Back to Results

EFTA00644971.pdf

Source: DOJ_DS9  •  Size: 98.1 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

From: "Jermaine" To: "Rich Kahn" , "Jeffrey Epstein" <jeevacation@gmail.com>, "ann rodriquez" Cc: "'Cecile de Jongh"' Subject: FW: Fiber project Date: Mon, 30 Nov 2015 14:45:49 +0000 Good Day all Choice has once again opted not to show to complete the installation for the fiber. I didn't get an email, text, or a call stating that they were considering cancelling. It was on a return call from my calls this morning, that Omar canceled today. I then asked for details, I wasn't given a precise reason except that his tech would like to do it in conjunction with VINGN and he is rushing to a meeting. I asked (and emailed) for him to send me an email for the reason they canceled and for the new installation date. Regards Jruan From: Jermalne Ruan [mallto: Sent: Friday, November 27, 2015 10:05 PM To: Cecile de Jongh Subject: Re: Aber project draft Thanks Cecile Regards Jruan Sent from my iPhone On Nov 27, 2015, at 9:53 PM, Cecile de Jongh < > wrote: Good evening Everyone, Omar confirmed that Choice (Hector) will be on LSJ on Monday (11/30/15) morning to complete their side of project. Hector will do the following: 1. Install ViNGN via the new router. Test it and switch the island over this new primary connection. 2. Take down the Dragonwave connection and add some switches to be able to monitor the link and take over the maintenance. Once this is complete; 3. He will reconnect the Dragonwave as the secondary link 4. Lastly, he will test the failover to Secondary. The above steps have a one to two minute downtime. EFTA00644971 VINGN will not need to go to LSJ. They will install the crossovers at the Cabrita site. If ViNGN is not ready on Monday, Hector can still do his install but he will also need to install the switches required to monitor the Dragonwave. With this scenario, there will be a downtime of a few hours as Hector can do the swap but no testing will be done. Omar also confirmed when I spoke to him today that if the crossover cables arrive on or before Monday, VINGN will be able to do there crossover. If not, it will be done as soon as the cables arrive. Please note that when I asked Omar for the list of materials needed, the cables were not on the list; we ordered everything on the list provided by Choice. Regards Jruan Sent from my iPhone With warm regards, Cecile Sent from my iPhone and misspellings courtesy of iPhone. Begin forwarded message: From: Jermaine Ruan Date: November 27, 2015 at 5:16:57 PM AST To: Cc: Subject: Fiber project Good day all Please be advised that Choice has moved the install date to Monday the 30th. There was an issue between vingn and choice pertaining to the fiber crossover to the circuit for Lsj. Choice is working to resolve the matter. Regards Jruan Sent from my iPhone EFTA00644972

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA00644971.pdf
File Size 98.1 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 2,825 characters
Indexed 2026-02-11T23:16:14.956895
Ask the Files