LSJ CONSTRUCTION
Subcontractor Payout
Project:
Mechanical Desal
Trade:
Water System
Subcontractor TSG Technologies, Inc
nvoice #
Phase #
Requisition #04
11-200
December 28, 2010
Requisition #04
Insurance ex tration: March 1.2011
Partial
X
Final
Original Contract Sum:
$592.160.00
Change Orders Submitted & Approved:
$1,000.00
New Change Orders:
$0.00
Total Work Contracted to Date:
$593,160.00
Total Work Completed to Date:
90%
$533.944.00 ./
Less Retainage:
$0.00
Total Payments Made to Date:
$473,728.007
Total Current Payment Due:
$60,216.00
Balance to Finish including Retainage:
$59,216.00
Sales Tax Liability:
a. Subcontractor/Supplier is liable, explait
install only / tax
included in contract
b. Non-resident Subcontractor/Supplier Bond Applicable:
c. Use Tax to be paid by our company:
d. Shipping
None
Total Outlays for this contract incl. Sales or Use Tax:
JEE approval attached
YES
NO
X
Submitted Bill
Signed:
Date: De.rber_28, 2010
mad
Approved b
E
Sig
d:
r iga
D te:
1?-•\A‘V
$533.944.00
Invoice Attached
YES
NO
X
Approved by: Gary
Signed:
Date: December 28, 2010
Approved by:
Signed:
Date:
EFTA00609225
LSJ COP4STRUCT10N
Proyect Mechanical Desai
hitrzontraccor
knal name TSG Technologies Inc
Pilas 0 11.200
Trade' Watt, System
Mycke 9 Racuismon 904
Insurance nedrann 1-blar-11
Paymeni
Panial
Final
X
Date
GO
Amounl
%banna
Duo
Pald
Date Paid
Checka
Balance
j
I
twace/R401
Contract Amounl
12/22/09
592.160 00
CON1
CO*2
CO13
Coa4
CO•5
10/11/10 Mach Guard System
1.000 00
Requisiban at
02/22310 0eScIn PhaSe • 8%
47.800 00
00
47A00
47800 00 '17
000
Reoursiton 02
03/30:10 Procure-ment - 42%
248280.00
00
24860.00
248 280.00 d;
00
Remnsilion 03
0845:10ReadykSiw-30%
177.648 00
0 0i)
177,648.00
I 77,648.00J
0 00
Requestlion 44
i 2/20il 0 EQUIP. on Slle ' 10%
60.216 00
0.00
60216 CO
60.216.00
Regi/Mellan 05
Substanbal Completion • 5%
000
Ronisition 06
Final Campeban - 5%
0.00
Ijoiai
533.944 00
000
533.944.00
473,728.00
60.216 00 1
Dato Bevisad December 28 2010
Conrad Amounl Nasa
Contract
Co.?
COat
Col3
Con
COM5
RO Plant
592,160.00
watch Guard
1.000 00 DeSonption
Dosan/mon
Desonation
Desc opar.
Desonption
Connoted To Date
Balance of Conrad wffitelamage
593,160.00
59,21600
EFTA00609226
6,*TSG
e
SACK erg, Lel mei,
TSG TECHNOLOGIES, INC.
2401 NE 18th Terrace, Suite B
Gainesville, FL 32609
40-204-02-PROO4
Little St. James
Pay Request 64
Change Order #1
S59.21600
51.000 00
Payment Schedule:
a Task
Percentage
Payment
I potion Phase. NW .1
6%
547.800,00
2 Begin Procurement - NTP 2
42%
$248.280 00
3 Read, to Ship
30%
$122.646.00
Chango Order NI
$1.000.00
4 Equipment on SO
10%
559.216.00
5 Substantial Completion
5%
$29.608 00
6 F net CompletiOn
5%
$29.608 00
Total
100%
$593,160.00
Total per Contract.
$593.160.00
Less Previously Invoiced:
5473.728.00
Total this Invoice:
560.216.00
Remaining Contract Value:
$59.216.00
Subtotal
Shipping and Handling
Taxes
Total invoice amount
Wire Information:
TSG Technologies. Inc.
Darby Bank and Trust
Routing number
Account number
360.216.00
$0.00
560.216.00
EFTA00609227
0.4*„TSG
TO
Gary Keeley
L.SJ . LW
c/o Financial Trust Company Inc
6100 Red Honk Quarter 8-3
St Thomas. VI 00802
FROM:
TSG Technologies
2401 N E 1C Terrace Suite B
Gainesville FL 32609
DATE. October II. 2010
CONTRACTOR CHANGE ORDER REQUEST
PROJECT NAME Little SI. James PO
PROJECT NUMBER 40-204-02
ORIGINAL CONTRACT SUM_
5 592 169 00
(Contract Dated - February 11. 2010)
PREVIOUSLY APPROVED CHANGE ORDERS
....
(Total Number of Approved Change Orders•
REQUESTED CHANGE ORDER NO I
1 000 00
TOTAL
593 160 00
000
Description of Request (include lime, schedule. authorizing associate)
Item I : Installation ane setup of Watch Guard system for remote monitoring of :he LSJ RO equipment
EQUIPM(111!. installation. and SHIM)
'This equipment comes with a $300 per year license renewal fee
TSG TECHNOLOGIES
L.S J
Alt42,14LI
P.ep
EFTA00609228
LSJ
MONITORING SYSTEM NOTIFICATION LIST
Arran McGinnis
Brice Gordon
Smiley Titre
Notification via text is preferable
EFTA00609229
Emad Hanna
From:
Eve Febe
Sent:
Tuesday,December 28,20102:59 PM
To:
Emad Hanna
Cc:
Monique Harry
Subject:
TSG Technologies, Inc Req. #04
Attachments:
TSG Tech. Req. #04 1010.pdf
Good Afternoon Emad,
Attachment for payment TSG Technologies, Inc Req. #04. In the amount of $60,216.00. Project 1010 Code I I-
200.
Eve
1
EFTA00609230
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA00609225.pdf |
| File Size | 593.1 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 4,601 characters |
| Indexed | 2026-02-11T23:03:27.789202 |