ZORRO DEVELOPMENT
1/21/14
Satellite:
Deposit paid to Advanced Comm — 1/17
Meeting with Advancced Comm 1/23 to confirm network map & scope of work.
References/Updated Proposal from SpaceNet & Jim Cloud forwarded to Rich — 1/20
Meeting today with RMC Electric to confirm poles for links to MH & RC
Pool Replaster/Spa Clean: attached photos
Plaster work finished, acid wash & filling started today
Bead Blasting of Spa Tile, unsucessful, have requested estimate to replace tile & grout
will forward once in hand
Gate:
Project Complete as of 1/21
Sony:
Issues with Tablet not communicating with equipment. New Tablet has been ordered
incase it is a Tablet issue
IR to be extended closer to seating area.
Installer back on site 1/23 to resolve issues
Installation of moulding on hold until all issues are resolved
Dakota Well:
Rig was due on site today, delayed due to an emergency call out.
Now due 1/23
Cactus Removal: attached photos
Fabrication of railway tracks for drags complete.
Removal of cactus continues as weather allows
EFTA00636503
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Dates
Document Details
| Filename | EFTA00636503.pdf |
| File Size | 53.8 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 1,065 characters |
| Indexed | 2026-02-11T23:12:39.390503 |