EFTA00643709.pdf
PDF Source (No Download)
Extracted Text (OCR)
From: Richard Kahn
To: "Jeffrey E." <jeevacation@grnail.com>
Subject: Fwd: Choice intemet update
Date: Thu, 10 Mar 2016 13:38:07 +0000
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
New York NY 10022
Begin forwarded message:
From: Jermaine Ruan
Subject: Re: Choice Internet
Date: March 9, 2016 at 7:23:51 PM EST
To: Richard Kahn <
Cc: ann rodriquez
ita
Good evening Rich
Gsj is online as 5:15 today on the temporary link that Choice installed. Hector will be monitoring the link for
stability. There is a block on the phone side but he will open the path for the phone tomorrow afternoon.
Regards
Jruan
Good day Rich,
FYI:
please expand on wiring? The wiring that connects the radios to the main complex switch. This was
completed today along with minor adjustments to the radios on LSJ tower for maximum true put.
when will job be completed by as jee is coming thursday am? Hector says we should be online tomorrow. He
will be opening the ports to the intemet tonight. He states they should be ready for JE arrival on Thursday.
will? We have finalized the exterior wifi today (JE beach office is well covered). We will be finalizing the
interior Wifi tomorrow.
Regards
Jruan
On Mar 8, 2016, at 9:43 AM, Richard Kahn •
> wrote:
EFTA00643709
please expand on wiring?
when will job be completed by as jee is coming thursday am?
wifi?
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
New York, NY 10022
On Mar 7, 2016, at 10:43 PM, Jermaine Ruan
> wrote:
Good night Rich
The equipment on gsj has been setup there is some wiring that needs to be finalize and Hector to finalize the
programming. I will be on site tomorrow.
Regards
Jruan
Sent from my iPhone
On Mar 7, 2016, at 5:06 PM, Richard Kahn <
> wrote:
update please
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
New York, NY 10022
On Mar 7, 2016, at 12:41 PM, Jermaine Ruan
> wrote:
Good day Rich
I am off today. The choice team did Lsj on Friday and is currently on GSJ today (I heard there are heavy
rains on LSJ and GSJ). I will get an update from Hector and forward it to you. Tomorrow Hector will
commence with the testing.
EFTA00643710
Regards
Jruan
Sent from my iPhone
On Mar 7, 2016, at 12:21 PM, Richard Kahn <
wrote:
can you please send us all another update again at end of day today
thanks
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
New York, NY 10022
On Mar 3, 2016, at 8:52 PM, Jermaine Ruan <
wrote:
Good Evening Boss
FYI:
Choice completed their site preparations today. They begin the mounting of the equipment tomorrow
3/4 at 9:00 on LSJ side. According to Choice both islands sites should finish by 3/7, Link and wireless
testing on 3/8.
Regards
Jruan
On Tue, Mar 1, 2016 at 7:15 PM, Jermaine Ruan <
Yes boss,
i will consult Danny and Anna before any thing is done.
Regards
Jruan
wrote:
On Tue, Mar I, 2016 at 6:06 PM, jeffrey E. <jeevacation@gmail.com> wrote:
do it carefully
On Tue, Mar 1, 2016 at 7:40 PM, Jermaine Ruan <
wrote:
Good Evening Boss,
Allan, Omar, Hector and I finalized our meeting for the needed materials required to equip GSJ with internet
in a few days.
I am requesting your permission to have a buried conduit pipe installed running from the GSJ solar farm to
the Main Complex (In house). This is for Choice to pull the necessary cables down to the complex to
complete the network.
EFTA00643711
Allan and Hector are confident that they will be able to start on Thursday barring any problems. They will
confirm tomorrow.
Also Boss FYI:
As per our discussion on the dragonwave licensing procedure. My findings are as follows:
I spoke to Ms. Hardly at Micronet (the company that licensed your first dragonwaves) . They confirmed the
timeframe that FutureTech stated that this process does take from 30— 90 days.
The reason was explained to me as follows:
1.
FCC 601 application is filled out and submitted.
2.
It is then processed for an open sub-band frequency and filed with FCC
3.
The FCC submit letters to all private, federal, and public agencies to verify that the sub-band
will not interfere with existing frequencies in the vicinity.
4.
They are given approximately 30 days to reply.
5.
If there isn't a complaint filed the sub-band frequency is released to be programmed into the
radio.
a.
If the complaint is valid then the process between Micronet and the FCC is repeated.
I verified this information with Hector and Allan during our meeting. They stated approximately the same
steps, they have to do this every time they order any kind of licensed radios.
Regards
please note
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
JEE
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to jeevacation@gmail.com, and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA00643712
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Dates
Email Addresses
Document Details
| Filename | EFTA00643709.pdf |
| File Size | 196.4 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 5,287 characters |
| Indexed | 2026-02-11T23:15:26.961291 |