Attached for payment Virgin Island Granite & Marble Req :3 in the amount of $2,550.07. Project 1009 Code 12-310.
Monique
1
EFTA00622509
LSJ CONSTRUCTION
Subcontractor Payout
Project:
Existing Compound Renovation #1009
Trade:
Granite Countertops
Subcontractor Virgin Islands Granite & Marble
Insurance ex iration:
Invoice #
Phase #
Requisition #03
12-310
Original Contract Sum:
Change Orders Submitted & Approved:
New Change Orders:
Total Work Contracted to Date:
Total Work Completed to Date:
Less Retainage:
Total Payments Made to Date:
Total Current Payment Due:
Balance to Finish including Retainage:
Sales Tax Liability:
November 1, 2010
Requisition #03
S8 421.75
$0.00
$14 047.58
82%
$11
a. Subcontractor/Supplier is liable, explaii
install only / tax
included in contract
b. Non-resident Subcontractor/Supplier Bond Applicable:
c. Use Tax to be paid by our company:
d. Shipping
Total Outlays for this contract incl. Sales or Use Tax:
497.51
$0.00
$8 947.44
$21550.07
$2,00.07
None
JEE approval attached
YES
NO
X
Submitted Bill
014
Signed:
Date: November 1, 2010
Approved by: Emad
Signed:
Date
Invoice Attached
YES
NO
X
Approved by: Gary
Signed.
Date: November 1. 2010
Approved by:
Signed
Date
497.51
EFTA00622510
Si
I
CON5tRUCTION
Protect Ems ye, CoMbOund Renovaiscn at(t
Supplier • full toga' name Virgin Islands Crone. 8 Marble
Mine N 123'-0
Trade Granite GOG01€410114
41,44:040
Requrstc., 003
Date Revered
November 1 201C,
hairline. expiration
Payment
Partial
Finai
X
invoicerReila
Cate
Cr0
Amount
Reta rage
Due
Paid
1 0 Paul Oleos*
Balance J
Contract Amount
08O2/10
5 625 83
COr1
Additional Countiinop
X 321 61
CO, 2
1D29.10
Repace Vanity Tops LIE)
5 100 14
COa3
C004
CO.5
-a-
Requisition at
08.02/10 Deposit
2 812 92
099
2.812 92
0.00
Requisition 22
17930, 10 Balance
6 134 52
g DO
6,134 52
000
Requisition #3
I No% 1C Deposit 12
2.35007
2,55007
2.55007
Requisition at
000
total
11 497 51 1
000
1, 4975'
8.94744
I
2550 07
Contract Amount . Prase
Contract
Granite Countunops
5.625 83
CO•1
Addebnnal opunlefiflps
1 :321 €1 Desecrs000
C0012
Replace Vann./ Tops WE]
5 toe 14 Dem.- Doom
CO1O
Deiscnption
CØ
Desorption
CONS
DEISCP€41011
Contracted To Dale
14.047 58
Balance of Contract wabetairtege
2 550 07
EFTA00622511
VIRGIN ISLANDS
GRANITE
&MARBLE
EST 1,11 VTE
DAD
Nlosll R \NMI
CI -SD/511H 'WON' S%
MA II RINI Al 1 1-C111)
Plxl DI All
Vanities
/o Tops
1029 3010
Hill How k.
IAA: u lanic.
Nalwary While
i =Malt
PI N
X
6200 ESInIt RYDENIKU. St:III I
TILAMAS. VI 00302
al
MA I
REQUIRLD
BACK SPI ASH SC
SINK 117 Ul rf e
DROP-IN SINK VIII CH O/
INDI-RMOI 9/I I SINK CI I (N;1 /.
COOK [OP •
CHCMCOKI: 1 11-933 SINKS
DFIAII I I-
SI )1/11N 1)1.1 IVIltl"
LESS 50% DEPOSIT REQUIRED
I.ESS 30% PRIOR TO DELIVERY
BALANCE DUE AT COMPLETION
DEPOSIT CHECK 4
lb I? NI
0 00 1.1
IA
IA
1 I A
IA
3 I A
19 9?
IN
NI All RIAI
NN
DA( KAPIAMI MAIL/0AI
165.50 1.5E
4309 51 I
5015) 3,,EA
75110 STA
20000 5 I A
10000 51-A
11000 S1 :A
7S NI 51.1
450110 5I A
3 cm
2.676.14
S
5
S
S
S
5
330.00
S
1.44/00
S
•
60000
PROJECT TOTAL - FABRICATED AND INSTALL I) 5
5.100.14
5
2.550.07
$
1.530 04
5
1.020.03
v179;7010 100
F twat fiwwiss Sliwory
w 9mm~
no top
EFTA00622512
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA00622509.pdf |
| File Size | 412.4 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 3,563 characters |
| Indexed | 2026-02-11T23:07:39.904433 |