Back to Results

EFTA00640344.pdf

Source: DOJ_DS9  •  email/external  •  Size: 40.6 KB  •  OCR Confidence: 85.0%
View Original PDF

Extracted Text (OCR)

From: Larry Visoski -Ma> To: Je vacation <jeevacation®gmail.com>, Lesley Groff <1 Cc: Rich Kahn Subject: GIV update Date: Thu, 24 Mar 2016 13:21:02 +0000 Jeffrey, Elevator flight control cable was changed due to ware. While doing flight control checks, Gulfstream mechanic noticed a clicking sound in control yoke, while rotating aileron yoke. They removed the Yoke from cockpit, replacing nut plate under floor board in cockpit, time consuming,. Better update on delivery status later today.,Dave and I plan to arrive at Westfield at noon tomorrow. Thx Larry Pete and Larry, Aircraft is still in tail dock. Wing leak checks ongoing as some panels have leaked and require corrective action. O2 bottles installed and leak checked. We have run into some challenge's with the yoke repair/installation. This is pushing our time frame back. We will access any revision to delivery later today as work progresses and we can make an accurate estimate. Thank You, Mike Tucker Gulfstream Westf Offic Fax- Sent from my iPhone EFTA00640344

Document Preview

Extracted Information

People Mentioned

Document Details

Filename EFTA00640344.pdf
File Size 40.6 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 1,053 characters
Indexed 2026-02-11T23:14:20.346524

Related Documents

Documents connected by shared names, same document type, or nearby in the archive.

Ask the Files