Back to Results

EFTA00662540.pdf

Source: DOJ_DS9  •  Size: 38.5 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

From: Leighton Allenby <I To: Janusz Banasiak Cc: Rich Kahn Jeffrey Epstein <jeevacation@gmail.com>, Leighton Allenby Subject: Re: Pavers Date: Fri, 14 Aug 2015 18:40:32 +0000 Attachments: IMG 0939.JPG That isn't correct They need to remove the stones and do this correctly I. remove stones 2. clean debris off stone 3. mix with their epoxy before putting into hole / mushy mixture 4. fill joints with mixture and compact real tight/smooth to top of pavers. Perhaps we should bring in another contractor if they cannot look at the aesthetic side of the application. Leighton Allenby Director of Pro erties On Fri, Aug 14, 2015 at 2:29 PM, Janusz Banasiak > wrote: Hi Leighton the were here today.Pour more sealer stay on surface for a while and going down.will order heavy thickness on Monday will call me and let me know.have told me it is hard to find one. Sent from my iPhone EFTA00662540

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Extracted Information

Dates

Email Addresses

Document Details

Filename EFTA00662540.pdf
File Size 38.5 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 914 characters
Indexed 2026-02-11T23:22:57.288780
Ask the Files