Back to Results

EFTA00655778.pdf

Source: DOJ_DS9  •  Size: 44.6 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

From: Daphne Wallace To: Jeffrey Epstein <jeevacation@gmail.com> Cc: John C , Rich Kahn ann rodriquez Subject: LSJ Paving Project - July 8, 2014 Date: Tue, 08 Jul 2014 15:33:02 +0000 Greetings Sir, Cherie Boynes-Jackson of Boyson Transportation and Eason Jeffers of Better Roads spoke this morning regarding the transportation needs for the paving project. Boyson says they can do the job. Better Roads outlined their need for 5-6 truckloads of asphalt per day, plus operating equipment. Due to the shallow draft (8 feet possibly at high tide) and the immense weight of 5-6 truckloads at a time (50,000-60,000 pounds), they will have to work out a schedule of 2-3 truckloads per run. Better Roads says they are planning on the beginning of August for the start of the project, once you have reviewed and approved the schedule, contract, etc. I have asked Better Roads to come up with a schedule and timeline that they can present to Boyson on Monday, July 14. Once Boyson reviews and aligns their schedule with Better Roads, we will submit the proposed schedule to you for your review and approval. Respectfully, Daphne EFTA00655778

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Extracted Information

Dates

Email Addresses

Document Details

Filename EFTA00655778.pdf
File Size 44.6 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 1,153 characters
Indexed 2026-02-11T23:20:13.183926
Ask the Files