the Files