Page 645 MCC NEW YORK UPDATES *" Daily Camera status reports of the status of high priority areas; SHU, 10 South, Suicided Watch, Female unit and 3 Sally. Facilities Cameras: =" The FBI removed the previous camera system (DVR) and the new system (NVR) has been installed and is operational. Additional cameras have been added in SHU which are digital. Within the next 6 months additional cameras will be added to the system with a target completion date of April 2020. « MCC has a& tétal ote Icameras, is inoperable and in the process of being ne (bad camera). The anticipated date of completion is within the next two weeks. =" The new NVR has the capability to monitor and record BITE cameras. The following locations have been identified as needing coverage: elevators, receiving and discharge, all inmate housing units, sallyports, and outside perimeter. Summary " To date all information requested by OIG and FBI has been provided. " Health Services has received the autopsy results from the NY Medical Examiner’s office on inmate Epstein and is secured " TDY staff assigned to NYM have all been hard working and team players. =" Staff morale at MCC New York is average in light of the most recent event; however, they are resilient and working hard as a team to move forward. They have embraced the TDY staff that have arrived and have been extremely courteous and receptive to ensure everyone works together. DOJ-OGR- 00025098

Document Preview

DOJ-OGR-00025098.jpg

Click to view full size

Document Details

Filename DOJ-OGR-00025098.jpg
File Size 541.3 KB
OCR Confidence 92.4%
Has Readable Text Yes
Text Length 1,450 characters
Indexed 2026-02-03 20:54:04.514628