October 22, 2015
Daphne Wallace, Executive Assistant
Southern Financial Trust
Via E-mail:
RE:
JAREDIAN INVOICE NO. 15-001.4
Dear Daphne,
I was extremely disappointed with your email this morning regarding Mr. Epstein's refusal to pay Jaredian's
invoice no. 15-O01.4, dated September 22, 2015 for the Generator, R.O. & Maintenance Buildings. I am
perplexed even more by the reason; that we promised him the garage over the R.O. and Generator Buildings
could be completed by the end of September. Even if that were so, the Jaredian Design Group are not
Contractors and have no control over the construction schedule of a Contractor. Nor do we have control
over the multitude of design changes Mr. Epstein has required before a plan could be agreed upon.
Furthermore, a design or construction schedule is not referenced in either of Jaredian's proposals of January
16 and February 23, 2015. We did send recommendations on how to accelerate the construction schedule to
Mr. Epstein on June 26, 2015 that went unanswered.
The truth is, the buildings to be built over the Generator and R.O. Buildings could have been completed by
the end of September if a decision on the manufacturer of the pre-engineered structure hod been made in
April, when we first sent preliminary quotes on the structures from Buck Steel. However, Mr. Epstein decided to
have the structure bid out to three bidders instead. To date, no decision has been made by your side. That is
what has held up construction on the site, not the Jaredian Design Group.
The Jaredian Design Group has performed exceptional services for Little Saint James (LSJ) from the beginning,
particularly as it relates to permit requests to the Division of Coastal Zone Management (CZM). In 2014, we
applied for, and received, a Minor Permit for the paving of all of the roadways on LSJ. You will recall that CZM
initially wanted LSJ to apply for a Major Permit, which would have required a public hearing. Then, on May 5,
2015, we were able to successfully negotiate a Permit Modification for the Generator & R.O. Buildings, and a
Minor Permit for the Maintenance Building with CZM. This was not a small feat as Director J.P. Oriol initially felt
the Maintenance Building should have been a Major Permit. The change of heart in the issuing of Minor
Permits for the roadways and Maintenance Building was based upon how CZM regards the integrity of the
Jaredian Design Group on the projects they have done in the First Tier for the past twenty years.
The permit modification for the Generator & R.O. Building additions was always the low hanging fruit for this
project. The Modification has been approved since June, but LSJ elected not to start by not selecting a pre-
engineered building manufacturer, and Mr. Epstein's desire to start the Maintenance Building first. The CZM
Permit for that building could not be done in less than two months. We did not get a sign off on the building
from LSJ until the end of July, so the earliest it could start was the end of September.
If you look at Jaredian's proposals of January 16 and February 23, 2015 you will note the design services refer
to one rep acement structure, not three. However, it became apparent to me that Mr. Epstein expected
1 I Daphne Wallace October 22, 2015
EFTA00619797
three structures to be built, not one. We evaluated our proposal and absorbed the loss of fees because we
felt it was important to continue building a long term relationship with LSJ. The Joredian Design Group is a
small firm working in a depressed construction market. The processing of this invoice is very important to our
financial picture. There will still be a balance of $4,500.00 in the design portion of the fee even after the
invoice is paid. This should cover any minor changes from the incorporation of the structural drawings into the
sets.
Should you hove any questions or comments, please feel free to call on me at 777-1600.
Very truly yours,
JAREDIAN DESIGN GROUP
J
Woods, AIA, NCARB
Princ ••I
Cc:
Leroy V. Smith, PE
2 1
Daphne Wallace October 22, 2015
EFTA00619798
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA00619797.pdf |
| File Size | 237.7 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 4,195 characters |
| Indexed | 2026-02-11T23:06:50.185521 |