LES FILE DRYWALL,
INC.
116 INDUSTRIAL NE ALBUQUERQUE, NEW MEXICO 871O7
(5O5) 345-8283 FAX (5O5) 345-7528
NM License # 006221
NM Dept. of Labor Registration # 0002220060701
Page 1 of 2
Bid:
ZORRO Ranch site wall stucco
Attn:
Estimating Department
Addendum :
0
Date:
Plan Date:
Contact:
04/12/10
Alan Chavez
Remove existing gypsum board a pilaster pop out detail and remove loose/pealing stucco finish
and place in appropiate dump trailor provided by ZORRO Ranch for disposal.
Install weep screed at bottom of wall to be re-stuccoed. install all plaster stops/casing beads at
pilasters to create new pop outs and at dissimilar materials.
Install new weather barrier and expanded metal lath and install a new 2coat cement stucco system.
apply a new fiberglass mesh over stucco system with a synthetic base coat, apply a new
'Acrylic based finish coat over base coat.
Apply a color wash over new finish coat to achieve a Faux finish
Install sealants at casing beads to dissimilar surfaces
Job Specific Inclusions:
Job Specific Exclusions:
Standard Exclusions:
Customer to pay NM gross receipts tax on price
69,600.00
Bid
NM Gross Receipts Tax- Santa Fe County
6.50% $
4,524.00
Add options:
Add for re-stucco at Mechanical House
43.000.00
tax $
2.795.00
Total Mechanical $
45,795.00
ADD FOR BOND NOT INCLUDED IN BASE BID
1.03% $
720.00
PROPOSAL VALID FOR 60 DAYS
MATERIAL QUOTES GOOD THROUGH 4TH QTR. 2010. MUST BE
NOTIFIED WITHIN 30 DAYS OF BID DATE TO SECURE MATERIAL QUOTES
EFTA00611600
LES FILE DRYWALL, INC.
1 16 INDUSTRIAL NE ALBUQUERQUE. NEW MEXICO 87107
(505) 345-8283
FAX (505) 345.7528
Page 2 of 2
Bid:
ZORRO Ranch site wall stucco
Date:
04/12/10
Ann:
Estimating Department
Plan Date:
1/0/1900
Addendum :
0
IBId Clarifications:
1. Les File Drywall reserves the right to negotiate all scheduling of work.
2. Any subcontract to be executed by Les File Drywall shall be subject to Les File Drywall's consent and approval and shall not
change in any manner the terms of this proposal which in any case shall take precedence over terms and conditions of such
contract. In the event. the parties fail to execute a contract and Les File Drywall commences work on the project, the terms of
this proposal and bid shall be binding on the other party.
3. All provisions in a subsequent contract which require Les File to obtain insurance in a type and /or amount in excess of what it
currently carries shall be considered an additional cost for which Les File shall be entitled to be paid additional monies prior to
providing same.
4. Retainage percentage not to exceed that held by owner on General for Les File portion of work.
5. All work to be done per plans and specs. Code compliance is the responsibility of the Architects and Engineers.
In the event our quotation Is accepted and within the contract we are to sign there is included a "hold harmless clause" subjecting us to liability other than
of our employees and agents. the additional amount of insurance premium required, to cover such clause, will be added to our contract price. Quote
based on use of locally available material or specified material. Upon acceptance
This proposal shall be made a pan of the subcontract and will take
precedence over any subcontract terms in the event of a discrepancy or a dispute. Estimate shall be in your office by
of each month and shall be
paid by the
. General shall notify Subcontractor within 10 days of General receiving final payment from Owner. No back charge shall be valid
unless Subcontractor is notified in writing within 72 hours from the occurrence of the act resulting in the alleged bad( charge and provided with a detailed
breakdown of said charge. Owner anctor General to carry Builders Risk in the amount satisfactory to Subcontractor.
Work to be completed according to standard practices. Any alteration or deviation from above specifications involving extra costs will be executed only
upon written orders and will become an extra charge over and above the estimate. No lines or penalties of any kind shall be valid due to causes beyond
our control. including to but not limited to weather, strikes, delays caused by other trades. etc. Owner is to carry fire, tornado and builders risk. and other
necessary insurance.
Acceptance of Proposal - the above prices, specifications and conditions are satisfactory and are hereby accepted. Payment 5 days overdue shall bear
interest at the rate of 1 1/2% pet month until paid in lull. Customer shall pay all attorney's fees and costs of collection.
NOTICE: All changes that have been directed to be performed by the contractually required personnel. Executed change orders must be provided to Les
File Drywall no later than 30 days from the date of this notice. Payment for ChangeQtgalutueuvithin 3041Y.SffiletelaffilliaLidifat. Unless Les File
Drywall receives written notice of the contracting party's intent not to pay for the listed change orders below within 5 days of receipt of this notice, the cost.
including attorneys' lees and costs of collection. Les File Drywall reserves the right to halt all change order work for failure to pay change orders as
specified above.
Accepted By:
Witnessed By:
Date of Acceptance:
EFTA00611601
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Document Details
| Filename | EFTA00611600.pdf |
| File Size | 136.3 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 5,298 characters |
| Indexed | 2026-02-11T23:04:34.136163 |