EFTA00636585.pdf
PDF Source (No Download)
Extracted Text (OCR)
From:
To:
Cc:
Subject:
Date:
Attachments:
Daphne Wallace
Jeffrey Epstein <jeevacation@gmail.com>
ann rodriquez cz
>, Rich Kahn S‘
,
Samson Dome - January 9, 2014
Thu, 09 Jan 2014 17:14:37 +0000
Verifying_height_of_ll_feet_(1).JPG; Verifying_height_of_ll_feet_(2).JPG;
Verifying_radius_of_10feet_(1).JPG; Verifying_radius_of_10_feet_(2).JPG;
Verifying_radius_of_10feet_(3).JPG; Verifying_radius_of_10_feet_(4).JPG;
Verifying_radius_of_10feet_(5).JPG; Base_and_center_stake.JPG;
Base_and_support_ring_(1).JPG; Base_and_support_ring_(2).JPG;
Base_and_support_ring_(3).JPG; Support_arches_(1).JPG; Support_arches_(2).JPG;
Support_arches_(3).JPG; Support_arches_(4).JPG
Greetings Mr. Epstein,
The following is my report and understanding of your Dome Project thus far:
Measured from the bottom of the center support stake to the mark indicated by Mr. Samuel in photo #2, verifying
the height is 11 feet.
Measured from the base of the center support stake to various points on the base, verifying the radius is 10 feet.
The rest of the photos are showing what you saw and concluded yesterday - there is still a lot of work to be done.
The base ring will have a support ring welded on to it. The arches, which will make the frame of the dome, will
then be welded on to the support ring, approximately every 2 feet. To provide maximum strength and stability,
the arches will be doubled - there will be about 60-62 arches - they have to be formed - you see the ones they
have already bent - they total about 11 so far.
Once the arches are in place on the support ring, a plate in the form of a disc will be fabricated and welded to the
top of the center stake, at 11 feet, and the tops of the arches will be cut and welded around this disc.
The aluminum panels which will cover the frame are in 2 foot by 10 foot sheets. Each section requires 17 feet to
cover from base to apex, so 2 sheets are required, the bottom one is 10 feet, and the upper one cut down to 7 feet.
They will be shaped and cut to fit. This process has not started as yet.
I asked Mr. Samuel when, in his time frame of completing the base and support welding, bending the remaining
arches, assembling the frame, and bending, cutting and attaching the panels, would the dome go to the painter.
He says the painter will be on site, working in tandem with them. As they complete a section, the painter can
begin with the priming.
Mr. Samuel still believes that 1/24/2014 is a viable date. He has cleared his work schedule, and he and his 2 sons
are all completely on this project. I told him you may stop by in the future.
Respectfully submitted,
Daphne
EFTA00636585
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Email Addresses
Document Details
| Filename | EFTA00636585.pdf |
| File Size | 80.0 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 2,664 characters |
| Indexed | 2026-02-11T23:12:41.258328 |