Back to Results

EFTA00622171.pdf

Source: DOJ_DS9  •  Size: 237.6 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

NES LLC 1 Generator Service - parts ordered - end of march 2017 completion 2 Door Finger scanner - jee wants 12inch x 12inch (per sawyers most are designed to go into wood not concrete) JEE to meet Sawyers at 71st week of 3/13 3 Security System - bid by Security 101 negotiated to 73,333 additional costs carpet / paint / carpentar - estimated 14,000 -> total project cost 87,333 (june 15-30 completion) JEE to meet with Vilinsted to pick desk colors at 71st week of 3113 4 ADT BurglarAlarrn System - need to obtain 3 bids (ADT, Sawyers & Secrurity 101) 5 Phone System - last inquiry end of 2016 JEE said pass 6 Fix Statute / Dresser in Hallway & Armoire in Master - restorer back in NYC March 16th -> end of March 2017 completion 7 Bentley - May 2017 arrival -> balance due = 240k plus tax (425 cost less 135 Mercedes Trade + 50 deposit) 8 Pinto -> march 22nd they will begin taking out carpet in DR -> then begin painting 100k euro paid 1/4/2017 and 300k euro paid 3/6/2017 need final terms: construction proposal was 868,500 euro and decoration proposal (DR, Massage&Mlsc 100K) 649,850 euro 9 Kitchen Floor? 10 Massage room bathroom? 11 Staffing 12 Francis Derby 13 Basement Batteries (kicks in before generator fires up) - need to be replaced - 14,400 bid 14 Christies - selling desk - auction date april 28th (exceptional sale) 15 Replace Molded Pane Glass windows - Gym (2) & Master bath shower (1) 16 Steam clean all rugs - 6th floor done / 5th floor - done by stanley / 4th floor (only 1 bedroom done - shampoo and steam) 17 Curtains throughout the house - dryclean or replace per Dwayne (Jon C butler) 18 Mervin to take Firesafety course 19 Gym - program 3-4 remotes into universal remote if possible 20N Flooring - replace carpet with flooring - cost 10k 21 Railing off 4th floor guest bedroom needs paint as it is rusting Per John Christenson list 22 Replace broken venetian blinds in 6th floor kitchen 23 Continue to change halogen and incandescent light bulbs whereever possible to LED 24 Ion paint walls in back stairway 25 Finish cleaning exterior glass of skylihgt with muriatic acid and 000 steel wool 26 Shorten lamp wires in LIR / organize 27 Cleanup wires In oval office 28 Organize all storage rooms per Artwork / Furniture /Antiques / Equipment 29 Photograph and catalog storage items 30 Update House manuals to reflect current technology EFTA00622171

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Extracted Information

Dates

Document Details

Filename EFTA00622171.pdf
File Size 237.6 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 2,410 characters
Indexed 2026-02-11T23:07:32.245057
Ask the Files