EFTA00609244.pdf
PDF Source (No Download)
Extracted Text (OCR)
LSJ CONSTRUCTION
Subcontractor Payout
Project:
Main House
Trade:
Geotech
Subcontractor Jaca & Sierra
$6,800.00
Original Contract Sum:
Change Orders Submitted & Approved:
New Change Orders:
Total Work Contracted to Date:
Total Work Completed to Date:
Less Retainage:
Total Payments Made to Date:
Total Current Payment Due:
Balance to Finish including Retainage:
Sales Tax Liability:
Partial
January 6, 2010
Requisition #2
Final
X
$2,000.00
$0.00
$8,800.00
100%
$8,800.00
$0.00
$3,000.00
$5,800.00
$0.00
a. Subcontractor/Supplier is liable, explaii
install only / tax
included in contract
b. Non-resident Subcontractor/Supplier Bond Applicable:
c. Use Tax to be paid by our company:
d. Shipping
Total Outlays for this contract incl. Sales or Use Tax:
None
$8,800.00
JEE approval attached
YES
NO
X
Submitted Bill
Signed:
Date: January 6, 2010
Approved by: Emad
Signed:
Date:
\\-\\‘°
Invoice Attached
YES
NO
X
Approved by:
Signed:
Date: January 6, 2010
Approved by:
Signed:
Date:
45S
1011
0 1 -
-1
EFTA00609244
LSJ CONSTRUCTION
Project Main House
Jbcontractor • full legal name: Jaca & Sierra
Phase tf 01.807
Trade: Geotoch
Invoice
Requisition #2
Insurance expiation:
Payment
Partial
Final
X
Invoice/Re:Ill
Dale
C/0
Amount
Retainago
Duo
Paid
Date Paid Choddi
Balance
Contract
10107/09
6.80000
CON1
CO#2
CO#3
CO#4
12/29/09
2.00000
.00#5
Requisition #1
Requisition #2
Requisition #3
Requisition #4
10'27100
1000.00
3.000.00
3,000.00
0.00
5.80000
5.800.00
5.800.00
-
0.00
-
(Total
8.800.00
0.00
8.80000
3.000.00
5.800.00
Date Revised: January 6. 2010
Contract Amount - Phase
contract
COtil
COQ
CO#3
CO#4
CO#5
6.800 00
2.000.00
Geolechnical Exploration
Extra day of ailing to gel required borings
Description
Description
Description
Desorption
Contracted To Date
Balance of Contract w/Retainage
8.800.00
EFTA00609245
JACA & SIERRA TESTING LABORATORIES
OR9WalgE
LA
L.100 RED HOOK QUARTER
r. A_
THLIMP,-
Project :STRUCTURE LITTLE ST. JAMES, USVI
FOR SERVICES RENDERED AS FOLLOWS
FOR THE PERFORMANCE OF A GEOTECHNICAL
EXPLORATION FOR THE PROPOSED STRUCTURE LITTL
ST. JAMES, USVI.
12/29/2009
I 07f7c7P7
2
DAYS DRILLING CREW AND EQUIPMENT
1
LSUM
MOBILIZATION INCLUDING AIRFARE
AND SOIL SHIPPING
1
DAY
FIELD ENGINEERING
20
HRS
ENGINEERING TIME FOR
REPORT PREPARATION
Sub - Total
TOTAL TO BE PAID
DEPOSIT
-t; jot )
iSidu
I n€RET C
?tit PA,
EMAATANDaWMUMAIMAT
['UM()
CONDITIONS
Upol:
UNITPRICI
AMOUNT
2,000.00DAYS
1,500.00LSUM
$800.00DAY
4125.00HRS
$4,000.00
$1,500.00
$800.00
$2, 500.00
08,800.00
-83,600.00
c5: see. 0
EFTA00609246
JACA & SIERRA TESTING LABORATORIES
LAFAYETTE UUNTRAUTUH5, LLU
6100 RED HOOK QUARTER ST. A?
TWIMAH
:0'.0.
Pic: loci :STRUCTURE. LITTLE ST. JAMES, USVI
FOR SERVICES RENDERED AS FOLLOWS
FOR THE PERFORMANCE OF A GEOTECHNIGAL
EXPLORATION FOR THE PROPOSED STRUCTURE LITTL
ST. JAMES, USVI.
DAYS DRILLING CREW AND EQUIPMENT
1
LSUM MOBILIZATION INCLUDING AIRFARE
AND SOIL SHIPPING
1
DAY
FIELD ENGINEERING
20
HRS
ENGINEERING TIME FOR
REPORT PREPARATION
Sub - Total
TOTAL TO BE PAID
DEPOSIT
73ZICIV0CE
is JUST AND CORRECT AND THAT
ear,A. necceve
CUSTOMER
DEWO0@lo,
12/29/2009
0036202 J
CONUNriiNS
Upon Receipt
2,000.00DAYS
94,000.00
1,500.00LSUM
91,500.00
1 9800.00DAY
8800.00
8125.00HRS
52,500.00
r
98,800.00
-93,000.00
$5,800.00
EFTA00609247
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA00609244.pdf |
| File Size | 936.9 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 3,481 characters |
| Indexed | 2026-02-11T23:03:28.533259 |