EFTA00622339.pdf
PDF Source (No Download)
Extracted Text (OCR)
Main Compound Remodel #1009
Budget Adjustment
14 October 2010
Code
Description
Budget
Adjustment
Revised
06-100 Rough Carpentry
($6,000.00) I $104,000.00
$110,000.00
09-920 Painting
$5,000.00
$3.000.00
$8,000.00
12-310 Granite Countertops
$9,000.00 '
$6,000.00 I $3,000.00'
$121,000.00
$0.00
$121,000.00
Increase in Budget
Approved:
$0.00
o
g1,814 j
0/
EFTA00622339
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Document Details
| Filename | EFTA00622339.pdf |
| File Size | 90.1 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 391 characters |
| Indexed | 2026-02-11T23:07:34.769041 |