Back to Results

EFTA00640186.pdf

Source: DOJ_DS9  •  email/external  •  Size: 43.0 KB  •  OCR Confidence: 85.0%
View Original PDF

Extracted Text (OCR)

From: "Jermaine" To: "Jeffrey Epstein" <jeevacation@gmail.com>, "Rich Kahn" a> Cc: "'Cecile de Jongh"' "ann rodriquez" Subject: Choice Fiber (VINGN) Update Date: Thu, 05 Nov 2015 20:32:04 +0000 Good day All Choice did the primary setup with the router and spent three hours on LSI. There are configurations (IP and Circuit ID Protocols) that VINGN and Choice are working out in order for Choice to be able to go into the VINGN network and this should not take more than 6 -12 hours. In addition, there are special patched cables which are designed to receive and send information on one strand of fiber verses the standard two strands; one is to send and the other is to receive information. The cables are used by Choice to connect to VINGN. We do not currently have the cables and Choice will source and install them at no additional cost to us. The new date for VINGN to come on line is November 11, 2015 or sooner. I reviewed Terrence's current setup with Choice's IT person, Hector. There will be some modifications needed to his setup in order for Choice to have total control of the fiber link and both the (Si and Bovoni Tower Dragonwaves. The new completion date for the backup link (Dragonwaves) to be synced with the system is November 20, 2015. Hector's plan is to get LSI on the VINGN network first, as quickly as possible, and then work to sync the Dragonwaves as a backup link into the system. Regards Jruan EFTA00640186

Document Preview

Document Details

Filename EFTA00640186.pdf
File Size 43.0 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 1,456 characters
Indexed 2026-02-11T23:14:17.067348

Related Documents

Documents connected by shared names, same document type, or nearby in the archive.

Ask the Files