EFTA00652467.pdf
PDF Source (No Download)
Extracted Text (OCR)
From: Daphne Wallace
To: Jeffrey Epstein
Cc: Roy Hodges
, Stephanie Hod es
, Rich
!Cahn
, Sarah K
Subject: Photographs - March 26, 2013
Date: Tue, 26 Mar 2013 17:43:51 +0000
Attachments: Main_compoundn
landingprogress_(1).JPG; Main_compound_-
_landing_progress_(2).JPG; Main_compoundn
landing_progress_(3).JPG;
Main compound_
Main_compound_-
_landing_progress_(5).JPG; Main_compoundn
landing_progress_(6).JPG;
Main compound_
Maincompound_-
_landing_progress_(8).JPG; Main_compoundn
landing_progress_(9).JPG;
Main compound_
Main_compound_-
_landing_progress_(11).JPG; Main_compoundn
landing_progress_(12).JPG;
Main_compound_-_landing_progress_(13).JPG; Main compound_
Main compound_
Helicopter wall_progrest(1).JPG; Helicopter wall_progress_(2).JPG;
Helicopter wall_progress_(3).JPG; Helicopter wall_progress_(4).JPG;
Helicopter wall_progress_(5).JPG; Helicopter wall_progress_(6).JPG;
Helicopter wall_progress_(7).JPG; Flagpole_pool_area_clearing_(1).JPG;
Flagpole_pool_area_clearing_(2).JPG; Flagpole_pool_area_clearing_(3).JPG;
Flagpole_pool_area_clearing_(4).JPG; Flagpole_pool_area_clearing_(5).JPG;
Flagpole_pool_area_clearing_(6).JPG; Flagpole_pool_area_clearing_(7).JPG;
Flagpole_pool_cabana_cables_runs_tmder_tile_(1).JPG;
Flagpole_pool_cabana_cables_runs_tmder tile_(2).JPG;
Flagpolepool_cabana_cables_runs_tmder tile_(3).JPG;
Flagpolepool_cabana_prep_work_for towel_warmer install_(1).JPG;
Flagpolepool_cabana_prep_work_for towel_warmer install_(2).JPG;
Flagpole_pool_cabana_prep_work_for towel_warmer install_(3).JPG;
Flagpole_pool_gate_realigned.JPG; Docking_area_aligned_with_building_(1).JPG;
Docking_area_aligned_with_building_(2).JPG;
Docking_area_aligned_with_building_(3).JPG;
Docking_area_aligned_with_building_(4).JPG; Info_center_driveway.JPG;
Info_centerfans.JPG; Master_bath_exterior mirrors.JPG;
Sarah's_ office_ ceiling_grate_cover.JPG; Rabbit_lights_aligned_(1).JPG;
Rabbit lights_aligned_(2).JPG; RO_roof clean_up_progress.JPG;
Dock Rouse_thatch_removed.JPG; Engineering_area_-
plumbing_of exterior_hose_bibs_(1).JPG; Engineering_area_-
_plumbing_of exterior_hose_bibs_(2).JPG; Main_compound_berm_(1).JPG;
Main_compound_berm_(2).JPG; Dump_site_cleaned_up_(1).JPG;
Dump_site_cleaned_up_(2).JPG; Dump_site_cleaned_up_(3).JPG;
Dump_site_cleaned_up_(4).JPG; Temporary_dump_site_(1).JPG;
Temporary_dump_site_(2).JPG; Truck_tires_on_site.JPG
Greetings Mr. Epstein,
March 26 photographs for your review and comments:
Main compound stone landing progress
Helicopter wall progress
Flagpole pool area clearing
EFTA00652467
Flagpole pool cabana cables run under tile
Flagpole pool cabana prep work for towel warmer installation
Flagpole pool cabana gate re-aligned
Engineering area docking area aligned with Mechanical Building
Info center driveway matting
Info center fans
Master bath exterior mirrors
Sarah's office ceiling grate cover
Rabbit lights across from gorilla triangle re-aligned
RO roof cleanup progress
Dock house thatch removal
Engineering area plumbing of exterior hose bibs
Main compound berm
Dump site clean up
Temporary dump site
Truck tires on site
Respectfully submitted,
Daphne
EFTA00652468
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Dates
Document Details
| Filename | EFTA00652467.pdf |
| File Size | 82.2 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 3,194 characters |
| Indexed | 2026-02-11T23:18:57.670173 |