EFTA00662540.pdf
PDF Source (No Download)
Extracted Text (OCR)
From: Leighton Allenby <I
To: Janusz Banasiak
Cc: Rich Kahn
Jeffrey Epstein <jeevacation@gmail.com>,
Leighton Allenby
Subject: Re: Pavers
Date: Fri, 14 Aug 2015 18:40:32 +0000
Attachments: IMG 0939.JPG
That isn't correct
They need to remove the stones and do this correctly
I. remove stones
2. clean debris off stone
3. mix with their epoxy before putting into hole / mushy mixture
4. fill joints with mixture and compact real tight/smooth to top of pavers.
Perhaps we should bring in another contractor if they cannot look at the aesthetic side of the application.
Leighton Allenby
Director of Pro erties
On Fri, Aug 14, 2015 at 2:29 PM, Janusz Banasiak
> wrote:
Hi Leighton the were here today.Pour more sealer stay on surface for a while and going down.will order heavy
thickness on Monday will call me and let me know.have told me it is hard to find one.
Sent from my iPhone
EFTA00662540
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Document Details
| Filename | EFTA00662540.pdf |
| File Size | 38.5 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 914 characters |
| Indexed | 2026-02-11T23:22:57.288780 |