From: Daphne Wallace
To: Jeffrey Epstein <jeevacation@gmail.com>
Cc: Rich Kahn
Subject: Fwd: R.O. & Generator Bldg. Revisions
Date: Wed, 22 Apr 2015 19:14:53 +0000
Attachments: A1.0-(4-22-15).pdf; LTSJSZM _(4-22-2015).pdf
Greetings Sir,
Revisions from John for your review and comments.
Respectfully, Daphne
Forwarded message
From: John P. Woods, AIA
Date: Wed, Apr 22, 2015 at 2:03 PM
Subject: R.O. & Generator Bid . Revisions
To: Da hne Wallace
, Cecile de Jongh <
Daphne,
, ann rodriquez
Attached are the revised drawings for the R.O. & Generator Building Roofing project. These changes are based
upon comments from Mr. Epstein at a recent site visit on Friday, April 17, 2015. In summary, the changes
requested are as follows:
I. The longer building (R.O. Bldg.) will be expanded to a width of 60 feet. There will be roll up doors on both
of the short ends. The two long sides will have no openings. The exterior sheathing shall be a typical metal
siding provided by the steel building manufacturer. The eave height of the building shall be reduced to 12 feet to
minimize the height of the structure. This will also result in the roll up door height being reduced to 10 feet.
2. The shorter building (Generator Bldg.) will have exterior sheathing that is the typical metal siding provided
by the steel building manufacturer. The height will be increased to 20 feet to accommodate a roll up door 16 feet
in height. This is the minimum height established by the LSJ maintenance staff to accommodate the roll on roll
off activities of the dumpsters.
I would like to add some observations regarding the change in heights of the two buildings. For one, it doesn't
make sense to minimize the height of one building while the other must be a full 8 feet higher. The Generator
building now looks out of proportion with that extra height. What may be more appropriate in my opinion is to
consider not roofing where the dumpsters will be located and extend the parapet wall up another 3 — 4 feet to be
almost 9 feet above the roof slab. This will do a lot to visually screen the dumpsters. You should also consider
replacing the dumpsters with enclosed units that have compactors incorporated into them. Some of these type of
EFTA00645629
dumpsters are presently being used in very visible sites on St. Thomas, particularly at WICO. Finally, I have
also included the revised floor plan for the Maintenance & Workshop Building, eliminating the Break Room.
JPW
This email is free from viruses and malware because avast! Antivirus protection is active.
EFTA00645630
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Email Addresses
Document Details
| Filename | EFTA00645629.pdf |
| File Size | 90.3 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 2,594 characters |
| Indexed | 2026-02-11T23:16:31.581216 |