Zorro Projects - 5/4/13
Main House - Outside
Start
End
Total Est. Cost
Notes
Landscaping -
Proposals & Maintenance from 3 companies forwarded to RK &
Rear Planter Bed
DI - 3/28/13
Front & Rear Parking Beds
Bowel Garden
'JE approved 4/27/13, Aspen Landscaping received the contract to
refurbish.
Aspen Grove
New proposal received 5/3/13 will review & forward 5/6/13
Pinion Screen
Landscape Lighting Timers -
;JE approved 4/27/13 to replace Timers
Landscaping - In House -
JE approved 4/27/13 to remove existing Ponderosa Pines,
Landscape Lights & to relocate Pinions to the area.
Ponderosa Pines & Landscape Lights at
Front Entrance
Removal of Dead Pine in Front Courtyard.
CAN WE PROCEED WITH REMOVAL
Bid Received 12/12/12 - Approved 3/20/13
Terraces - Three B's
4/7/13
$56,200.00
Terraces - $52,000.00
Stucco/Gutters/Painting - $4,200.00
Library Terrace Membrane - installed. Stucco to be completed
once MBR Terrence membrane is installed
MBR Terrace Demo complete. Work continues
$36,400.00
'Bid
Stucco Work - Three B's
4/7/13
Received 3/1/13 - Approved 3/20/13
Site Walls
Wall Stucco Patching & Painting 90% complete
Columns
Columns Stucco & Painting 90% complete
Attached Photos
Estancia Fountain -
$2,500.00
Bid received 3/1/13
Bowl Lift - $1,220.00
JE approved 4/27/13
Electrical - $880.00
Pump - $400.00
4/29/13 - Brice determined that the leak is the main line going to
the upper bowl. Proposed repair is to isolate leaking line & use
return line to lower bowl, splitting line to feed upper bowl. This
will mean we will continue using existing pump & filter. Will
forward cost 5/9/13
EFTA00624854
Zorro Projects - 5/4/13
Chess Fountain -
Requires resurfacing
JE approved 4/27/13
Bid will be forwarded 5/10/13
Ranch Front Gates -
Received bid 4/20/13, have requested vendor to make
adjustments, new bid received 5/3/13, reviewing
JE approved 4/27/13
New Gate Openers
Main House - Inside
Start
Total Est. Cost
Notes
Cooling Tower -
4/24/13 - RK approved bid from SPX & JBH. RK has all cost details
5/3/13 - Deposit was to be forwarded
Replacement of Pool Pac -
9/11/12
4/29/13 - Quote forwarded to RK, who requested more detail,
will forward once in hand
Engineering Inspection - $5,000.00
Unit Cost - $43,170.00
Ducting - TBA
Re • air of Pool Pac -
3/15/13
Unit working on fan only, proceeding with replacement of Pool
Pac
Repair Pool/Spa -
Vendor on site 4/8/13 to review scope of work
Water Sample of Tap Water -
4/27/13 - JE requested water samples be taken.
This will be completed by the end of the coming week once water
system is balanced - Dakota Well/RO went on line 5/3/13
Exterior Doors -
JE requested 4/27/13 that all saddles on exterior doors be
adjusted so doors will close correctly. Will be completed once
Terraces etc. complete
Audio Upgrade -
Installed - final programming required
Installed - Programming of remotes required
New TV's
DVD Players/Theater Upgrade
EFTA00624855
Zorro Projects - 5/4/13
Kitchen Table Electrical - Three B's
Bid Received 3/1/13 Lead Time 1 Week
Need to review design and floor
Electrical & Data Cut In - $2,160.00
Media Room - New Curtains/Blackout
2/24/13
JE selected fabric 4/27/13. Amount required has been placed on
hold. 2 companies will be submitting a bid by 5/9/13
Sarah's Office - New Curtains/Lined
2/24/13
JE selected fabric 4/27/13. As of date manufacturer cannot
provide enough yardage, they will forward an update 5/6/13
Gym - Mirrored Doors - Backed/Framed
2/24/13
3 B's completed, JE requested further work, will review with
vendor
IT & Phones
Start
End
Total Ed. Cost
Notes
4/27/13 JE approved the installation of new phones at MH
Reviewing new scope of work - Microwave option
Cell Repeaters & WI-Fl
Start
End
Total Bt. Cost
Notes
Cell Repeater - Library
Will have installed by 5/9/13
Cell Repeater- Gym
Will be completed with Audio install
Sound System - Gym
Requires refurbishment to accept I Pad
Computers
Lap Top - Lodge
Desk Top - Office
REQUESTING APPROVAL TO PURCHASE
Well K
Start
En
Total Est. Cost
Notes
Plugging First Hole - $15,000.00
Multi Media Filters & Install - $5,844.57
Transponder & Install - $1,700.00
Mis Pipe & Fittings - $1,000.00
Windows Laptop - $700.00
4/27/13
5/3/13
$620.56
JE approved 4/27/13
5/3/13 - Multi Media Filters ordered
5/8/13 - Transponder to be installed
5/3/13 - Laptop purchased
Dakota RO Water Softener
Start
End
Total Ed. Cost
Notes
2/18/13
5/3/13
$3,045.45
Complete - Well & RO on line as of 5/3/13
Lodge
Start
End
Total Est. Cost
Notes
Roof - Repair/Replace Broken Sections
11 will complete while on site for upcoming projects
EFTA00624856
Zorro Projects - 5/4/13
Log Cabin
Start
End
Total Est. Cost
Notes
Step Outside - Repair/Replace
2/24/13
NA
Caboose
Start
End
Total Est. Cost
Notes
Outside Wall - Installation of Retaining Wall
NA
Yurt
Start
End
Total Est. Cost
Notes
Yurt - Replace Walls/Roof/Door/Windows
$6,355.00
plus shipping
charges of
approx. $480.00
JE approved 1/12/13.
Vendor forwarded quote 5/3/13 - lead time after payment 8 to
10 weeks.
Floor will need to be sanded and resurfaced
REQUESTING APPROVAL FOR 50% DEPOSIT
Flay Barn
Start
End
Total Est. Cost
Notes
Paint
4/8/13
NA
Work to begin 5/9/13
Greenhouse
Start
End
Total Est. Cost
Notes
Paint-Outside
3/24/13
4/29/13
$390.00
Complete
Bunkhouse
Start
End
Total Est. Cost
Notes
Paint - Window Frames & Sills
2/24/13
NA
Walls completed, working on window frames & sills
Window/Doors - Total Replacement
2/6/12
Will Budget for 2014
Reservoir
Start
End
Total Est. Cost
Notes
Paint - Tank
2/24/13
NA
Will start once Bunkhouse & Haybam complete
Vehicles
Start
End
Total Est. Cost
Notes
2013 Ford Expedition - review Captain Seats
to be installed
3/27/13
Estimate received 5/2/13 - $11,528.74
Awaiting 2nd estimate
2008 Dodge Dually -Service/Repair
$3,509.55
Complete
M2
Start
End
Total Est. Cost
Notes
JE approved 4/27/13 investigating purchase of 2 dogs.
Researching
EFTA00624857
Zorro Projects - 5/4/13
Purchases
White Rug - Gym (10 x 12)
JE approved 4/27/13 to move ahead with Robert's Flooring to
manufacture a rug using carpet. Estimate expected 5/10/13
Big Urns - Outside MH
JE approved 3/27/13 - Terre Cotto
Outside Pool Furniture
Large Chrome Pool Clock
Facial Machine
Sue & Karyna to purchase
EFTA00624858
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Document Details
| Filename | EFTA00624854.pdf |
| File Size | 1065.6 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 6,469 characters |
| Indexed | 2026-02-11T23:07:52.585024 |