Emad Hanna
From:
Jeffrey Epstein
Sent:
Tuesday, July 27, 2010 2:22 PM
To:
Emad Hanna
Subject:
Re: LSJ Wire
ok
On Tue, Jul 27, 2010 at 7:14 PM, Emad Hanna <
Jeffrey,
6. wrote:
Gary submitted a payment request in the amount of $ 68,423.75 for Big Bear Construction for the mechanical
desal.
Its within the underline budget of this project.
Please provide approval to wire the funds since the amount is above our threshold.
Thank you
Emad Hanna
Project Controller
HBRK Associates
PO Box 400
New York, NY 10150
Ph
Fax
EFTA00622597
LSJ CONSTRUCTION
Subcontractor Payout
Project:
Mechanical Desal
July 21, 2010
Trade:
Concrete Formwork
Requisition #04
Insurance ex 'ration: March 1.2011
Subcontractor Big Bear Construction, Inc.
Invoice #
Phase #
Requisition #04
03-120
Original Contract Sum:
Change Orders Submitted & Approved:
New Change Orders:
Total Work Contracted to Date:
Total Work Completed to Date:
Less Retainage:
Total Payments Made to Date:
Total Current Payment Due:
Balance to Finish including Retainage:
Sales Tax Liability:
a. Subcontractor/Supplier is liable, explaii
38%
install only / tax
included in contract
b. Non-resident Subcontractor/Supplier Bond Applicable:
c. Use Tax to be paid by our company:
d. Shipping
$821,461.00
$4,835.00
$0.00
$826,296.00
$311,600.00
$15,580.00
$227,596.25 Z
$68,423.75
$530,276.00
None
Total Outlays for this contract incl. Sales or Use Tax:
JEE approval attached
YES
NO
X
Submitted Bill
Signed:
Date: July 22.2010
Approved by: E ad
Signe
Dat
7) -7)10
6
$311.600.00
Invoice Attached
YES
NO
X
Approved by: Ga
Signed:
Date: July 22. 2010
Approved by:
Signed:
Date:
EFTA00622598
LSJ CONSTRUCTION
Project Mechanical Desal
uticoitiraclor kill legal name: Big Bear Construction. Inc
Phase N 03.120
Trade: Concrele Formwork
Invoice 8: Requaition 804
insurance expiration: l.Mer-t 1
Payment
Penal
Final
X
EInvoicalReq#
Date
C/O
Arnotlnl
Retanage
Due
Paid
Dale Pald Chedt8
Balance I
IContrad ArnOunl
03/11/10
021.46100
CO#1
C002
C013
CO#4
CONS
07712/10
4.83500
RequIsibon Mt
03/31/10
74.400130
3.720.00
70,680.00
70.68000 ../;••
0.00
Requisition #2
04/30/10
44.475 00
2.22175
42.251.25
42.25125 '/2
00
Requisition 03
05/31/10
120.70000
103510
114105.00
114.615 00
:,
0
0.00
Requisition #4
06131/10
71025.00
3,601.25
60.423.75
68,423.75
Requisition 85
0.00
-
Requisition l
0.00
•
Requisiton la
000
•
Requisition #8
0.00
-
Req2iaition 09
000
•
68,423.751
TOUT
_
311.60100
15180.00
296,020.00
227.503.25
Dale Revised
July 21 2010
Contract Amount - Phase
Contract
CO#1
CO#2
COO
0084
toss
Concrete Formwork
821.461.00
Trench suntan
4.835.00 Descnolien
DesCnaion
Description
Desorption
Description
Contra:NO lo Date
Balance <A Contact wiTietainage
82629600
530276.00
EFTA00622599
APPLICATION AND CERTIFICATION FOR PAYMENT
ALA DOCUMENT 6702
00~13
tW TLC
~0~~
0~ 03
0 flaw WVI
~XS' vaORiOabnrp.lOrC
1.00U01110,4NO
Atittlal.3•1.
0002
Ony Sop
612010
.A.-c~
3~3100sTILACIOR
Seance- ~~
00
Cownsw
09,40 T9
GOO 2V TO
1.1% 1~ to~ •%.8
2. ~ADA ow»
IlWicl•
ATOTO
CONTRAC TOWS APPLCATON TOR PAYMENT
~Amon.% mew IC NynI09 !)1CWr b~
coninee, asti h :CAC«.
I'M ~red
CCev
an 0. ~I It
bow I re CanoNN• inonnp•
ffornotwerd ~
M1 N/1 00~3 to wows:~ fo. No~›00 bar
Coio~
Sheet ALA Dooiren G703. G ~COW
~0~
~~~
3401% 0~0 ~wow inn 0 WWI% NW ••
• n.
CAA/
OrIrete
Won 3~0 few he OWTS ~ ~ ~in ~Woo
tow • fo~
1 ORONAL CONTRACT MAT
*TAW CO
CONTRACTOR:
1 NW &r00 OT OW00 OfOrs
$4.51503
3 EoNIRACT SUM TO OAT( cur I t TI
612 6110 03
Cy
Bo9 Boat Caw:futon INC
Otte
131/2010
• TOTAI.COLATATED ASTOREO TO
$31110500
DATE
itobrm C3 CA5 0 , 031
5 RETANAM
Awed
Wen Of
W% % CO C0~1010~3 OW VOtalial
ISM'? CO
}NVbIaYe...bMMn.M
40 a/
ramo Nfoc
IC06~ 0 f 13 03 Wow
503R % &Sawed Man
50 OC
kft 43~40,11~
ICaUm1T 030 TOW
70talR~19. 0.^85 53 'SO °I.
CERTIFICATE FOR PAYMENT
TOW 0 Col~ 10 WO%
$ IS 500 CO
TOTS: EARNED LESS REINNACE
Rne I tost LM 5 TA«
T LESS PR EFCOSCERTISCATES FOR
PARMAT Rat If MO% ~
COWCW)
I CURRENT PAYMENT CUE
9 oikspicE
00.95fri IRM:ANC RE TAIRAGG
4..9 3 9$1 UR 6)
5860x00
çav 3«,
KONDAK wer9 Rona ~on
ins In An,. ~snow* ~ ~403 ~~% ~owes
lyCseLLtaWLwaPv.14
0~ ~ N0.4
To Gtow~~~%~~
~ass
~
00~~
0~3i
W.:~ Woofer al bo.~
MAWS V Ter~~ atn
Ca!~ Downs a%
Cows~ • reco~ ~~
or re MACAW CWI MD)
1103 21% 03
GAIRCIE CRIDER SURMA.«
ADDITIONS
OEDUCTTONS
TOW:1~3000~
0 0~W ~WO W Co~
50 00
5000
TO anlei e,.. Item
WSW TO
50 00
r01.9.5
54 /13s00 I
S003
NET CHANGES to 0•11;01 orgy
541535 00
AMOUNT annneo
$63A23 T$
~~0~~
4 wain ~~4~
~
re orow ~Wows
sz rffue en ~ ~ 30~ ~ a.. Certnni on Straf~~ et
(MMP. *Pm scram awe."
Coottrucl
Mawr
BY:
CRI*2/2742
)
rA Webs YI
lie imp.ict Wine LO • Leo ••• OW lei. CaWacc•
'an non} ~not ~ ~~~
of
an 30,0 ~Oa 13 se• rowel Ow 03.3~~~
~
the Wow
AAOpp.VrrOr9 AnLKAMNAMbnIrrCAIiOYrONrvrNMI ~
(brow 43 n 992
Uflit My 0~
~1~00 Of OW 03~~0 by few 03110) 3 cO0WHC0AlA 00pOnfrot 0401 CT( VatiOn of Pmvsonrs
fawn the I. legnill•
0~~~~~1
03 Airs NcTs reb4WtO.lAVL.NW vaARANOION OC ~TM
SU Mil."' Stool I el I
EFTA00622600
CONTINUATION SHEET
MA DOCUMENT 6703
AR Oocu men, 6732. APPLEAT ION AND CERTIFICATION FOR PAYMENT. calamine
APPLICATION NO:
4
C0nVaCl0rS synod oceLlkalion is arachad
APPLICATION DATE.
0621/10
In labulaucos bebw. amounts an sated to the nearest 004r
PERIOD TO'
06730/10
Use Cooare I on contrws whoa ariobl0 magas. rcr see items may acoly
A
8
C
D
E
F
G
14
I
REM
NO
DEBoRpTiON
OF WORK
SCHEDULED
VALVE
WORK COMPTETE0
MATE WALS
PRESENTLY
STORED
(NOT IN 0 6 E1
OOREI
TOTAL
COMPLETED
AND STORED
TO GATE
(O•E•F)
•4
(G • C)
BALANCE
TO FINISH
cc • GT
NETAJNAGE
IF NAMABLE
RATE)
FROM PREM.*
APPLIcATON
ID • E1
TIPS
PERIOD
00001
S'Oring Reniai
$68.350.00
568.350 00
$0.00
50 00
568.35000
100.00%
50.00
3417 50
00032
Ties and Accessoses
526.500 00
$20000.00
$0.00
$0.00
$20.000.00
70.18%
58.500.00
1000 00
P DC°
Form Rental
523.500 00
523.560.00
50 .0
50 .00
$23.503.00
100.00%
$0.00
117500
00004
Inv-lance
58.500
58500.00
50.0
5000
$8500.00
100.00%
$0.00
42500
031305
Freta
$19.500
$15.000.00
$0 00
50.00
$15.0000
76.92%
54500.0
750 00
00006
Forming mater.ats
55.000.0
$1000.00
$530.00
SOW
51.56060
30.00%
53500.00
75.00
00007
Mac Materials
510.000
$1.0000
$1.000
$O 00
$2,000.00
2000%
$8.000.00
10.0
00006
Mac Site wont
530.750 00
$3.075.00
53.075.00
$0.00
$6.150.00
20.00%
524 600.03
307 90
00009
Bass Ws Form
51670000
$16 700 CO
500
$0 00
116.700 00
100.00%
50.00
83500
00010
Base Slab Reinforcing
$34.80000
534.80000
50.00
$0100
$34.800
100.00%
$0.00
174000
00011
Base Slab Poor
55.95000
55.9500
50.00
50.03
$5.950.00
100.00%
50.00
297.50
00012
Base Wags Form
556.300.00
55.630.00
$30.965.00
SO 03
$36.5950
$19.70500
:82975
65.00%
00013
Base Was Fichrtioreng
$32.700.03
53.2700
$17.965 .0
$0.00
$21.2550
65.00%
$11.44.5.00
1062.75
00014
Base Wags Pour
56.300
50.0
$2.100.00
$0.00
52.10000
33.33%
54.200.00
105.0
00015
1N Elevated Slab Form
$41.95003
$0.00
$0.00
$0.00
SO 00
0.00%
$419500
0.00
00016
1st Elevated Sias Reaforcorg
$37.250.60
$0.00
$000
$0.00
50 00
000%
$37,250.00
0.00
00017
1st Elevated Slab Pow
$8.400.03
$000
$0.0
$0 .0
$0 00
0.00%
58.400.0
00
00318
tat Fl. Walls Form
579.000 00
30 00
5000
$0.00
$0 00
0.00%
579.000.00
0.00
00019
1st Fl. Walls Reinksrcn9
5417000
50.60
$000
$0.00
SO 00
0.00%
$41.7000
o.oa
00000
151F; Wads Pput
55.6000
$O CO
$0.00
$0.03
500
0.00%
5$.600.00
0.00
00021
Roof Stab Form
$54.65000
$O 00
$0.00
50.00
5000
0.00%
554.65000
00
00022
Roof Stab Raab/tine
542.500.00
50.00
50.00
$0.00
$000
0 00%
542.50.0
0.00
00023
Rost Slab Pour
$9.100.00
$0.00
$0.00
$0.00
SO 00
0.00%
$9100.00
0 00
00024
Parapet Wall Form
511.450.00
$0.00
50.00
50.00
$000
0.00%
$11.450.0
0.00
00025
Parapet Wall Reinforcing
$280.0
50 .0
500
$000
3000
0 00%
$2.800.00
0.00
00026
Parapet Wall Pour
53.300.03
50.03
50.00
50.00
5000
0.00%
53.300.00
0.00
00027
Overhead
534.228.0
$8.200.00
$4.100.00
50.00
$12.300.00
35.94%
521.928.00
615.00
00028
Pak
$102.683.00
524.600.00
512.360.00
50.00
536.903.00
35.94%
$65.783.00
1845 00
00029
COa 1 Trench Sw000nNB Credit
14.835.00
$0.00
$0.00
$0.0
SO 00
0.00%
$4.835.00
000
00030
$0.00
50.00
50.00
50.0
IONS)!
50.00
0.00
00031
50.0
$0.0
$0.0
$0.0
4DMO!
50.00
0.00
00032
$0.00
$O 00
$0.00
$000
N0M)•
SO 00
0.00
GRAND TOTALS
5926 29600
$2395750
572.025 00
50.00
$311,600
3771%
$514.696.00
515.550.03
EFTA00622601
LSJ. LLC
CONTRACT CHANGE ORDER
PROJECT NO. 1010
Mechanical Budding Desal
CODE
AMOUNT
CC
To (Contractor) Big Bear Construction, Inc.
DATE
Name and Location of Project: LSJ - Mechanical Building Desal
CO No 01
Date 7/12/10 .1
THE CONTRACT IS CHANGED AS FOLLOWS:
PR and/or CCD #
(if applicable)
Description of Change
Change in
Contract Amount
03-120
03-120
03-120
Add trench support
Vapor Barrier Credit
Additional time - nine (9) days
Original Contract Amount
Net Change by Previous Change Ordeqs)
Total Contract Amount Prior to this Change Order
Net increase in Contract Amount this Change Order
Revised Contract Amount
$7,862.00
($3,027.00)
$ 0.00
$821,461.00
0
$821,461.00
$4,835.00
$826,296.00
The time provided for completion in the contract is increased by nine (9) days. The revised date of Substantial Completion,
therefore, is December 08. 2010. This document shall become an amendment to the contract and all provisions of the contract
will apply hereto.
This Change Order constitutes a complete and final resolution of all claims of the contractor for additional time or
additional compensation related to or affected by work that is the subject of this Change Order.
No Contract ' I be binding upon LSJ, LLC until signed by an authorized representative of LSJ LLC.
LSJ, LLC
Date
7/12/10
ACCEPTED BY
TRACTOR
Date
JUSTIFICATION FOR CHANGE:
Addition of trench support footings and columns by structural engineer and deletion of under slab vapor barrier.
Additional timo duo to LSJ equipment malfunction.
EFTA00622602
Emad Hanna
From:
Monique Harry
Sent:
Friday, July 23. 2010 1:29 PM
To:
Emad Hanna
Subject:
BBC Req 4
Attachments:
BBC Req 4.pdf
Emad,
Attached for payment via wire Big Bear Construction, Inc Req 4 in the amount of $68,423.75. Project
1010 Code 03-120.
Monique
Your E-mail and More On-the-GO. Get Windows Live Hotmail Free. Sian uo now.
1
EFTA00622603
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA00622597.pdf |
| File Size | 1074.4 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 10,844 characters |
| Indexed | 2026-02-11T23:07:41.025227 |