EFTA00669490.pdf
Extracted Text (OCR)
From: Richard Kahn
To: "Jeffrey E." <jeevacation@gmail.com>
Subject: Re: Mr. Epstein's Library,
Date: Thu, 05 Nov 2015 16:46:54 +0000
brandon left the door at 9 east
he can come by tomorrow am to do sample on site
please advise if that is ok
thank you
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
New York, NY 10022
tel
fax
cel
On Nov 5, 2015, at 9:29 AM, jeffrey E. <jeevacation@gmail.com> wrote:
the piece of door that he took
On Thu, Nov 5, 2015 at 9:22 AM, Richard Kahn <
wrote:
i called brandon yesterday and he was confused by me saying to do the door sample
do you mean sample cabinet door in room based on color on floor?
please advise
thank you
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
New York, NY 10022
tel
fax
cel
On Nov 4, 2015, at 7:53 AM, jeffrey E. <jeevacation@gmail.com> wrote:
Ask him to do the door sample
On Wednesday, 4 November 2015, Richard Kahn
> wrote:
Brandon has proposed 32k labor and 3k materials = 35k total cost
EFTA00669490
Original proposal was 40k for labor and materials
Please advise if pricing acceptable and if so when you would like him to begin
Thank you
From: Brandon Thompson
Date: Tuesday, November 3, 2015 at 8:52 PM
To: Richard Kahn
Subject: Mr. Epstein's Library,
Dear Richard,
This morning, I brought a lot of samples to Mr.. Epstein. He did not like any of them.
I asked him, whether I can come back and make a sample on the second floor, as he pointed out the color on the floor. I
matched the color exactly.
Later on, Mr. Epstein chose the sample and I have it confirmed.
He told me that he may get rid of one section of the Library, the East Section.
The library is a rectangle, and the section he would like to remove is a smaller wall.
I said to Mr.. Epstein, that I will reduce the price for restoration.
I would like to be fair to Mr. Epstein as well to myself.
In all this hurry, hurry life, I forgot to consider materials, which will amount to something like $3,000.--$3,200.-
Still, I would like to reduce the cost to $32,000.- for the full restoration, providing that the East wall is removed and I
have nothing to do with it.
I would like to hire help as well to remove all loose parts to work at the studio in Tarrytown, so we can extend the work-
day, and we can finish faster: probably in 6-7 weeks. I will try my very best to shorten the time of restoration.
Please, let me know if this is acceptable with Mr. Epstein and the proximate time to start.
Thank you,
Brandon
please note
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
JEE
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to jee
n®gmail.com, and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
please note
EFTA00669491
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
JEE
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to jeevacation@gmail.com, and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA00669492
Document Preview
Extracted Information
Document Details
| Filename | EFTA00669490.pdf |
| File Size | 131.1 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 3,779 characters |
| Indexed | 2026-02-11T23:25:41.781317 |
Related Documents
Documents connected by shared names, same document type, or nearby in the archive.