Back to Results

EFTA00674434.pdf

Source: DOJ_DS9  •  email/external  •  Size: 93.9 KB  •  OCR Confidence: 85.0%
View Original PDF

Extracted Text (OCR)

From: brice gordon To: Jeffrey Epstein <jeevacation@gmail.com> Cc: Jon Christensen ala>, Rich Kahn Subject: LSJ RO Service Report Date: Wed, 22 Mar 2017 15:04:23 +0000 Attachments: LSJ_Field_Service_report._3-2017.docx Jeffrey Attached, LSJ RO Service Report dated 3/21/17 for your review Based on this report, water production and quality levels should be getting back to normal. Flushing of entire system should continue. Below is a paragraph from the report which out lines the Critical Issues discovered with the Post Water Treatment. " and found the chemical injection pump dosing over Twice what it should be dosing which will cause an excessive amount of calcium carbonate to be consumed as well as poor water quality being delivered into the cistern. He also found the calcium carbonate reactor valve itself in the closed position probably due to the fact that with improper chemical dosing, the final product water was very high in calcium carbonate or hardness, so someone just figure that it would be best just to shut it off rather than properly adjusting the chemical feed. Unfortunately, this allowed for Very Low Ph Water to be fed into the cistern which when one considers that the cisterns on LSJ are of concrete design, will cause damage through attrition of the cistern itself as well as cause a rise in hardness and conductivity of the treated water." Post Treatment has been calibrated Water Hardness was measured @ 20ppm hardness, and as stated in the report will be increased to normal operating levels of 40ppm once the entire system recovers. Please note most Water Softness are rated to 40ppm Service Reports from 2014, 2015 and now 2017 all highlight the same issue, lack of Plant Maintenance and Poor Plant Operation The Go Forward- My recommendations Water Samples be taken again at the beginning of next week, from Plant, cistern and MB EFTA00674434 Smiley needs to be made Accountable for the RO Plant. He needs to understand if this happens again he will be released. He also needs to complete an online RO Operators course as a prerequisite for his job. The amount of time off he takes for University classes also needs to be addressed. Danny Ettinne should also receive training and complete the operators course, so there are two people on island who know the operation of the plant, to cover holidays etc Reporting should be forwarded to Management for review Can we proceed with the above recommendations? regards Brice Gordon EFTA00674435

Document Preview

Extracted Information

People Mentioned

Dates

Email Addresses

Document Details

Filename EFTA00674434.pdf
File Size 93.9 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 2,516 characters
Indexed 2026-02-11T23:27:38.013202

Related Documents

Documents connected by shared names, same document type, or nearby in the archive.

Ask the Files