From: brice gordon
To: Jeffrey Epstein <jeevacation@gmail.com>
Cc: Jon Christensen ala>,
Rich Kahn
Subject: LSJ RO Service Report
Date: Wed, 22 Mar 2017 15:04:23 +0000
Attachments: LSJ_Field_Service_report._3-2017.docx
Jeffrey
Attached, LSJ RO Service Report dated 3/21/17 for your review
Based on this report, water production and quality levels should be getting back to normal. Flushing
of entire system should continue.
Below is a paragraph from the report which out lines the Critical Issues discovered with the Post
Water Treatment.
" and found the chemical injection pump dosing over Twice what it should be dosing which will
cause an excessive amount of calcium carbonate to be consumed as well as poor water quality being
delivered into the cistern. He also found the calcium carbonate reactor valve itself in the closed
position probably due to the fact that with improper chemical dosing, the final product water was
very high in calcium carbonate or hardness, so someone just figure that it would be best just to shut
it off rather than properly adjusting the chemical feed. Unfortunately, this allowed for Very Low Ph
Water to be fed into the cistern which when one considers that the cisterns on LSJ are of concrete
design, will cause damage through attrition of the cistern itself as well as cause a rise in hardness
and conductivity of the treated water."
Post Treatment has been calibrated
Water Hardness was measured @ 20ppm hardness, and as stated in the report will be increased to
normal operating levels of 40ppm once the entire system recovers.
Please note most Water Softness are rated to 40ppm
Service Reports from 2014, 2015 and now 2017 all highlight the same issue, lack of Plant
Maintenance and Poor Plant Operation
The Go Forward- My recommendations
Water Samples be taken again at the beginning of next week, from Plant, cistern and MB
EFTA00674434
Smiley needs to be made Accountable for the RO Plant. He needs to understand if this happens
again he will be released.
He also needs to complete an online RO Operators course as a prerequisite for his job.
The amount of time off he takes for University classes also needs to be addressed.
Danny Ettinne should also receive training and complete the operators course, so there are two
people on island who know the operation of the plant, to cover holidays etc
Reporting should be forwarded to Management for review
Can we proceed with the above recommendations?
regards
Brice Gordon
EFTA00674435
Document Preview
Extracted Information
People Mentioned
Dates
Email Addresses
Document Details
| Filename | EFTA00674434.pdf |
| File Size | 93.9 KB |
| OCR Confidence | 85.0% |
| Has Readable Text | Yes |
| Text Length | 2,516 characters |
| Indexed | 2026-02-11T23:27:38.013202 |
Related Documents
Documents connected by shared names, same document type, or nearby in the archive.