EFTA00631112.pdf
PDF Source (No Download)
Extracted Text (OCR)
From: Ann Rodriquez elEMMIN
>
To: "jeffrey E." <jecvacation@gmail.com>
Subject: Fwd: fiber project
Date: Thu, 10 Dec 2015 15:27:07 +0000
Ann R.
Begin forwarded message:
From: Ann Rodriquez •e
lMil
>
Date: December 10, 2015 at 11:26:24 AM AST
To: Hector Cintron
Cc: Cecile de Jongh
Subject: Re: fiber project
Jermaine Ruan
Hi everyone,
The Internet is down on LSJ. Please advise or assist'?
Ann R.
On Dec 9, 2015, at 3:24 PM, Hector Cintron
wrote:
NI Everyone.
, Omar Welch •ea,
c
la>
Does anyone have a copy of the final Data Path Sheet Coordination file (PCN - Dragonwave License File)? I was speaking with Allan and we only have the draft version before the name got changed from Choice and
Terrence took over. I want to verify that the Dragonwave id configured correctly based on the final coordination.
Hector.
From: Cecile de Jorigh
Sent: Tuesday, December 08, 2015 17:44
To: Hector Cintron
Cc: lermene Ruan; Omar Welch;
Subject: Re: fiber project
Email received from outside of the ATN domain. Use caution before using links/attachments.
Hector,
Would you like us to order the cable that VINGN needs? Perhaps we can get it faster.
On Dec 8,2015, at 5:11 PM, Hector Cintron •:i
s wrote:
Good Afternoon Cecile,
Thursday or Friday is fine, no rush. I believe the two main issues that were affecting the service was the network loop (this is fixed) and the outages when it rains is the Dug on the Dragonwave (pending fixing). Right
now a long as it doesn't rain the radio will stay up and service should be allot more stable.
From: Cecile de Jongh (madal
Sent: Monday, December O7, 2015 21:12
To: Hector Cintran
Cc: lermame Ruan; Omar Welch;
Subject: Re: fiber project
email received I rem outside of the ATN domain. Use caution before using links/attachments.
Good evening Hector,
Mulleine will be out of the office for a few days. Perhaps we can schedule the non priority items
on Thursday. I see that you are still waiting for the cable that VINGN needs to do the crossover so that answers my question about whether they will be going to the Cabrita site tomorrow.
I'll let Anna answer you re the service the last few days since she is M a better position to tell the difference.
Thank you for the update and report.
Cecile
On Dec 7,2015, at 8:18 PM, Hector Cintron •r
s wrote:
Hi Everyone.
Attached is a preliminary detail report, beside the 2 drops (Sun and Today due to the rain) how is the service after the changes?
EFTA00631112
Pending Items NON priority:
•
Move both rockus radios from the netgear to the Osco 3560 (by installing PoE power supply)
•
Interconnect Choice 3650 and LSJ 3560 at the gym (this is to be able to have connectivity to the AP that covers S Palms)
Pending Items Priority
•
ViNgN connectivity (awaiting cable for cross connect)
Jermaine, Let me know when we can schedule the non panty items, no rush
QTY
part
desc
BOM
Installed
I
Location
arrifyed
Responsibility
1
OSCO2921/K9
Cisco Router
Data Room
Installed
Cnoice
1
GLC43X-0
VINGN Simplex Single Mode Module
In the cisco router
Data Room
Installed
LSJ
1
VINGN Simplex Cable 35' ST to LC
Between Cisco Router and Patch Panel (coming from SIT)
Data Room
Installed
LSJ
1
HWIC-1GE-SFP
WIC Card for SEP
Cisco Router
Data Room
Installed
LSJ
1
MM Duplex fiber cable 6' SC to LC
Between Cisco Router and Patch Panel
Data Room
Installed
LSJ
1
GLC-SX-MM
MM Fiber Module
Cisco Router
Data Room
Installed
Choice
1
GLC-SX-MM
MM Fiber Module
Cisco 3560
Building-Gym
Installed
Choice
1
MM Duplex fiber cable 6' SC to LC
Between Osco 3560 and patch Panel
Building-Gym
Installed
LSJ
0
rackmount screws
for Cisco 3560
Building-Gym
Installed
LSJ
1
356OG-24
Cisco 3560
Building-Gym
Installed
Choice
1
3560G-24
Osco 3560
Outside Cabinet
Installed
Choice
0
rackmount screws
for Cisco 3560 Could use existing from netgear
Outside Cabinet
Installed
LSJ
1
Simplex fiber cable
for cross connect at Vesuup
Pole
Due in Thursday
Choice
Other Pending Items/Work
Cross Connect
STT Beach
After cable arrival
VINGN
Router Config Info
X
LSJ
Dragonwave Warrantee Info
??
Dragonwave Survey
Includes Signal, Firmware, Hardware, Monitoring, Grounding
Choice
From: Hector Orton
Sent: Friday, December 04, 2015 18:00
To: ilermame Roan' Omar Welch'
Cc:
Subject: RE: titer project
Hi Everyone:
I'll send a full detail report in a few days. So far here is a brief description.
•
The Ruckus AP that is setup to cover the southside of the island that is installed on the tower where the Dragonwave is not working.
•
There was a network loop between the dragonwave and the netgear causing packet drops and unstable network. • • fixed
•
Install two switches (Outside shelter, Gym) to be able to monitor both the Dragonwave and Ruckus bodge
•
Took out the apple router that was working as DHCP and NAT.
•
Brought the Cisco 2921 router online. Now this is the main DHCP and NAT router
•
Installed the fiber cable and module for the VINGN connection. This was installed in Port S on the fiver cable that goes to Vessum
•
I re.enable the dragonwave management ports so I can verify the configuration
•
I changed the password of both radios (the default password was configured Jermaine I'll get you the new password so you can file them)
•
I added some of basic monitonng. For the dragonwave (I would be able to add full monitoring until I reconfigure the units)
•
I added monitoring to the Cisco router and the switch in the shelter
We did some testing before we left with youtube and Apple7V and all were working without buffering.
The Dragonwave will have to be taken offline once the VINGN circuit goes online. The software on the unit is old and it has some bugs that wd cause issues once the units are up for about 1-2 months. The connection will
drop until the unit is rebooted.
Another bug is this error:
Notice:Dec 0121:55:01 C1N14DGM0075 alarm)544789.1J: Critical: Crypto configuration mismatch peer Alarm cleared
Notice:Dec 0121:55:01 C1N14DGM0075 alarm)544789.1J: Critical: Crypto configuration mismatch peer Alarm raised
EFTA00631113
:eithimage001.png@O10131103.SCE 79110
Will send the rest of the info in the detail report
From: lermaine Ruan [magma
Sent: Friday, December 04 2015 13:30
To: Omar Welds;
Cc:
Subject: Fwd: fiber project
Hector Cintrcn
(mail received from outside of the ATN domain. Use caution before using links/attachments.
Good day all,
Hector was able to complete the following:
dear up the network loop that was causing bottle in data follow
install the switches to monitor the dragonwaves
physical setup for the new router for vingn
To be done:
ivingn to do the physical crossover at stt
create the tier login id's for dragonwaves
letup for remote monitoring for island
Regards
Nunn
Sent from my iPhone
Begin forwarded message:
From: Hector Crntron
Date: December 3, 2015 at 7:19:30 PM AST
To: lermaine Ruan
Cc: Omar Viekh ir
a, Cecile de mash .r
a, Myatt Edwards
Subject: RE: fiber project
When I left the office I asked Allan and I didn't see the cables, he will be looking into it.
Also Just an FYI I logged in the dragonwave to gather some information and I noticed that both Ethernet ports (data and management) on the IS side are plugged in to the switch creating a network loop. What I did was
shutdown the management port on outside. This will help some but will be fixed tomorrow. I would not be surprised that accessing the Internet is smoother now due to lowering of the packet drops and max times
Pings before shuting down the port
Success rate is 98 percent (9876/10000), round-trip min/avg/max = 1/4/128 ms
After
Success rate is 99 percent (9999/10000), round-trip min/avg./max = 1/4/44 ms
From: lermaine Ruan imatta.
Sent Thursday, December 03, 2015 17:21
To: Hector Cntron
Cc Omar Welch; Cecile de lonigh; Alyster Edwards
Subject Re: fiber project
Email received from outside of the MN domain. Use caution before using links/attachments.
Hi Hector
Terrence stated that the login for dragonwaves are set to factory default .
Regards
Jruan
Sent Iron, my iPhone
On Dec 3, 2015, at 3:52 PM, Hector Gomm
wrote:
Hi lermaine,
I just spoke with omar and the cable hasn't arrived, what we can do is this, I'll split the work on two trips, I'll go tomorrow weather permitting (It's supposed to be sunny) regardless if the VINGN circuit is ready and I'll
do the installation. I'll bring up the router and install the 2 switches to be able to monitor the dragonwave and I'll leave the deep inspection and testing for the second trip once VINGN is up.
There will be a downtime of between 1 to 2 hours as I make the changes. If this is acceptable I'm a GO for tomorrow. What I'll need after the switch Installation is the logins for the dragonwave so once this Is done I
can start with the venfication of the link (no changes will be made).
On the second trip I'll go to the island with Alyster takedown the dragonwave to do the following:
EFTA00631114
•
Test VINGN circuit
•
Test VINGN (allover
•
Venfy all grounding
•
Venfy all connectors weatherproofing
•
Venfy Lightning arrestors
•
Check all cables and replace cables if needed
•
Upgrade firmware on DW if needed
•
Make configuration changes to the DW if needed
Let me know if this is acceptable.
From: Jermaine
Sent: Wednesday, December 02, 2015 16:31
To: Omar Wekh
Cc: 'Cecile de largh.; Alyster Edwards; Hector Ontron
Subject RE: fiber project
(mail received from outside of the ATN domain. Use caution before using links/attachments.
Good Evening Omar,
I am following up to verify that VINGN is on target for tomorrow and Choice for Friday.
Regards
Jruan
From: Hector Cintron Oa
Sent: licnday, November 30, 201S 5:11 PM
To: lemon° Ruan
Cc: Cecile de length, Omar Welch; Atyster Edwards
Subject RE: fiber project
Perfect, you got everything. The PDF only had the fiber from Power and Tel and not the items from curvature, so I just wanted to make sure.
Thanks
From: Jermaine Ruan
Sent: licnday, November 30, 2015 17:03
To: Hector Cintron
Cc: Cecile de leech; Omar Welch; Alyster Edwards
Subject Re: fiber project
mailto
Email received from outside of the ATN domain. Use caution before using kiks/attachments.
Good day Hector
I have 2 simpler and 3 duplex cables from power and tel. I have 1 hwic module and 1 gk connector.
4intage001.jpg>
Sent from my &hone
On Nov 30, 2015, at 4:31 PM, Hector Cintron .an
wrote:
Those are the fiber cable from power and tel, was an order placed for the culvature items?
Bellow I highlighted the items:
Green are the items from Power and Tel that arrived
yellow are the items from Culvature that I do not see listed on the PDF
From: 3ermaine [mat
Sent: Monday, November 30, 2015 16:24
To: Hector Ontron; 'Cecile de lough'
Cc Omar Welch; Alyster Edwards
Subject: RE: fiber project
Email received from outside of the MN domain. Use caution before using links/attachments.
Please see attached
From: Hector Cintron
Sent Monday, November 30, 2015 12:54 PM
To: Cecile de Jongh
Cc Omar Welch; lermaine; Alyster Edwards
Subject RE: fiber project
mailto:
Jermaine,
Can you send me a list of all the items that you received? I want to make sure we have everything. I just created a BOM to keep track of what is needed and I'm sure
adding to the work/pending list
EFTA00631115
QTY
1
part
C15CO2921/K9
desc
Cisco Router
BO M
Installed
Location
Data Room
arrived
Installed
Responsibility
Choice
1 GLC-BX-D
V1NGN Simplex Single Mode Module
In the cisco router
Data Room
I.S.I
1
IEIIIIIMMIMMIMMMi
Between Cisco Router and Patch Panel (coming from SIT)
Data Room
I.S.I
1 HWIC-1GE-SFP
WIC Card for SIP
Casco Router
Data Room
I.S.I
1
IIIMMIMMEMEMINII
Between Cisco Router and Patch Panel
Data Room
LS.I
1 GLC-SX-MM
MM Fiber Module
Cisco Router
Data Room
x
Choice
1 GLC-SX-MM
MM Fiber Module
Cisco 3560
Building-Gym
x
Choice
1
IMIII
IIIIMI
Between Cisco 3560 and patch Panel
Building-Gym
LS.I
4
rackmount screws
for Cisco 3560
Building-Gym
LS.I
1 3560G-24
Cisco 3560
Building-Gym
x
Choice
1 3560G-24
Cisco 3560
Outside Cabinet
x
Choice
4
rackmount screws
(or Cisco 3560 Could use existing from netgear
Outside Cabinet
I.S.I
Other Pending Items/Work
Cross Connect
STT Beach
VINGN
Router Config Info
X
I.S.I
Dragonwave Warrantee Info
??
Dragonwave Survey
Includes Signal, Firmware, Hardware, Monitonng, Grounding
Choice
From: Cecile de Jongh tab
Sent: Wednesday, November 25, 2015 13:44
To: Hector Ontron
Cc Omar Welch; lermame
Subject: Re: fiber project
Email received from outside of the MN domain. Use caution before using links/attachments.
Thank you Hector.
On Nov 25, 2015, at 11:37 AM, Hector Cintron
wrote:
I can only comment about li3
3 - it should, this way I can do a fill integration of the ViNGN, Dragonwave backup, test (allover.
The plan that I would like to do:
•
install ViNGN via the new router. Test it and switch the island over this new connection (primary)
•
Once this is done I can takedown the Dragonwave connection to add some switches to be able to monitor the link and take over maintenance. Once this is complete
•
Reconnect the Dragonwave as secondary link
•
Test (allover to Secondary (OW).
The above plan has a 1-2 min downtime.
If Mal is not ready I can still do the install but I need to install the switches needed to monitor the dragonwave there will be a downtime of a few hours as I do the swap but no testing will be done.
Hector.
From: Cecile de knob a
Sent Wednesday, November 25, 2015 10:40
To: Meetly Ontron
Cc Omar Welch; lermaine
Subject: Re: fiber project
Email received from outside of the ATN domain. Use caution before using links/attachments.
Ok.
1. Does this still need to be scheduled with them?
2. If so, do we do that or do you?
3. Does this need to be done before Hector goes to the island or can it be done anytime afterwards?
On Nov 25, 2015, at 10:19 AM, Hector Cintron
wrote:
The crossover does require a visit to the Pole (the one in St Thomas at the beach) where VINCI,' connects to the fiber the goes to the Island.
From: Cecile de krigh
Sent: Wednesday, November 25, 2015 10:17
To: Omar Welch
EFTA00631116
Cc lermaile; Hector Ontron
Subject: Re: fiber project
Email received from outside of the ATN domain. Use caution before using links/attachments.
Does this "crossover" require VINGN to visit the site or Is it something that is done remotely from their office?
On Nov 25, 2015, at 10:01 AM, Omar Welch
wrote:
Hi Cecile
The connection does play a part in the delay until Monday but not the confirmation for today as no confirmation was made for today. We are assisting ViNGN to be ready for Monday.
"True leaders fortify themselves with thinkers and innovators, because yes men are only saying yes to self preservation."
On Nov 25, 2015, at 8:13 AM, Cecile de Jongh
wrote:
Email received from outside of the ATN domain. Use caution before using links/attachments.
Good morning Omar and Hector,
Has the date switched to Monday due to the fact that VINGN has not done the crossover? If so, why did Hector confirm today? Will VINGN complete the crossover by Monday?
On Nov 25, 2015, at 9:02 AM, Jermaine
wrote:
Good day Omar
I am not understanding this. As per my conversation, I stated Monday is too long. I started recemng emails from Hector concerning the installation shortly after. One of my last email was confirming tomorrow.
Jruan
From: Omar Welch
Sent Wednesday, November 25, 2015 8:55 AM
To: 3ermaine
Cc: Hector Ontron; Cece de loop
Subject Re: fiber project
mailto:
Jermaine per my message Hector will not be able to complete installation until Monday please make arrangements for this. Also we are still awaiting confirmation from VINGN on the cross connect.
'True leaders fortify themselves with thinkers and innovators, because yes men are only saying yes to self preservation."
On Nov 24, 2015, at 3:32 PM, lermaine
wrote:
Email received from outside of the ATN domain. Use caution before using links/anachments.
Good Day Hector,
Please be advised, all components are here in the office ready for installation tomorrow. Does VINGN have the crossover in place?
Regards
Jruan
From: Hector Citron [cona
Sent: Tuesday, November 24, 2015 12:28 PM
To: Jermaine Ruan
Cc: Omar Welch
Subject: RE: fiber project
Hi Jermaine,
Can you send me a list of the items you have for the install? I want to make sure we have everything before I head over there.
Thanks.
From: Hector Citron
Sent: Wednesday, November 11, 2015 10:47
To: 9ermaine Ruan'
Cc: Omar Welch
Subject: RE: fiber project
I cannot give you a date sense it's all based on the following:
ViNGN installs the cross connect
whether we order the pans or L51 order the pans. This was something that Omar was going to speak to (sorry I do not know the name) 151 Finance.
o For ViNGN connection (Router Module, Fiber Module, Fiber cable)
o Choice connection lswaches, fiber cables)
EFTA00631117
Also just an FYI NI be going on vacation staring this Friday and NI be back on Monday 23S so assuming all the above is installed, purchased and delivered by the time I get back it would be sometime the week of
the 20
Hector.
From: Jermaine Ruan (mat to;
Sent: Wednesday, November 11, 2015 09:52
To: Hector Chiron
Cc: Omar Welch
Subject: Re: fiber project
Email received from outside of the ATN domain. Use caution before using links/anachments.
Good morning gentlemen
The principal is requesting a new date for the fiber. Do you have a suggested estimated time of completion?
Regards
Jruan
Good evening all
When is the new date for the connection so I can update my superiors
Regards
Jruan
Sent from my iPhone
On Nov 10, 2015, at 11:25 PM, Hector Cintron
wrote:
Hi Guys,
I haven't received notifications that the items that we need to finish came in so that would be no.
From: Omar Welch
Sent: Tuesday, November 10, 2015 19:06
To: lermame Ruan; Hector Ontron
Subject Re: titer project
Hector?
"True leaders fortify themselves with thinkers and innovators, because yes men are only saying yes to self preservation."
On Nov 10,2015, at 6:44 PM, lermaine Ruan •cl
t• wrote:
Email received from outside of the ATN domain. Use caution before using links/anachments.
Good night Omer
Yep, I am trying to line up the runs in the morning
Regards
Yuan
Sent from my iPhone
On Nov 10, 2015, at 6:19 PM, Omar Welch
wrote:
To come to the island?
"True leaders fortify themselves with thinkers and innovators, because yes men are only saying yes to self preservation?
On Nov 10, 2015, at 6:10 PM, lermaine <
> wrote:
Email received from outside of the MN domain. Use caution before using links:attachments.
Good day omar
Is hector still on for tomorrow?
Regards
Jruan
<LSJ Preliminary Reportpcli>
EFTA00631118
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Dates
Email Addresses
Document Details
| Filename | EFTA00631112.pdf |
| File Size | 381.6 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 18,993 characters |
| Indexed | 2026-02-11T23:11:09.816344 |