EFTA00622546.pdf
PDF Source (No Download)
Extracted Text (OCR)
SCOTT GRAF
6501 Red Hook Plaza. Suite 201
St. Thomas, USVI 00802
February 12, 2010
TO:
Little St. amen
ATTN:
RE:
Bill Rowl
Monique Harry
IIIIIIII
Steve Capplinger
Installation of irrigation sleeving and piping at bypass road
Repine damaged cable and piping at helo road
By ass rod
In t
n
o projects (construction)
TIME:
51200.00
A total for labor performed and completed with 2 men @5400 per day for 2/3, 2/10 and 2/11
200.00
A total for labor performed and completed with 1 man @5200 per day for 2/9
2/3
12 men
; Remove pipe where trackhoe dug up at proposed foundation. We located pipe ends
under roadway and flushed dirt and capped off at roadside. We lowered r conduit for
Lynne mid road.
2/9/10
1 man
2/10/10
2/11/10
2 men
2 men
Jules dug out up shelf of rock and soil above cistern pit and the damaged 85" of 1.5
pipe and direct burial cable. He also damaged 120' of 1.5" pipe and direct burial cable.
He also damaged 120' of 1.5" water main and conduit for irrigation control cable.
I isolated all damaged piping and started to run a repair trench away from demo area.
He also repiped irritation main to get helo turf operable.
My helper and I continued to repair all 1.5" main line pipe at upper shelf. We also
extended (2) sleeves where wall was demoed at by pass. We replaced ' of 4" and 5' of
3" sleeve damaged by lowering apron.
Reconnected existing hose babe at cistern pit where main pipe was damaged at
roadside helo. Spliced replacement cable at pull box. Connected 1.5 at existing pipe
; line and pressure tested. Back filled and marked with warning tape.
TOTAL FOR THIS INVOICE - $.1.400.00
10
poi.- y0O
n+f
EFTA00622546
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details