EFTA00615063.pdf
PDF Source (No Download)
Extracted Text (OCR)
Gulfstream'
A 0 •NfAAL
DYNAMICS COMPANY
15 February 2013
Mr. Larry Visoski
Hyperion Air, Inc.
3800 Southern Blvd., Suite #204
West Palm Beach FL 33406
Office:
Dear Mr. Visoski,
In response to your request, Gulfstream is pleased to provide the following Service Center proposal for maintenance
to be accomplished on this Gulfstream GIV aircraft.
After review of this proposal and its attachments (if applicable), should you have any questions, concerns, or
scheduling requests, please feel free to contact me, so we can coordinate a mutually agreeable input date for your
aircraft. Furthermore, if this proposal with its attachments and Terms and Conditions is acceptable to you, please
sign and return the Summary page to
or
Thank you for considering Gulfstream for the proposed workscope on your aircraft. Please do not hesitate to call me
with any questions or for additional information.
Sincerely,
Tom Baliya
National Sales Mana er
Office:
Mobile:
Fax:
WPUdlh
EFTA00615063
ctifirkS
t fr
l
erf
ea
DYNAMICS COMPANY
WORKSCOPE
1.
Aircraft Records and Condition Survey (Exhibit I)
Labor and Materials
$24,000.00
GAC0213-408-GIV.OCS-R00
15 February 2013
Hyperion Air. Inc.
Description:
The Aircraft Records and Condition Survey includes Records / Logbook Research and Pre-buy Inspection
Schedule of Events
•
Review workscope and identify points of contact with both buyer and seller present and have both
parties sign the Hold Harmless Agreement.
•
The party requesting and financially obligated for the Aircraft/Records and Condition Survey (usually
the Buyer) must have an authorized representative sign the work order and the Hold Harmless.
•
There will be a representative from all parties involved that will make decisions on all minor
corrective actions to be accomplished during Aircraft/Records and Condition Survey.
•
If there is no representative present, no corrective action can be accomplished until authorized.
•
Upon completion of the Aircraft/Records and Condition Survey, the discrepancy list will be provided
to the party(s) responsible for disposition.
•
If a second or third party is involved with rectification of any discrepancies found, the parties will
identify who will be responsible for the corrective actions.
•
At this time, separate work orders will be opened and responsibilities assigned to each party for the
work requested.
•
All parties involved, based on the Service Center workload, at that time will mutually agree to the
downtime schedule for the authorized work.
The Aircraft/Records Survey includes the following:
Review of Maintenance History and Records: A review of all available maintenance records will be
accomplished. The review will include a search for recorded damage history, special inspections
accomplished, missing records, compliance with required inspections, maintenance, and mandatory
directives. Any problems with incomplete or improper maintenance entries, missing certificate numbers or
signatures, or disorganized maintenance logs will be documented in the report. If a complete reconstruction
of maintenance records or logbooks is desired, it will be considered an effort over and above the basic
Survey price and schedule and will be performed at time and material upon approval.
Documentation of Non-Applicable Maintenance Bulletins: Gulfstream will update the aircraft records
for non-applicable or previously accomplished directives (ACB, CB & AD) that are not documented in the
maintenance records. A budgetary, estimate to research and document non-applicable or previously
accomplished bulletins is S75 per occurrence. Incomplete records may substantially increase this cost.
Review of Required Aircraft Documentation: A review of weight and balance, equipment list, and
electrical load analysis will be performed to determine that the known current aircraft configuration is
reflected. All data will be cross-referenced against Major Repair and Alteration FAA Form 377 found and
the avionics inventory. Subject matter and date of Form 337 and any related Supplemental Type
Certificates (STC's) numbers will be listed. The certificate of airworthiness and current registration will be
checked to ensure a match to the aircraft.
Review of Required Flight Manuals & Supplements
Gulfstream approved flight manuals will be reviewed to determine revision status and presence of all
required approved flight manual supplements. Flight manual supplements will be cross-checked against
STC's.
Update of Required Flight Manuals and Supplements: If required, Gulfstream will update any missing
or outdated items in the flight manual supplements section of the flight manual or supplement binder with
current data. A budgetary estimate to research and retrieve missing flight manual supplements is S75 per
occurrence. Incomplete records may substantially increase this cost.
Page 2 of 9
This proposal is confidential between Gulfstream and the customer.
EFTA00615064
Gulfstreant
A OISNERAL DYNAMIC• COMPANY
GAC0213-408-GIV.OCS-R00
15 February 2013
Hyperion Air. Inc.
The Condition Survey includes the following:
Functional Test of Avionics Equipment: An avionics ramp check is performed and involves powering up
all major avionics equipment and functionally testing navigation, communication and flight management
systems for proper operation. Results will be fully documented on the work order and findings will be
highlighted in the Survey. As the Survey progresses, discrepancies may be identified. At this point,
discrepancies will be listed on summary sheets and provided to customer. They will be identified as
information items or items required for return to service and will be performed at Time and Material. Any
Engineering dispositions will be an additional expense and will be billed, As Required.
Inventory of Avionics and Emergency Equipment: A physical inventory of major avionics equipment
will be accomplished and the results recorded in the report. The avionics inventory is limited to accessible
areas only, additional access will be billed at time and material. This inventory will be cross- referenced
against the equipment list during the documentation review. All cabin and cockpit installed emergency
equipment will be inventoried and recorded in the report.
Physical Survey: Is in accordance with attached Gulfstream CMP (Computerized Maintenance Program)
tasks, which provide a detailed view of specified areas of aircraft. The suggested survey workscope is
intended to provide you with a thorough physical evaluation of selected areas of the aircraft.
Cockpit and Cabin Compartment above Floor Inspection: A general visual Inspection will be
performed of cockpit. cabin, and baggage compartments for mechanical and cosmetic discrepant conditions
which are deemed as unsatisfactory. This above floor inspection does not include operational testing of
components or equipment. Corrections and repairs to discrepant conditions found will be accomplished as
time and materials. Interior access will not be required or included for this general visual inspection.
Aircraft Records and Condition Survey Report: The report is a bound document and is divided into
fourteen (14) indexed sections. The format facilitates rapid access to desired information and highlights the
major elements of the Survey. All findings and information yielded by this Survey will be provided in the
report and on the related work order upon completion of the Survey. Two (2) copies of the report will be
provided to the purchaser of the Survey and one (I) copy of the discrepancies noted to the owner
(additional report copies are available at $150.00/each). Copies will not be provided to any other party
including the owner of the aircraft unless expressly authorized in writing by the purchaser of the Survey.
Ootional Services
Gulfstream also offers a complete in-house detailing service for your Gulfstream aircraft. Our experienced
team of professionals can perform any detailing service; from a dry wash of the aircraft exterior to
shampooing and stain-treating carpets and furnishings. Exterior services include washing of the aircraft (to
include landing gear), waxing the aircraft with Aeroglaze, buff and polish of leading edge "brite work",
and sanding to remove surface corrosion. An application of Teflon coating is also available to enhance the
life of your paint as well as to reduce aircraft exterior cleaning time and costs. Interior services include
sanitizing galley and lavatories, re-corking of drawers, shampooing of carpets, re-oiling of leather, and an
application of soil and stain repellent for the carpet and upholstery.
2.
Option: Auxiliary Power Unit Borescope (Exhibit 2)
Labor and Materials
$900.00
Task:
Perform APU Borescopes.
3.
Option: Engine Runs and Borescopes (Exhibit 3)
Labor and Materials
S14,500.00
Task:
Perform Engine Runs and Borescopes.
Page 3 of 9
This proposal is confidential between Gulfstream and the customer.
EFTA00615065
Gulfstreanef
A osesanAL DYNAMIC• COMPANY
GAC0213-408-GIV.OCS-R00
15 February 2013
Hyperion Air. Inc.
4.
Option: Landing Gear Corrosion Inspection (Exhibit 4 Dunlop I Exhibit 5 ABS)
Labor and Materials
$23,000.00
Note: For budretary planning purposes, estimated material and outside services for the above quoted CMP
package is approximately $500.00 and it does not include material required for clearing of any
discrepancies.
5.
Option: Two (2) Pilot's for Condition Survey Flight (Must be Performed with Engine Runs and
Borescopes)
Labor and Materials
$5,500.00
Task
Two (2) Pilots for Condition Survey Flight (Based on an eight (8) hour day).
Condition Survey Flight
•
Engine runs and borescopes will be required prior to performing a Gulfstream Condition Survey Flight
and is not included with this option.
•
The Engine Runs and Borescope Option must be selected / performed prior to the Condition Survey
Flight:
•
The flight test card will be identical to the one used by our own Gulfstream Flight Department to
evaluate pre-owned aircraft that are being considered for purchase by Gulfstream.
•
This is an extensive flight test regimen flown by Gulfstream test pilots (at an additional expense).
•
Test flight results are fully documented and reported in work order and Survey Report. The optional
Flight Test may affect downtime.
•
All pilot's fees and travel expenses will be the responsibility of the customer per the Gulfstream labor
rate letter and is not included in this proposal.
Note: Fuel will be billed on actuals.
6.
Option: ASC 416A - MSG3 Maintenance Program
Task
Accomplish ASC 416A - Time Limits/Maintenance Checks (ATA 5) MSG-3 Maintenance Program
Conversion.
Description
The MSG-3 Maintenance Program Conversion is based upon an analytical process designed to identify
scheduled tasks and maintenance intervals based on the aircraft operating capabilities.
This inspection program reduces maintenance costs without affecting aircraft safety or reliability.
Gulfstream, operators, suppliers and the FAA participated in the development of the MSG-3 program.
The man-hours required for converting to the MSG 3 Program will vary with each aircraft configuration
and the standardization between aircraft in an operator's fleet.
ASC-416A is a managed program. Please contact Gulfstream Customer Support at I.800.810.4853.
MSG-3 Program savings include but are not limited to the following:
•
Extending the current I50-flight hour check to 450 flight hours, known as an "A" check.
•
The number of annual or calendar inspections are reduced based on a 12 month "C" check interval.
•
Engine options is available per Rolls-Royce Service Bulletin 70-1493
Page 4 of 9
This proposal is confidential between Gulfstream and the customer.
EFTA00615066
Gulfstream®
A osesanAL DYNAMICS COMPANY
Budgetary Pricing Only
Phase I
•
GIV-GER-1197 (Aircraft Transition Plan) $10,000
•
Initial Engineering Review $20,000
•
Rolls Royce Service Bulletin 70.1493/1517 - $5,000
Phase II
•
ASC 416A (Parts 1 & 2) - $15,000
•
Structural Audit (Fatigue and Damage Tolerance Evaluation) - $30,000
GAC0213-408-GIV.OCS-R00
15 February 2013
Hyperion Air. Inc.
Notes:
•
Military and Special Missions Aircraft require additional research to evaluate the Mission Plan and
flight operations. Pricing is subject to change on these aircraft and aircraft not outfitted at a Gulfstream
facility.
•
Pricing varies depending on aircraft configuration, repairs and modifications that have to be evaluated.
Down Time: Down-time typically not required, unless supplemental inspections required prior to
ASC416A Part 2 sign off.
Process: Operator commits to the Program with a signed agreement and purchase order. The Aircraft is
scheduled and transition is initiated
7.
Option: ASC 488 - Fuselage Station (FS) 793 Bulkhead Cap Angle - Replacement
Labor and Materials
$137,209.00
Task
Accomplish Aircraft Service Change (ASC) 488 - Fuselage Station (FS) 793 Bulkhead Cap Angle -
Replacement.
This price is predicated on performing ASC 488 and the 5000 Landing Structural Rat Rated Inspection
concurrently.
Aircraft Service Change Description
The FS 793 Cap Angle may require replacement as a result of performing the FS 793 Aft Bulkhead Cap
Angle - NDT Inspection (CMP 535201). This service change replaces the existing two (2) aluminum cap
angles on the aft side of the FS 793.75 bulkhead with a one-piece stainless steel cap angle to reduce the
possibility of cap angle fatigue cracks.
Effectivity: This service change is applicable to all GIV Aircraft.
AIRFRANIE CONTINGENCIES
This proposal does not include correction/clearing of any discrepancies and/or corrosion that may be found. outside services.
additional due items (i.e. customer requirements. completion/outfitter requirements. Part 135 "for hire" requirements. etc.).
and/or consumables. These issues will be addressed separately from this proposal with the customer and may impact scheduled
downtime.
Any revision(s) to Chapter 5/Maintenance Schedule issued prior to aircraft arrival may affect the inspection price. Should
additional work be required. it will be accomplished on a time and material basis, unless otherwise noted.
For aircraft with standard paint schemes (one (I) base color and two (2) stripes), the sealing and touch-up (by brush) of panels
will be considered part of the inspection hours for that task. Aircraft with non-standard paint schemes will be charged for the
additional time required to complete the paint touch-up. Time required to seal and touch-up sealant for discrepancies on items
not open for inspection being performed during this visit will be billed at time and material.
Page 5 of 9
This proposal is confidential between Gulfstream and the customer.
EFTA00615067
Gulfstream®
A OSIMMAL DYNAMICS COMPANY
REMITTANCE INSTRUCTIONS
GAC0213-408-GIV.OCS-R00
15 February 2013
Hyperion Air. Inc.
Checks:
Gulfstream Aerospace Corporation
(Overnight) Gulfstream Aerospace Corporation (Box #730349)
P.O. Box 730349
do JP Morgan Chase Bank. NA
Dallas, TX 75373-0349
Ann: Dallas National Wholesale Lockbox TX1-0029
14800 Frye Road
Ft. Worth, TX 76155
Wire Transfer Gulfstream Aerospace Corporation
Instructions:
JP Morgan Chase Bank. NA
I Bank One Plaza
Chicago. IL 60670
Account No. 10-15825
Reference your Five (S) Digit Customer Number (XX-XXX)
Bank
Fedwire Routing No. (ABA) 021 000 021
Identifiers:
S.W.I.F.T CHASUS33
ACH Credit Routing No. (ABA) 071 000 013
Note: Please reference one of the following (as applicable):
•
Invoice No.
•
Sales Order No.
•
Job or Work Order No.
•
Aircraft Serial or Tail No.
•
Contact Name
•
Customer Account No. (XX-XXXX)
TERMS AND CONDITIONS
Gulfstream Aerospace Corporation requires the estimated amount be paid in full for Aircraft/Records and Condition Survey prior
to aircraft induction to Service Center. All Aircraft/Records and Condition Survey related discrepancies must be paid in full
prior to aircraft departure.
Except as set forth below, payment terms are net 30 days from date of invoice. For Work estimated to exceed 5100.000.
Customer agrees to make progress payments on the following schedule: 113 of the estimated amount prior to commencement of
Work on the Aircraft. 1/3 within 10 days after Gulfstream's written notice that the Work is approximately 50% complete. and
final payment 30 days from date of final invoice. Additional deposits may be required for long-lead or special purchased pans.
which are not refundable should the visit be cancelled or work scope changed to eliminate those items. If any portion of an
invoice is disputed. then Customer shall nevertheless pay all undisputed amounts per this schedule. Gulfstream shall not be
required to release Customer's Aircraft to depart if Customer's total outstanding balance owed to Gulfstream exceeds the lesser
of $100.000.00 or Customer's available credit limit. All sums past due bear interest at the lesser of 1.5% per month. or the
maximum rate allowable by law, plus reimbursement for attorney fees and other costs of collection.
All prices stated herein are exclusive of freight. fuel, flight costs, and / or environmental fees. Additionally. customer is
responsible for all federal, state, local and foreign taxes, levies, penalties and tariffs applicable to the work performed hereunder.
the materials used or transportation (other than taxes on income of Gulfstream) and customer shall indemnify and hold
Gulfstream harmless with respect thereto.
This proposal is not valid at Gulfstream's Luton United Kingdom facility.
Work items not quoted in this proposal will be billed on a time and material basis per our published labor rates at the time of
aircraft induction for Maintenance. Electrical. Avionics. Refurbishment, and Engine/APU Maintenance. For time and materials
work: (a) labor (including engineering services) is billed according to the rates set forth in the Gulfstream Labor Rate Letter in
effect as of the date the work is performed.. and (b) materials are billed according to Gulfstreant's standard prices in effect on the
date the material is used. Any incremental charge under Gulfstream's Component Exchanged Program will be billed by
supplementary invoice.
This proposal is contingent on all work being accomplished during the same timeframe. unless otherwise noted.
Page 6 of 9
This proposal is confidential between Gulfstream and the customer.
EFTA00615068
cg
fStreanf
DYNAMICS COMPANY
TERMS AND CONDITIONS (continued)
GACO213-408-GIV.00S-R00
15 February 2013
Hyperion Air. Inc.
The quoted prices are valid for a period of thirty (30) days of receipt of proposal. unless otherwise noted.
Gulfstream recommends a firm schedule be established and work be completed within the next three (3) to six (6) months from
the date of this proposal. Any change in workscope and/or schedule may require review by Gulfstream and requires revision of
this proposal. Gulfstream reserves the right to pass on price increases to the customer.
The Customer is responsible for making certain that all specific preservation tasks related to the Aircraft. its engines or systems.
that are required or may become required while the Aircraft is at Gulfstream's facility for the Workscope be indentified on the
Work Authorization squawk list.
Gulfstream warrants that the work conforms to the pertinent specifications prescribed by the applicable aircraft I component
manufacturer. and that any components or other items supplied hereunder (but excluding customer-furnished items) are free from
defects in material and workmanship. This warranty extends to defects discovered within twelve (12) months. or one thousand
(1.000) flight hours. whichever comes first, after completion of the work: except that the warranty period for any work
performed as warranty work is equal to the pre-existing unexpired warranty period. Parts qualifying for the "Exclusive
Gulfstream Parts Warranty Extension" Program. or other extended published Gulfstream warranty programs. if any. are entitled
to an extended warranty period pursuant to the terms of such Programs as they exists on the date this agreement is executed.
Proposal pricing and schedules are contingent upon the customer supplying the existing avionics, electrical, and aircraft system
prints, drawings and diagrams. which accurately represent the current condition of the aircraft. Any changes from the existing
drawings will be performed on a time and material basis with customer approval. Any relocations of existing equipment required
due to space limitations will be performed at time and materials until a firm proposal can be prepared. Detailed parameters of this
proposal may require modifications following an in-depth physical inspection.
Materials used during the clearing/correction of discrepancies and/or items based on time and material will be quoted and/or
invoiced on an "As Required" basis.
There will be a 3.5% charge for consumables. to a maximum of 54.000.00. on all work orders containing labor revenue charges.
This charge will be calculated based on the total labor revenue man-hours invoiced on the work order. Only invoices defined as a
"Road Trip Invoice" will be exempt from this charge.
Customer furnished parts and drop shipments will be subject to a handling fee of 15% based on current manufacturer list price.
The handling fee will not apply to parts originally purchased from Gulfstream. Proof of purchase from Gulfstream must be
shown to waive the handling fee.
If enrolled in Gulfstream's PlanePartsni program. certain components supplied in regard to this proposal will be at no charge to
the Customer. To enroll or learn more about the program. please visit http://www.gulfstream.com/product suopon/planepans/.
Any estimates given for outside services are not intended to be exact figures. Repair. calibration, overhaul. and/or exchange
pricing will be billed as accrued, be it either less than or more than quoted.
Changes to the Completion Center Maintenance Handbook (CCMH) or Cabin Operating Manual (COM) are not included as part
of this proposal. Should a modified CCMH or COM be requested. it will be quoted separately or performed on a time and
materials basis.
Any changes to the Minimum Equipment List (MEL) are the Customer's responsibility and are not included herein.
All exchange parts prices are subject to our vendor acceptance of exchange core. Should exchange core be rejected or subjected
to an extra charge by Vendor at any time for reasons of abnormal wear and tear, damage. unauthorized modifications. or other
discrepancies. the customer agrees to reimburse Gulfstream for resultant extra costs.
Any existing unused wiring will be capped and stowed. Wiring removal (if requested/required) will be handled on a time and
material basis and billed additional to the proposed amount.
All removed equipment will be retained by Gulfstream. unless otherwise noted.
Interior access will be performed on a time and material basis. unless otherwise noted within this proposal.
Page 7 of 9
This proposal is confidential between Gulfstream and the customer.
EFTA00615069
Gulfstream'
A GUN
DYNAMICS COMPANY
TERMS AND CONDITIONS (continued)
GAC0213-408-GIV.OCS-R00
15 February 2013
Hyperion Air. Inc.
When aircraft is firmly scheduled into a Gulfstream facility, preliminary engineering and planning commences, and materials /
components are ordered for the workscope. If the workscope is canceled. the customer will be charged for any labor expended
and/or any restock charges incurred on materials I components ordered. If materials / components cannot be returned to
vendor(s), customer will be billed in full for these items. In such case, the materials I components would become the property of
the customer. If the workscope is rescheduled for a later arrival, these charges will be applied to the rescheduled visit.
Working days are defined as Monday through Friday. Should additional work be required. other than that quoted herein, the
estimated downtime may require extension. This proposal does not include overtime. Any overtime required will be approved by
the customer prior to work commencing. All non-scheduled NDT will be on an overtime basis due to NDT planned scheduling.
Customer's oral changes increasing the scope of the Work or approving overtime are binding (unless otherwise provided by law).
International Contingencies (If Applicable; Foreign Registered Aircraft Only with Domestic Input): Foreign Operators
Civil Air Authority (FOCAA). FAA. or concurrence of both agencies must first approve this STC Project prior to start of aircraft
modification. Any cost involved in this approval process will be charged as time and materials. Upon customer's acceptance of
this proposal. Gulfstream will submit an "Undue Burden" Project Request or FOCA certification fees to the FAA ACO or
FOCAA as applicable. Once the FAA and/or FOCA approves the "Undue Burden" Project Request or FOCA certification fees.
the ACO will notify the Foreign Civil Air Authority (FCAA). Once the FAA ACO receives concurrence from the FCAA. the
ACO will notify Gulfstream. Gulfstream will submit Application (8110-12). Cert. Plan and an LOI to the FAA ACO and/or
FOCA. Please note (if applicable), the time estimated to accomplish these steps is approximately three (3) to six (6) months
depending on resource availability of the FAA and/or FOCA.
If there is any conflict between these Terms and Conditions hereof and any document incorporated herein by reference. then
these terms and conditions shall control unless such document expressly states the contrary.
Quoting Contact:
Dan Hyde. Mechanical Quotin Mana er
Tele:
or email:
Page 8 of 9
This proposal is confidential between Gulfstream and the customer.
EFTA00615070
Gulfstream'
A GUN
DYNAMICS COMPANY
PROPOSAL SUMMARY
GAC0213-408-GIV.OCS-R00
15 Febniary 2013
Hyperion Air. Inc.
•
Please initial items in Accept/Decline columns. (Please note that quoted dollars and downtime may vary based on concurrent %lurk
with accepted/declined items.)
Item
Workscope
Amount
Accept
Decline
I.
Aircraft Records and Condition Survey
$24,000.00
2.
Option: Auxiliary Power Unit Borescope
$900.00
3.
Option: Engine Runs and Borescopes
$14,500.00
4.
Option: Landing Gear Corrosion Inspection
$23,000.00
5.
Option: Two (2) Pilot's for Condition Survey Flight (Must
be Performed with Engine Runs and Borescopes)
$5,500.00
6.
Option: ASC 416A MSG3 Maintenance Program
See Item
7.
Option: ASC 488 — Fuselage Station
$137,209.00
♦ Downtime required for this workscope will be eleven (11) working days. This downtime estimate is subject to
any discrepancies that may be found.
♦ Leadtime required for this workscope will be five (5) calendar days after proposal acceptance and is subject to
equipment availability.
♦ The Aircraft Records and Condition Survey is limited in scope, and Gulfstream cannot guarantee that this
Survey will uncover all problems that exist with the inspected aircraft. Ultimately, the buyer must rely on their
own judgment as to the aircraft value and the seller's warranty, if any, as to the aircraft's condition.
♦ This proposal (or estimate) expressly incorporates and is subject to Gulfstream Aerospace Corporation's
standard work authorization Terms and Conditions. Your acceptance of all or any portion of this proposal (or
estimate confirms your agreement to accept those standard Terms and Conditions. (Please sign and return this
page to
Proposal Acceptance Signature
Date
This proposal summary does not include items based on time and material, discrepancies or corrosion found or other materials required. handling
fees. or other additional expenses outside the specified workscopc of the enclosed proposal.
Page 9 of 9
This proposal is confidential between Gulfstream and the customer.
EFTA00615071
GIV Aircraft / Records and Condition Survey (Exhibit 1)
NON-MSG3 Aircraft
RFQ # GAC0213-408-GIV.OCS-R00
CMP
Primary Code Description
100310
CK AIRWORTHINESS DIRECTIVES
100320
CK SERVICE BULLETINS
134401
C/W AVIONICS INVENTORY
191108
REVIEW A/C STATUS AND RECORDS
231001
AVIONICS--FUNC RAMP TEST
291030
Combined Hyd Sys DPI (Eng-driven Pump Bypass) - Inspection
291031
Flight Hyd Sys DPI (Eng-driven Pump Bypass) - Inspection
291032
Combined Hyd Sys DPI (Main Pressure) - Inspection
291033
Flight Hyd Sys DPI (Main Pressure) - Inspection
291034
Combined Hyd Sys DPI (Main Return) - Inspection
291035
Flight Hyd Sys DPI (Main Return) - Inspection
292020
Auxiliary System DPI (Pressure) - Inspection
292021
Auxiliary System DPI (Return) - Inspection
292024
Utility System DPI (Pressure) - Inspection
292025
Utility System DPI (Pump Bypass) - Inspection
330007
Emergency Exit Lights - Operational Test
330010
Exterior Lights - Operational Test
324108
Wheel Brake Lining - Wear Check (Brake-By-Wire)
324268
Brake Linings - Wear Check (HMAB / Dunlop)
351005
Crew Oxygen System (Pilot) - Operational Test
311006
Crew Oxygen System (Copilot) - Operational Test
521009
Baggage Door Inflatable Seal Sys - Ops Test
532005
Cabin Compartment Above Floor - Inspection
532017
Cockpit Compartment Above Floor - Inspection
532027
Entrance Compartment Behind Panel - Inspection
532041
Baggage Compartment Above Floor - Inspection
532067
Tail Compartment Above Floor - Inspection
533005
Exterior Fuselage - Inspection
534015
Main Landing Gear Installation (Left) - Inspection
534016
Main Landing Gear Installation (Right) - Inspection
534018
Main Landing Gear Wheel Well Compartment - Inspection
534020
Nose Wheel Well and Gear - Inspection
535008
Nose Compartment / Radome Interior - Inspection
541017
Pylon External / Internal (Left) - Inspection
541018
Pylon External / Internal (Right) - Inspection
551019
Horizontal Stabilizer/ Elevator (Exterior) (Left} - Inspection
273003 ELEVATOR FREE PLAY--INSP (Related Code)
551020
Horiz Stabilizer / Elevator (Exterior) (Right) - Inspection
553005
Vertical Stabilizer / Rudder (Exterior) - Inspection
554007
Rudder External - Inspection
571005
Wing Exterior (Left) - Inspection
571006
Wing Exterior (Right) - Inspection
490002
AUX POWER UNIT--OPS TEST
490005
APU Enclosure - Inspection
490052
APU - Operational Test
490053
APU Enclosure GTCP36-150(G) - Inspection
GTCP36-100 APU ONLY
GTCP36-100 APU ONLY
GTCP36-150(G) ONLY
GTCP36-150(G) ONLY
Page 1 of 5
EFTA00615072
Auxiliary Power Unit Horoscope (Exhibit 21
RFC)/
GACO2B-40g-GIV.00S-R00
(NIP
PrUnarm, Code newt-lotion
49000'
APU GTCP 36-100 - Borewope
490000'
APU GTCP 36-150 - Borewope
EFTA00615073
Op
Engine Runs and Borescopes (Exhibit 3)
RFQ#
GAC0213-408-GIV.OCS-R00
COP
Primary Code Description
710019
Powerplant internal- Inspection
711009
Cowl Latch. Engine (Left) - Rigging (Related Code)
710025
Engine Borescope inspection
710031
Engine-Ops Test
732001 Engine Acceleration - Test! Adjustment (Related Code)
732005
Engine Deceleration - Test! Adjustment (Related Code)
732049
Engine Handling (ACU) Solenoid - Ops Check (Related Code)
732057
Engine Approach Idle Solenoid - Ops Check (Related Code)
732011 Ground Idle. Engine - Test! Adjustment (Related Code)
732013
Approach Idle - Adjustment / Test (Related Code)
783013
T/Rev Interlock Feedback Sys (LH) - Ops Test (Related Code)
783014
T/Rev Interlock Feedback Sys (RH) - Ops Test (Related Code)
783017
Maximum Rev Thrust (LH) - Ops Test f Adjust (Related Code)
783018 Maximum Rev Thrust (RH) - Ops Test! Adjustment
730001
Fuel Contamination Check. Engine - Inspection
742001
Engine Ignition System • Ops Check
742006
No.2 Igniter Plug - Removal / Installation
742016
No.2 Igniter Plug - Inspection
774955
Engine Chip Detector- Visual Check
792007
Filter. Engine Pressure Oil • Cleaning / Inspection
791033
Eng Oil Level - Check / Service. Using Onbd Sys (Related Code)
792013
Engine Scavenge Strainers - Inspection
710020
Powerplant internal- Inspection
711010
Cowl Latch. Engine (Right) - Rigging (Related Code)
710026
Engine Borescope Inspection
710032
Engine • Ops Test
732002
Engine Acceleration - Test! Adjustment (Related Code)
732006
Engine Deceleration - Test / Adjustment (Related Code)
732050 Engine Handling (ACU) Solenoid - Ops Check (Related Code)
732058
Engine Approach Idle Solenoid - Ops Check (Related Code)
750006
Airflow Control System - Test (Related Code)
732012 Ground Idle. Engine - Test I Adjustment
732014
Approach Idle - Adjustment /Test
730002
Fuel Contamination Check. Engine - Inspection
742002
Engine Ignition System • Ops Check
742008
No.2 Igniter Plug - Removal / installation
742018
No.2 Igniter Plug - Inspection
774956
Engine Chip Detector- Visual Check
792009
Filter. Engine Pressure OU - Cleaning / Inspection
791034
F.ng Oil Level - Check / Service. Using Onbd Sys (Related Code)
792014
Engine Scavenge Strainers - Inspection
Page 3 of 5
EFTA00615074
Landing Gear Corrosion Inspection (Exhibit 4)
Dunlop Wheels and Brakes
RFQ N GAC02B-108.61V.OCS-R00
CMP
Primars Code Description
320011
Nose Landing Gear and Components • Detailed Inspection
1N1006 Nose Landing Gear and Systems - Lubncation
1N1027 Nose Landing Gear Axle Assy - Corr Inhib Comp App
320028 Nose Landing Gear Shock Sum Assy - Con Inhib Comp App
320030 Nose Landing Gear Truss Brace Amy - Corr Inhib Comp App
320031 Nose Landing Gear Upper Upper Trunn Attach Points Corr Inhib Camp App
320032 Nose Landing Gear Upper Drag Brace Attach Pm - COI( Inhib Comp App
320033 Nose Landing Gear Striker Arms - Corr Inhib Comp App
322028 Nose Gear Shock Strut - Service
322036 Nose Gear Axle Fitting - Removal / Installation
123001 Landing Gear Normal - Rinctional Test
123004 Landing Gear Emergency Extension - Rinctional Test
124009 Nose Gear Wheel Any (Left) - Removal / Installation
124010 Nose Gear Wheel Any (Right) - Removal /Installation
125001 Nose Wheel Steering - Functional Test
325010 Nose Wheel Steering Unit Removal/Installation
320013
Main Landing Gear and Components (Left) - Detailed Inspection
320004 MW and Systems (Left) Lubrication
320015 MW Axle Fitting Attach Pin (Left) Corr Inhib Comp App
320017 MW (Left) Axle Fitting - Corr Inhib Comp App
320019 MLG (Left) Shock Absorber - Corr Inhib Camp App
120021 MW (Li) Side Brace Act Attach Pins & Trunn Area Corr Inhib Comp App
320023 MW (Leh) Uplock Roller - Corr Inhib Comp App
320023 MW (Leh) )Striker Ann Corr )dub Comp App
321013 MW Spindle Pin (Leh) Removal / Installation
321031 MW Shock Absorber (Leib- Removal /Installation
321073 Main Landing Gear Trunnion Pin (Leh Alt) - Removal/Installation
323002 Landing Gear Cycling - Operational Check
323015 Actuator. Main Landing Gear Side Brace (Lett)
324250 MW Wheel Assy (la Outboard No. I) -Rem/ Ina (Dunlop)
324231 MW Wheel Assy (L. Inboard No. 2)- Rem 1 Inst (Dunlop)
324220 MW Wheel Bearing IL Outboard No. 1) - Inspection 1 Pack
324221 MW Wheel Bearing IL Inboard No. 2)- Inspection / Pack
324260 Main Gear Brake (Left. Outboard No.1) - Removal / Install
324261 Main Gear Brake (Left. Inboard No.1)- Removal?Inaall
324206 11)droMecharucal Analog Brake Wear• Detailed Inspection
324207 Parking /Emergency Brake Operational Test
320014
Alain Landing Gear and Components IRIghtl • Detailed Inspection
3N/005 MW and Systems (Right ) Lubrication
3N)016 MW Axle Fatting Attach Pin (Right) - Corr Inhib Comp App
320018 MW (Right) Axle Fining- Corr Inhib Comp App
320020 MW (Right) Shock Absorber - Con !Myth Comp App
313022 MW (II) Side Brace Act Attach Pins & Trunn Area - Con Inhib Comp App
320024 MLO (Right) Uptick Roller- Con Inhib Comp App
120026 MW (Right) Striker Arm - Con Inhib Comp App
321016 MW Spindle Pin (Right) - Removal / Installation
321032 MW Shock Absorber (Right) - Removal I Installation
321076 Main Landing Gent Manton Pm (Right Aft) - Rem / Inst
323016 Actuator. Main Landing Gear Side Brace (Right)
324252 MW Wheel Assy(R. Inboard No. 3)- Rem 1 Inst (Dunlop)
324253 MW Wheel Any(R. Outboard No. 4)- Rem/ Inn (Dunlop)
324222 MW Wheel Bearing (R. Inboard No. 3)- Inspection/Pack
324221 MW Wheel Bearing IR. Outboard No. 4) - Inspection / Pack
324263 Main Gear Brake (R. Inboard No. 3) - Rem / Inst (Dunlop)
324264 Main Gear Brake (R. Outboard No.4)- Rem / Inst (Dunlop)
EFTA00615075
(Al' liandiad Gear Coreallo MaritalIan 03000 Si
ABS Wheat sad BoArt
;hamar. Coe Diarisiew
321003
Mails laminae Gen Componseue 03-Detailed Canada laiipeoded
3210=
?Inn Larding Our aril, • Iriteicanan
321221
}heat hiding One CIC Rearclo•.4hoe <Leh •
2212111
311(1 Axle Nude Mush Pm Leh iC1C App1aassi
321235
MUG Axle fitted .Ina A0e Luang Nut (Lehi Cif APPlaulan
321239
>ILO =act Abeoita Upper
Lama Much Pint 11.1 CIC Aptilieasu
221243
Seletirano Actuate. Allah Ras Timmins AnalLcOI CIC Antlitaxa
321247
Main Landing Gear Oriole Wks IWO Of Arrkeaion
321251
>las Idedeng One Su0a Nml1n0ICICApplkdua
321029
Ilan. Gal MIN/. Pin deft A0). Renaud / Ineullarse
321217
MIDI Lading Gear Shock Absolve lLt(il• Reward 1' Irsallalion
nix,'
Nina Lading Coat Shwt Atewbcs NUN) SenucwIg
324101
Bukc Aunahly itert Ositholedi • RmuvalfInWlnwa
3241%
Doke Auntie>(Len Idwasdi • Raaavalf InsdNm0
224144
MI10 Willitelt Gra Brak Assent!). (Lail °inboard) D Inspection
3241.15
Slems lauding One Beale Aisenty(140 bibrun) • D. Inepailoa
3242lC
Asiustid • R111:1101141 Ted
224221
Wheel Spud Traneducer iLehOisibtunb• Remove / Ireaalleuon
3242=
Wheel SgeolTiartediees dell
Remota I lissallaion
32)011
Mak Leading Gra 50threot (40 • Removal I 11.•111411•Xl
323903
Unclad Gear • Pentland Toi
321901
LAMM( Gra Enniecua Oasis.. • Opearsaul Tea
52400)
Slain Mad Averrily tido Ointamth • Renaud
22400)
Shin Larding Ord Mad Krunng Oak °abated. hemmer if Clad
324004
Shia WIed Auciebly iLOl hawed, • Reseed Insiallaias
324010
>Ina 1-ding (-me Med Bang 'Len luboads • llopcupos (Check
224010
?bin Lading Ord Whorl Buffing (Lou Inboard. Int/coca /Cheek
321004
Ws Landis* Gear Componcels 'RI • Detailed Corrosion Iteptellon
321036
Ilaas lauding Case ittelio • labiluaitia
3212
Main Lading Gra CICRa0glia0n(Rigtll
3212,2
5ILLI Axle Aiwa Aiierh
(ROO C1C Appbeitace
3212!6
SILO Axk Rung and Ade Fining Net illtierlitiCIC Agthe aeon
321210
}ILO Shock Atsoibire Urpti to Louts Much PinsIR)0C Appkaawn
221244
Seleteate Accuse. Allah Piss nasals* Ana tRisho CIO Archaean)
221241
>las lauding One Uplork Rote 11400 C1C Apple:80m
321232
Main Lading Ord Suites Ann (Right, Cr APPliedall
321030
>Ins Greg Tffillt0111
• Ruowl/liistallation
321214
>Ins lauding Our Shod. Ateadiee iRatho• Removal lestallaion
3212(C
>Ins lauding (kW Sail Ah.lbet IIRathi)• Scruas?
521107
bake Aurally iRigls Nevada RCOWVIII fLisialbusa
324101
Bake Mandl> ((`gilt Outhaedi • Raaavel
324011
>Ins leading( Whorl Bmmgllagk Inbasdi• lava-hie ICed
524146
Man Lading Cad brake Aseeentayakitla kdaludi D ImMuun
324223
Vaal Spail Tiandhsees Multi hied)- Renaud/ laullalon
324234
Vaal Spail Tiandhsees iRple Outbounl)• Removal/ laaallaion
Nhan Lading Gras Sedtbr•ge
• RtmCnaliing4IIMX.
3:51030
Ilais Whorl Aneably lRitO Inbourib• Remove, tbaallaion
324012
She. lasting Caw Whorl Busing Oagk Oittersoli•lespcvuoatebak
324036
Mem Wheel Av•orkly 'Right drily: m.0 • Rertired I kr/aliases
324147
Ilea. Lading Oat Brute Atienadh Multi Outkunti • D litspouon
322003
Nese LaaiNag Gear Capeants• Detailed Camels. Impettlan
321235
Nose Landing Oa Stock Sind kW Axle Autubly CIC ADPIKOKa
321256
Nose Lasing Goa MOWS A./sully ('IC Appligbiros
321259
Nose Lahti/ Gus Tease War AucenNy ('IC Applgs41011
321203
Novo Landing Gee liner Truman Ana h Pea (IC ACTliediss
321263
Nose Laidinr Gra I' pro Dug hove Allah Pis CC Apple:awn
321264
Nose Laidine Ore Sakti Amu (IC Anliorhos
!212t) Nat LasWini Cc.: CM RtafPheaKa
322034
Nose LseiJita Ore • baba:anon
3222CC
Nose Ladd/ Gees Slack Suet- &Moog
323903
Undies Gan'- Ewan-eat Tot
324101
Nay Mud AssemblyIWO • Rmm'all 1114.1120M
324007
NoseVan:1 Bewails:ado • Inaeoliont Pak
32404
None 0101 Assembly (Recta • Removal / Insialdecu
MOW
Nose Volicyl Bannpullbgluel Inspecuen/ Pack
325033
Song • Saichaul Toe
EFTA00615076
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Phone Numbers
Document Details
| Filename | EFTA00615063.pdf |
| File Size | 952.7 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 40,584 characters |
| Indexed | 2026-02-11T23:05:13.232505 |