LSJ CONSTRUCTION
Subcontractor Payout
Project:
Mechanical Desal
Trade:
Concrete Formwork
Subcontractor Big Bear Construction, Inc.
Invoice #
Phase #
Requisition #01
03-120
Original Contract Sum:
Change Orders Submitted & Approved:
New Change Orders:
Total Work Contracted to Date:
Total Work Completed to Date:
Less Retainage:
Total Payments Made to Date:
Total Current Payment Due:
Balance to Finish including Retainage:
Sales Tax Liability:
a. Subcontractor/Supplier is liable, explaii
install only / tax
included in contract
b. Non-resident Subcontractor/Supplier Bond Applicable:
c. Use Tax to be paid by our company:
d. Shipping
Total Outlays for this contract incl. Sales or Use Tax:
March 31, 2010
Requisition #01
Insurance ex iration: March 1, 2011
$821,461.00
$0.00
$0.00
$821,461.00
,/ 9%
$74,400.00
$3,720.00
$0.00
I
$70,680.00
$750,781.00
None
JEE approval attached
YES
NO
Submitted Bill
Signed:
Date: April 6,2010
$74,400.00
Invoice Attached
YES
NO
Approved by:
Signed:
Date:
EFTA00622582
LSJ CONSTRUCTION
Protect Mechanical Desal
ubcontracior - lull legal name: tlo Bear Construction. Inc.
Phase # 03-120
Trade: Concrete Formwork
Invoice P. Requisition #01
Insurance expirati0n: 1-Mar.i1
Payment
Patti&
Final
X
Date
C/0
AmouM
FialaInane
Due
Paid
Date Paid Cheek*
Balance
'
Invoice/Reg/1
Contract Amount
03/11/10
821 461 00
CDs, i
C0a2
COW)
costa
cows
Requisition 61
Requisilion #2
03/31/10
74.400.00
3.720,00
70.600.00
70,880.00
0.00
-
0.00
Requisition #3
0.00
-
0,00
Requisition #4
0.00
-
0.00
Requisition #5
0.00
-
Requisition #8
0.00
-
Requisition #7
0.00
-
Requisition #8
0.00
-
Requisition #9
0.00
-
70,680.00J
Total
74.400.00
3.72600
70,680.00 I
0.00
Dale Revised March 31. 2010
Contract Amount - Phase
Contrail
COO
COQ
COQ
COP4
CO#5
Concrete Formwork
821.461.00
Description
Description
Description
Description
Description
Contracted To Data
Balance of Contract wiRetainage
821.461.00
750.78180
EFTA00622583
APPLICATION AND CERTIFICATION FOR PAYMENT
AM DOCUMENT G702
'0 0~
IAA LAC
~CT ~nu
Car Racs: 61,0
MOUCATICY.0
1
Oa'eaelle
~fled ~W.I.
St Ron. LIS.
AmOcebcoOso
3CM/20I0
Pow An
3.01,2010
'ROY cconvc:ort
0.
~a
, war.
Censor MS'
Ot"00 TO
30123010
SO» EA. Enos ow»
St Fo.v04 moo
MORCTJ
11010
CONOTACTORI MINX AMON FOR PAYMENT
nopcaton
Ice Term se men ten
e roam
sel ere Cenract
Canaan Pen AM ?bons
$T33. It ~MI
no ~mom
'ammo.
someomre WI Po Am mono IT laANblab
fysim Mt Inn
conne• ~nos .7" et Cons Owns tel tI *Awe nosy
ey
the Coons Yon. a.» N.An.CNhela Mona •••• woo Aro
~a
worm lyr• so OwI. arc OM win I./o. ~Anon
se. we
1. ORIG... CONTRACT Sum
1025.40.00
CONTRACTOR:
2. Noterier ey Cant Orders
$000
3. CONTRACT SUN TO OATt One I a 21
021.M100
0y.
5.9 Bow Om notion NC
3 3 / /23*
a. TOTAL CCUREnOB STORED TO
an ICoMeCt on 0703)
S. OPTAINASE:
574.0000
git
a.
$
1441Conlebei WI» IMS YOOTIMOn
52.12000
tilested we saris Wow re In
ICAO. 0 otolOTTOI
Nany Rat
P.
5 00% %of Seennumnal
SOCO
AO, CeArea.
ICmw.P OMPOS)
Tom Rorer
aim 5a • Pro
CERTIFICATE FOR Vann NT
Tot. r. CM"' OP ONO)
13.:2000
6 TOTAL EARNED LESS RETAINAGE
tATO I 14.1 la 5 TO.)
7. ASS eREnOUS CERTFCATES FOR
FunIENT on 6 ~Me
Cenromol
5. CURRENT PAYMENT OUE
S. &MSC« TO lira
ISUUDINS SCUM«
Om 3 Ins Wei/
ST042000
•CCOVIMP
TO WW1. DPI'S
NW *I (SW .040.4101.0 NI VII OW COIT~I. ell 100~
nw
Ynar cm*
0...0 Nil le *a Mille I.* CIONVpIr.srwYN, rinonwas ant WM %Ws. vs ~We as~.
07.9 *sax Yew"
$10240.00
~so,
ware Cana Om".
r. :memo mans o ~riot
To 0.1.0UN't a:tent,
3750151m
CIVOCEOROERSuliMART
*OPTIONS
OEDUCTIPIS
Ime miser atom«
1•13FIN01.4 ~ens by Con
MAO
$0.00
To*: ~Is« I. Ms.
SOCO
WOO
TOTALS
SOCO
000
NET CITATCES by Omp Or or
SOC.
AMOUNT CERTIFIED
STO.P2.03
'And% Caltreay sift ~led Can Om Ye ammo sm.. nisi'
*as cns Am1N,T aro R
Cyanate Swig OM at* et
10 cairn le "oatmeal Wall
Confirm
one: 00
0
ane
MlelaaM ISA...1 CIA tO ILD • Onsh• atom
ren Mae. sermons tommact
~weal ~a
is 'iv aJ9 a b Chref Crain= ~Ilia Cot
Ay ~be
te7 "..C.anOWID area IION ICA IAVIIIM IWCCeCUMMA OitIO
Tot AACTOC. mar not or ~WWI&
in5 its vom AvE.
valsea3fOrt Cc 2031.5201
Inn MyatOin ~O.
O. ROT 6.6.6. 1 PY.....16, a cc4.1.10 MA 00.01.110661 - Gentian». of Denmenrs Aontrome eon Se Unmet
Summary Sheet I of 1
EFTA00622584
CONTINUATION SHEET
ALA DOCUMENT G703
ALA Document G702. APPLCATION ANO CERTIFICATION FOR PATIENT. contaning
APPUCATION NO:
1
Contractors stoned cendlcabon is attacked.
APPLICATION DATE:
03/31/10
In tabotaucns below. Amounts are stated to Me nearest Coax.
PERIOD TO:
03/31/10
Use Column I on CoranICIS velem variable retainable for Ins items mayloos
A
B
C
D
E
F
G
H
I
frEu
NO
DESCRIPTION
OF WORK
SCHEDULED
VALVE
wORKCOLcLETE0
PAATERTALS
PRESENTLY
STORED
tNOT ei 0 I El
DORE)
TOTAL
CONPLETE0
MID STORED
TO DATE
0214E4f I
%
(3 4C)
BALANCE
TO Fenn
(C - G)
REIA24AGE
(IF vAluABLE
RATE)
FROM PREnnOuS
APPLICATION
ID • E1
THIS
PER/00
00001
&Axing Real
568.350.00
50.00
50.00
$000
50.00
0.00%
$65.350.00
0.00
00002
T43 and Masao/es
526.503.00
$0 .00
$20.000.00
$0 00
120.000.00
70.18%
S8.500 03
100000
0003
Funs Reuel
$23.500.00
$0.00
$23.500.00
$0.00
$23.500.00
100.00%
WM
1175.00
00004
Insurance
58.500.00
$0.00
58.500.00
5000
58.500.00
100.00%
$0 .00
425.00
00005
FreibM
$19.500.00
$0.00
$10.003.00
$0.00
$10.000.00
51.28%
59.50000
500.00
00006
Forming Materials
55.000.00
5000
50.00
$0.00
50.00
0.00%
$5.000.00
0.00
00007
Misc. Materials
510.003.00
50 00
$0.00
$0.00
$0.00
0.00%
510.00000
3.00
00008
!Asc. See Work
$30.750.00
$0.00
$0.00
$0.00
50.00
0.00%
530.75000
3.00
00009
Base Slab Rem
$16.703.00
$0 00
$0.00
$0 .00
50.00
0.00%
516.700 00
3.00
000'0
Base Sab Reinforc.ng
$34.800.00
50.00
$0.00
$0.00
50.00
0.00%
534.800.00
0.00
00011
Base Stab Pour
$5.050.00
$000
$0.00
$0 .00
$0.00
0.00%
55.95000
3.00
OCC12
Base' ars Form
556.300.00
$0.00
50.03
$0.00
$0.00
0.00%
556.300.00
3.00
00313
Base Wa Is Reinforcing
$32.700.00
50.00
$0.00
30.00
$0.00
0.00%
532.700,00
3.00
00314
Base Wens Pour
56.300.00
50.00
50.00
50 .00
50.00
0.00%
56.300,00
3.00
00015
1s1 Elevated Slab Form
541.950.00
$0.00
$0.00
$0 .00
50.00
0.00%
$41.950.00
0.00
00016
1st Elevated Slab Re nforong
S37.250,00
50 00
50.00
$0 .00
50.00
0.00%
537.250 00
0.00
00017
1st Elevated Slab Pov
58.403.00
50.00
50.00
$0.00
$0.00
0.00%
58.400.00
0.00
00018
1st Fl. Walls Form
$79000.00
$000
$0.00
$0.00
$0.00
0.00%
579,000 00
0.00
00019
ist Ft Wass Reinforcing
541.700.00
50.00
$0.00
$0.00
$0.00
0.00%
541.700 00
0.00
00320
1st P. Walls Pour
55.003.00
$0 00
$0.00
50.00
$0.00
0.00%
$5 600 00
0.00
00021
Roof Dab Form
$$4.650.00
50.00
50.00
50.00
50.00
0.00%
554.650.00
0.00
00022
Roof Stab Retreat;
$42.500.00
50.00
$000
50.00
$0.00
0.00%
$42.500.00
0.00
00023
Roof Slab Pod
59.100.00
50.00
50.00
50.00
$0.00
0.00%
59.100.00
0.00
00024
Parent WO Form
$11.450.00
$0.00
50.00
$0.00
$0.00
0.00%
$11.450.00
0.00
00025
Parapet WO Reinforcing
52.800.00
50.00
$0 00
$0 .00
$0.00
0.00%
52.800.00
0.00
00326
Parapet Wail Pouf
53.300.00
$0.00
$0.30
50.00
$0.00
0.00%
53.300.00
0.00
00027
Omthead
$,34.228.00
$0.00
$3.10000
50 00
$3.100.00
9.06%
$31.12800
155.00
00328
Profit
$102.683.00
50,00
59.300.00
50.00
59.300.00
9.06%
593.383.00
465.00
00029
$0.00
$0.00
$0 00
$0.00
ION/0'
$0.00
0.00
00030
50.00
$0.00
$0.00
50.00
sON/0'
$0.00
0.0C
0003'
$0.00
$0.00
$0 00
$0.00
ION/0'
$0.00
0.0C
00032
50.00
$0.00
$0 00
$0.00
IONIC'
50.00
0.0C
00033
50.00
50.00
$0.00
$0.00
BON/C'
50.00
0.00
00034
$0.00
$0 .03
$0 00
$0.00
'ON/0'
$3 00
000
GRAND TOTALS
$82146100
$0.00
$7440000
$0 00
$74.400.00
9.06%
$747.061.00
53.720.00
EFTA00622585
•
FROM : Scand I c Executive Services
PHONE NO.
340 693 7011
Mar. 25 2010 10:31AM PI
rvjf:;TERCHANTS
1
COMMERCIAL
BANK
Client's Name
Wiring Instructions
Wire to Nexit Bank
ABA
Credit to Merchants Commercial Bank
4608 Tutu Park Mall
St. Thomas, USVI
Account
Client's Account
Further Cred' To:
/coo v&o#
_ .
Wire Transfer Cutoff Times:
Incoming
4:00 PM AST
Outgoing
3:30 PM AST..
Incoming wires received after 4:00 pm AST will be held for next business
day processing.
4608 Tom Park Mall St Thomas VI 00802-1735 / T:
IF:
/ Website: wwwambvi.com
EFTA00622586
Emad Hanna
From:
Monique Harry [moniqueharry
Sent:
Monday, April 12, 2010 3:28 PM
To:
Emad Hanna
Subject:
BBC Req 1
Attachments:
BBC Req 1.pdf
Emad,
Attached for payment Big Bear Construction, Inc Req #1 in the amount of $70,680.00. Project Mechanical
Desal Code 03-120.
Monique
Hotmail: Trusted email with Microsoft's powerful SPAM protection. Sion up now.
EFTA00622587
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Dates
Phone Numbers
Document Details
| Filename | EFTA00622582.pdf |
| File Size | 940.5 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 9,089 characters |
| Indexed | 2026-02-11T23:07:40.661921 |