Back to Results

EFTA00652467.pdf

Source: DOJ_DS9  •  Size: 82.2 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

From: Daphne Wallace To: Jeffrey Epstein Cc: Roy Hodges , Stephanie Hod es , Rich !Cahn , Sarah K Subject: Photographs - March 26, 2013 Date: Tue, 26 Mar 2013 17:43:51 +0000 Attachments: Main_compoundn landingprogress_(1).JPG; Main_compound_- _landing_progress_(2).JPG; Main_compoundn landing_progress_(3).JPG; Main compound_ Main_compound_- _landing_progress_(5).JPG; Main_compoundn landing_progress_(6).JPG; Main compound_ Maincompound_- _landing_progress_(8).JPG; Main_compoundn landing_progress_(9).JPG; Main compound_ Main_compound_- _landing_progress_(11).JPG; Main_compoundn landing_progress_(12).JPG; Main_compound_-_landing_progress_(13).JPG; Main compound_ Main compound_ Helicopter wall_progrest(1).JPG; Helicopter wall_progress_(2).JPG; Helicopter wall_progress_(3).JPG; Helicopter wall_progress_(4).JPG; Helicopter wall_progress_(5).JPG; Helicopter wall_progress_(6).JPG; Helicopter wall_progress_(7).JPG; Flagpole_pool_area_clearing_(1).JPG; Flagpole_pool_area_clearing_(2).JPG; Flagpole_pool_area_clearing_(3).JPG; Flagpole_pool_area_clearing_(4).JPG; Flagpole_pool_area_clearing_(5).JPG; Flagpole_pool_area_clearing_(6).JPG; Flagpole_pool_area_clearing_(7).JPG; Flagpole_pool_cabana_cables_runs_tmder_tile_(1).JPG; Flagpole_pool_cabana_cables_runs_tmder tile_(2).JPG; Flagpolepool_cabana_cables_runs_tmder tile_(3).JPG; Flagpolepool_cabana_prep_work_for towel_warmer install_(1).JPG; Flagpolepool_cabana_prep_work_for towel_warmer install_(2).JPG; Flagpole_pool_cabana_prep_work_for towel_warmer install_(3).JPG; Flagpole_pool_gate_realigned.JPG; Docking_area_aligned_with_building_(1).JPG; Docking_area_aligned_with_building_(2).JPG; Docking_area_aligned_with_building_(3).JPG; Docking_area_aligned_with_building_(4).JPG; Info_center_driveway.JPG; Info_centerfans.JPG; Master_bath_exterior mirrors.JPG; Sarah's_ office_ ceiling_grate_cover.JPG; Rabbit_lights_aligned_(1).JPG; Rabbit lights_aligned_(2).JPG; RO_roof clean_up_progress.JPG; Dock Rouse_thatch_removed.JPG; Engineering_area_- plumbing_of exterior_hose_bibs_(1).JPG; Engineering_area_- _plumbing_of exterior_hose_bibs_(2).JPG; Main_compound_berm_(1).JPG; Main_compound_berm_(2).JPG; Dump_site_cleaned_up_(1).JPG; Dump_site_cleaned_up_(2).JPG; Dump_site_cleaned_up_(3).JPG; Dump_site_cleaned_up_(4).JPG; Temporary_dump_site_(1).JPG; Temporary_dump_site_(2).JPG; Truck_tires_on_site.JPG Greetings Mr. Epstein, March 26 photographs for your review and comments: Main compound stone landing progress Helicopter wall progress Flagpole pool area clearing EFTA00652467 Flagpole pool cabana cables run under tile Flagpole pool cabana prep work for towel warmer installation Flagpole pool cabana gate re-aligned Engineering area docking area aligned with Mechanical Building Info center driveway matting Info center fans Master bath exterior mirrors Sarah's office ceiling grate cover Rabbit lights across from gorilla triangle re-aligned RO roof cleanup progress Dock house thatch removal Engineering area plumbing of exterior hose bibs Main compound berm Dump site clean up Temporary dump site Truck tires on site Respectfully submitted, Daphne EFTA00652468

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Extracted Information

Dates

Document Details

Filename EFTA00652467.pdf
File Size 82.2 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 3,194 characters
Indexed 2026-02-11T23:18:57.670173
Ask the Files