LSJ CONSTRUCTION
Subcontractor Payout
Project:
Existing Compound Renovation #1009
Trade:
Granite Countertops
Subcontractor Virgin Islands Granite & Marble
Insurance ex
Invoice #
Phase #
Requisition #01
12-310
Original Contract Sum:
Change Orders Submitted & Approved:
New Change Orders:
Tntal Wnrk enntrantarl
.......
August 2, 2010
Requisition #01
iration: Janua
O. 1900
$5,625.83
$0.00
$0.00
(t
YES
X
NO
Approved by: Gary
Signed:
Date: August 2, 2010
Approved by:
Signed:
Date:
- 0-A-Lb-C•AJ
LE, 04 U,
I.nlyeAtW
%
A),
' A
JVYV
-P
76.7 44-4:41-°4
7.
91A,Let-:-GC„2-1/
7P -7.-
I
NO
1.
Submitted Bill
Signed:
Date: Atigust77,- 1)-;•.Q
Approved by. Emad
Signed
Date:
rIN) ba .
T
g
P -CdyCLVIS
oft c,!
0.4-C
EFTA00622502
LSJ CONSTRUCTION
Project Existing Compound Renovation 01009
Superior - lull legal name: Virgin Islands Granite a Marble
Phase # 12-310
Trade. Granite Countertops
Invoice #: Re uisttion #01
Data Revised
August 2. 2010
Insurance expiration,
Payment
Partial
Final
X
Invoice/Req4
Date
CIO
Amount
Retainage
Due
Paid
Data Paid Chad*
Balance
Contract Amount
08/02110
5,626.83
CO#1
CO•2
COM
COM
CO$5
Requisition 10
08/02/10 Deposit
92
000
Z812 92
2,812.92
Requisition #2
Delivery
0.00
[
2812
Requisition #3
Completion
0.00
Requisition 44
0.00
2.812.921
Total
I
2.81222
0.001
2.812.92
0.00
Contract Amount • Phase
Contract
C002
CO3
CO44
con
Granite Countertops
5.82883
Desaiption
Description
Desustun
DefteriPbOn
Desagition
Contracted To Date
Balance ol Contract virRetainage
5.825.83
2,812.91
EFTA00622503
VIRGIN ISLANDS
GRANITE
&MARBLE
ESTIMATE
3 Vanities & Top
ST. THOMAS. VI 00802
DATE:
7/20/2010
CUSTOMER NAME
CUSTOMER ADDRESS
Bill Rowles
tilde St lames
MATERIAL SELECTED
DaVinci
InIBM
MATERIALTHICKNESS
1 cm
EDGE DETAIL
HalloMost
DACKSPIASII MATERIAL. N/A
MATERIAL REQUIRED
RACK SPIASII SF
VESSEL SINK CUT GUT /I
DROP-IN SINK CUT OUTS
28.88 SF
132,70 S/SF
S
3,832.38
0.00 IF
44.23 S/LF
S
FA
50.00 S/PA
S
EA
75.00 S/EA
S
UNDERMOUNT SINK CUT OUTS
3 EA
200.00 S/EA
5
600.00
COOK TOP //
EA
100.00 S/VA
$
CHEMCORE (11-933 SINKS
3 EA
110.00 S/EA
5
330.00
EDGE DETAIL LE
24.67 II'
35.00 S/LE
S
863.45
ST JOHN DELIVERY
EA
450.00 5/EA
S
PROJECT TOTAL - FABRICATED AND INSTALLED $
5,625.83
LESS 50% DEPOSIT REQUIRED
$
2.81192
LESS 30% PRIOR TO DELIVERY
$
1,687.75
BALANCE DUE AT COMPLETION
$
1,125,16
PHON
FAX
6200 ESTATE FRYDEND01, SUITE I
DEPOSIT CHECK ti
7120,2010 12:13 PM EsIlmalo R0.14)8
EFTA00622504
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA00622502.pdf |
| File Size | 342.2 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 2,611 characters |
| Indexed | 2026-02-11T23:07:39.834666 |