LSJ CONSTRUCTION
Subcontractor Payout
Project:
Mechanical Desal
October 26, 2010
Trade:
Concrete Formwork
Requisition #08
Subcontractor Big Bear Construction, Inc.
Insurance ex iration: March 1, 2011
Invoice #
Phase #
Requisition #08
03-120
Original Contract Sum:
Change Orders Submitted & Approved:
New Change Orders:
Total Work Contracted to Date:
Total Work Completed to Date:
Less Retainage:
Total Payments Made to Date:
Total Current Payment Due:
Balance to Finish including Retainage:
Sales Tax Liability:
Partial
X
Final
$821,461.00
$4,835.00
$0.00
$826,296.00/
80%
$661,065.00
a. Subcontractor/Supplier is liable, explaii
install only / tax
included in contract
b. Non-resident Subcontractor/Supplier Bond Applicable:
c. Use Tax to be paid by our company:
d. Shipping
Total Outlays for this contract incl. Sales or Use Tax:
I
$33,053.25
z .
$514,159.00 V
$113,852.75 v7.-
$198,284.25
None
JEE approval attached
YES
NO
Approved by: Emad
Signed:
Date:
l 0 P1
$661,065.00
Invoice Attached
YES
NO
X
Approved by: Gary
Signed:
Date: October 26, 2010
Approved by:
Signed:
Date:
EFTA00622604
LSJ CONSTRUCTION
Prcesct Mechanical Desai
iubcontraclor - full legal name. Big Bear Consouction, Inc
Phase # 03.120
Trade Concrete Formwork
Invoice N: Rpwsrlion 008
Insurance exprratIOn: 1
•11
Paymenl
Partial
Final
X
Invoice/Reg,
Date
,C70
Amount
Reinert
Due
Paid
Date Paid Check/
Balance
I
COMMet Amouni
03/11/10
821,461 03
COIN
CO2
CON3
COM
CONS
07/12/10
4,83500
Roquislbon #1
03/31/10
74.400 00
3,720 00
70,88000E
70,680.00
0.00
Requisition #2
04/30110
44,475 00
2.223 75
42,251 25
.i.
42,251.25
0.00
Requisition #3
05/31/10
120.700 00
6.635 00
114,665 00
...
114.66.5.00
000
Requisition #4
06/31/10
72.025 00
3,801 25
68 423 75qt,,
68.423.75
0.00
Requisition NS
07/21(10
57,325 00
2,866 25
54 458 7
54.458 75
000
Reparation N6
08/25/10
115,040.00
5.752 00
108,288.00
109.288.03
0.00
Requisition 47
09'24/10
57,255.00
2.862.75
54,39225
51,392 25
0.00
Requisition 48
10125110
119.845.00
5,99225
113,862 75
Requisiuon #9
0.00
Total
661»65.00
33,053.25
628,011.75
514,15900
113.852.75 I
Date Revised
October 26. 2010
Coreracl Amount • Phase
CCearad
COIN
CO42
CONS
COM
CONS
Concrete Femme&
821,461.00
Trench support
4.835.00 Descl19Iton
DOWN/lion
Description
Description
Description
Contracted To Date
Balance or Convect wiRetainage
826,296.00
198.284.25
EFTA00622605
APPLICATION AND CERTIFICATION FOR PAYMENT
MA DOCUMENT 6702
wue
Aat ICA NMINO
e
C`u4lmle
41,001•01~0TRA
ti ROM,. J6N d.0
Afek••• DS
Pretir[s
WY1/2310
=Wasp
CONT‘MC T OR
Sy bar CaSS14.
Ir31/23 10
=See
5:03 in*
bWol ~ER
Jam
COW
PROJECT •
01310
=Con"
~of
CONTRACTOWSAPPLCATON FOR PAYMENT
~non
rt. INK» to Darla
ShOat,
Yw
CroriKt00•4
on«,
tonsupwe Wiet 4A CocreNG7C3 1 OW«
1. ORGINAL CON FP.A.0 f SUM
2 14« EARN. IN One ONIers
3 CONTRACT SUM TO OAT it..
2.
• TOT.. CCAIRLETEC 65TCRE0 TO
5821 461 00
MAW 05
1.11 Rang•Ni ~lap
antes vEn ei• FIY d Y Catnettlesste
AMP W Ns« et Wen ~es N IY •MRenb ana•••••••••••
00.~
fee
.•••
~el
~RA OM,
all
•••••••
end
ea•
Now. re Ow
— Iel twm• Onnin !New Ism • re. Ode
CONTRACTOR:
By
Eeq Bow Onruson
0818
1025/20`
$82629001
lall • DM 05
OAT!
(CO"' O
GM)
5 RETANAGE
Mr co
Ca" of
a
5 00% 510recaolneallonisluetnzalen
ese emus
9.4.0./.1 *ad NO., » bdo. night
la, 40
(Coltem to •
ca 0703)
M1n, Pat
a.
5.o0í %or Wow Mont
50x0
1•17 Cnanesen
ICON" • 386703)
-RR ~We :- res 5a • WO.
CERTIFICATE FOR PAYMENT
Tow RCA"! R07031
53305225
8 701A. EARNE O LESS RE TMNAGL
5009 0•1 TO
Ilea 4 Lea Ins WWI
7. Less PfteV1OVS
Ittft
PAYMENT Rea 0 ire% we« Csolkaw
5514.15000
...combo. ~beaten
tau,"
0~
a• ea Ma ~Wen
And P•
WS••••••••••••••.•
1.• Comavn Wear or%
-eNY
Vey.,
$113,807$
Oa, Sui • r• Pin as P....Cones. ~OW
oc••••••
iod
re~
a•••••
Fr Coln« Canna. tea •• 0o~
• awl
.c n1••.d
go AMOUR (li ....
I. CURRENT PAYMENT DUE
9 IIALANCE TO FINS,. INCLUO•NO RETA 1/414E
5.98]46 2.5
Dr• 3 less Drat)
MEOW« CERTIFIED
5' 13 352 75
~WE ~II
Wu Ry
i
ADOITCNS
0E0J2T10•4
Togo chimps 11COYMC
e V•0:•,s ~ea
ry Omar
$4 035 00
50 CC
Wu apoeve0 tin urn
I
1
5000
5000
TOTALS
14 03600
50 05
NET CrLAA415 by Owe/ DroN
SI 03500
'maws. ~al!~
et •••.•~Ice
AN
or• Can neon memo no ..• f •
• wire
e•
weal ~me,
Conswõre
Br.
Dale:
...tna
n m• ~Mt
lhe AVEL•17 CI#TRFO • ~Ms ••• WSCarly
fend •••• Lisa
wow.. AM smiles,» a. to
"xen-er tdme •S Canal
AA (»O.M.HT
^KA
/tn.
COM*XaT)311 FOR P•OILM In I:, ToON Au O.W.7
Uses ney Alwyn nenal,a, of let; dOtAirMal by mowing a coneM•ana AN ~NeatDWI • Certrt.caboa oi Dec.Arne% AuRene:1y 00•••••• L.C49, YA
11.4 MAJNIC4% Mil NU OF ARO.
MVI YORK Ay!: FM VO~/
ON DC ~WIC
Sumrn.in iln,
l
EFTA00622606
CONTINUATION SHEET
MA DOCUMENT G703
ALA Document 0702. APPLICATION ANO CERTIFICATION FOR PAYMENT. containing
APPLICATION NO.
8
Conttactor's SOSIICI CellEcaten of attached.
APPLICATION DATE:
10.01/10
In tabutaborts below. aniOunIS are staled 10 one nearest dollar.
PERIOD TO:
10,11/10
Use Cok.mn I on Contracts wnere winabie retainage Sh. me items may apply
A
B
C
0
E
G
H
I
ITEM
NO
OF-SCRPTION
OF WORM
SEMEDULE0
VALUE
WORMCOMPLE TED
MAILRiALS
PRESENTLY
STORED
(NOT N 0 & E)
DORE)
TOTAL
COIATLETE0
ME STORED
TO GATE
M•r)
%
OTI • CI
BALANCE
TO MOH
IC • GI
RETANAOE
1W VASII.EllE
RMEI
FROM PREVIOUS
APPLICATION
ID•E)
THIS
PEROO
00001
Showy Ramat
$68.350.00
568.350.00
$0.00
$0.00
568.350 00
100 00%
50.00
341750
00002
Ties are Accessooes
$25.500.00
$28.50000
$0.00
$0.00
$28.500.00
100.00%
SO OD
1425 00
00003
Form Rental
$23.500.00
523.500 00
$0.03
$0.00
$23.50000
100.00%
$0.00
1175 00
00004
fl ora:See
58.503.00
$8,50000
$0.00
$000
18.500.00
100.00%
50.00
42500
00005
Rey*
$19.600.00
$15000.00
$4.500.00
$0 .00
519.500.00
100.00%
40.00
975,0C
00006
Formate MattialS
15030.00
54.000.00
$1.00060
WOO
55.000.00
100.00%
$000
250 00
00007
Misc. Materials
510.000.00
1,6.500.00
$3.500.00
50.00
$10000.00
100.00%
50.00
50000
00008
Aliso Sae Work
$30.750.00
512.300.00
$18.450.03
50.00
1,30750.00
100.00%
$0.00
1537.50
00009
Base Sao Form
$16.703.03
516.70000
$0.00
$0.00
$16.700.00
100.00%
$0.00
835.00
00010
Base Slab Ranforong
$34.803.00
$34200.03
$0.00
$000
234.80000
100.00%
$0.00
1740.00
00011
Base Slab Pal
15.950.00
25.950.03
$0.00
$0 00
15.050 00
103.00%
10.00
29750
00012
Base Walls Form
156.30000
556300.03
$0.00
$0.00
$56300.00
103.00%
$0.00
281500
00013
Base Walls Reweaving
$32.70)20
$32.700.00
$0.00
$0.00
$32.70000
100.00%
$000
163500
00014
Base Walls Pour
$8.300.03
$6.300.03
$0.00
$0.00
16.30000
100.00%
10.00
31500
00015
1st &hated Slab Form
$41950.00
$37,755.00
$4.195.00
$0.00
541.950.00
100.00%
W OD
2097 50
00016
1st Elevated Slab Reinforcing
$37.25000
537250.03
$000
$0.00
$37.25000
100.00%
50.00
1862.50
00017
1st Bemuse Slab Poor
$8.400 03
$4200.00
14.200.00
$0.00
$8.400.00
100.00%
$0.00
420.00
00018
1st Ft. Walls Form
$79.00000
531.600.00
$47.40000
$0.00
579.000.00
100.00%
$0 .00
3950.00
00019
1st Fl Walls Reinforcing
$4170300
516.680.00
$2010000
50.00
538880.00
88.44%
34.820 00
1844.00
00020
1st Ft Walls Pour
$5.603.00
$0.00
50.00
50.00
$0.00
000%
55.600 00
0.00
00021
Roof Dab Form
564250.00
10.00
10.00
50.00
$0.00
0.00%
$54.650.00
0.00
00022
Roof Slab Reerlorcans
542.50203
$0.00
$0.00
$0.00
50.00
0.03%
$42.500.03
0.00
00023
Roof Sob Pour
19.100.00
50.00
$0.00
$0 00
50.00
0.00%
$9.100.00
0.00
00024
Parapet Wail Form
$11.450.00
$000
$000
$0.00
50.00
0.00%
511.450.00
0.00
00025
Parapet Wan Reirdorong
$2.80000
$0.00
$0.00
$0.00
50.00
0.00%
$2.800.00
0.00
00026
Penal Wall Pour
33.303.00
$0.00
$0.00
$0 .00
$0.00
0.00%
23.300.00
000
00027
Overhead
534.228.00
$22.500.00
$4.100.00
10.00
$26.60000
77.71%
57.628.00
133000
03028
Profit
1102.683.00
$67.000.00
$12.300.00
$0.00
579.300.00
77.23%
523.383 00
3965.00
03029
C041 Trench SupporUVB Cram
$4.835.00
54.835.00
$0.00
10.00
54.835.00
100.00%
$0 00
241.75
00030
50.00
$0.00
$0.00
$0.00
IODIWO!
50.00
0.00
03031
$0.00
$0.00
$0.00
$0.00
ODIWO!
$0.00
0.00
03032
$0.00
$0.00
$0.00
$0.00
aC4W0
$0.00
0.00
GRAND TOTALS
5626296.00 -
2541.220.03
5119.845.00
5000
56(11.085 00
8000%
$165.231.00
$33 053 25
EFTA00622607
Emad Hanna
From:
Monique Harry (
Sent:
Wednesday. October 27. 2010 11 17 AM
To:
Emad Hanna
Subject:
B:g Bear Construction Req 8
Attachments:
BBC Req 8 pdf
Emad,
Attached for payment Big Bear Construction Req 8 in the amount $113,852.75. Project 1010 Code 03-120
Monique
EFTA00622608
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA00622604.pdf |
| File Size | 820.0 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 8,973 characters |
| Indexed | 2026-02-11T23:07:41.063443 |