EFTA00635340.pdf
PDF Source (No Download)
Extracted Text (OCR)
From: "Gary Kerney"
To: "Jeffrey Epstein" <jeevacation@grnail.com>
Subject: FW: Revised Pool Plan-3
Date: Fri, 04 Mar 2011 20:52:25 +0000
Attachments: S 1_Pool Plans Layout-(3).pdf
are you ok with the plan?we're ready to set the plumbing and steel and need your sign off
From: Gary Kerney
Sent: Thu 3/3/2011 3:29 PM
To: Jeffrey Epstein
Cc: William Rowles;
Subject: FW: Revised Pool Plan-3
Jeffrey
attached new pool ,see bares stair question
From: Bart Wolterman [mailto:
Sent: Thu 3/3/2011 2:42 PM
To: Gary Kerney
Cc:
Subject: Fw: Revised Pool Plan-3
Hello, Here is new drawing, changed depths in pool, extended shallow area by 5 ft., top step is 38", the only
thing is that I have from top of coping to 1st step at 8", we can go 9" just let me know what step to subtract I"
from, real easy and we can change on our gunite plan
- - On Thu, 3/3/11, N. George Mitwasi eci
wrote:
From: N. George Mitwasi
Subject: Revised Pool Plan-3
To: "Bart Wolterman"
Date: Thursday, March 3, 2011, 12:22 PM
N. George Mitwasi. PE
PROFESSIONAL
ENGINEERING
SERVICES, INC.
MAILING. PO BOX 3041 LAKE HAVASU CITY. AZ 86405
EFTA00635340
DELIVERY: 2169 SWANSON AVE. SUITE 4. LHC. AZ 86403
EFTA00635341
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Email Addresses
Document Details
| Filename | EFTA00635340.pdf |
| File Size | 55.0 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 1,213 characters |
| Indexed | 2026-02-11T23:12:12.664563 |