EFTA00670519.pdf
PDF Source (No Download)
Extracted Text (OCR)
From:
To: Jeffrey Epstein <jeevacation@gmail.com>
Subject: Reminder
Date: Sat, 22 Feb 2014 13:20:50 +0000
February 24th 2014 , fly Boeing to Brunswick GA for C check inspection and engine overhaul, down time is 8
weeks estimate, 45 days required for engine overhaul inspection on #1 and #3 engines.
Sent from my iPhone
EFTA00670519
Document Preview
PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.
Extracted Information
Email Addresses
Document Details
| Filename | EFTA00670519.pdf |
| File Size | 18.8 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 338 characters |
| Indexed | 2026-02-11T23:26:04.543470 |