Back to Results

EFTA00675808.pdf

Source: DOJ_DS9  •  Size: 139.9 KB  •  OCR Confidence: 85.0%
PDF Source (No Download)

Extracted Text (OCR)

From: Richard Kahn To: Jeffrey Epstein <jeevacation@gmail.com> Subject: Fwd: EPSTEIN / 22 avenue Foch - Cleaning of facades Date: Tue, 24 Sep 2013 21:05:19 +0000 Inline-Images: 20130924_084324.jpg i am unsure if anyone has made you aware of the pending facade cleaning in your Paris residence please see dates below and areas that will be affected i also understand there will be a considerable amount of noise please advise Richard Kahn HBRK Associates Inc. 575 Lexington Avenue, 4th Floor, New York, New York 10022 Begin forwarded message: From: "Marie-Joseph Experton" Date: September 24, 2013 11:09:16 AM EDT To: mbellakleir ' >, "'Richard Kahn Indyke"' < Subject: EPSTEIN / 22 avenue Foch - Cleaning of fagades Reply-To: < , "'Darren Please note that shutters will have to remain closed for 3 weeks for the cleaning of "Façade Avenue", with no possibility to open them due to blocking up, i.e.: • from the day Valdson returns to Paris or at the latest next Tuesday morning through mid October for the part on me Chalgrin (dining room, Mr. Epstein's office and sitting room), • from October 7th through the end of the month of October for the windows round the corner with rue Chalgrin and all the windows on avenue Foch. See as attachment, photo taken this morning of the scaffolding almost done on me Chalgrin. From: Marie-Joseph Experton [mailto Sent: samedi 21 septembre 2013 20:52 To: 'Bella Klein; 'Richard Kahn'; 'Darren Indyke' Subject: EPSTEIN / 22 avenue Foch - Cleaning of facades Importance: High EFTA00675808 See attachments for (i) general planning and (ii) marked-up planning concerning Mr. Epsteins's apartment: "Façade Avenue" = avenue Foch - all windows on Avenue Foch and round rue Chalgrin until the dining room included. "Façade Chalgrin" = rue Chalgrin — all windows from the kitchen and the new apartment. The architect recommends that someone be present in the apartment during working hours from the beginning of October through the end of December. The architect does not think that removal of curtains behind and around the bay windows is necessary. She recommends that (i) curtains be tied up away from the walls/windows in the rooms when works take place outside and (ii) only decorations, items, paintings are removed. She suggests that protection be put on some of the windows and said she can make (in coordination with us) appropriate arrangements therefor. She will be informing us of the precise work schedule. Shutters are expected to be removed for repair around mid November for a few days. Strong noise is to be expected from the beginning of October through the end of November on avenue Foch and mid December through mid January on me Chalgrin (corresponding to the "repair" period). I shall be attending a new meeting at 22 avenue Foch with HELLIER DU VERNEUIL and the architect on Tuesday (September 20) in the morning (9:00 am). I will collect the mail and hope to get the quotes for the windows. Best regards. Marie-Joseph Experton Avoca! au Barreau de Paris etabli a Bruxelles Begin forwarded message: From: Darren Indyke < > Date: September 3, 2013, 4:51:51 PM EDT To: Cc: Richard Kahn c >, Bella Klein < > Subject: Fwd: EPSTEIN / 22 avenue Foch - Cleaning of facades I would like to arrange a conference call with you, Richard Kahn and Bella Klein tomorrow morning NY time. Can you please let us know what time works for you. Among the topics to discuss are: 1. What time on Sept 10 is the architect doing the inspection 2. Removal of decorations, items, paintings, curtains behind and around the bay windows during the period that the works are taking place. Is there a contractor to do this? 3. Possibility of new windows at Rue Chalgrin - new quotes; previous reasons for not replacing (do they still apply) Please let us all know by return email when you would like to have the call. Thanks. DARREN K. INDYKE DARREN K. INDYKE, PLLC 575 Lexington Avenue, 4th Floor New York, New York 10022 EFTA00675809 EFTA00675810

Document Preview

PDF source document
This document was extracted from a PDF. No image preview is available. The OCR text is shown on the left.

Document Details

Filename EFTA00675808.pdf
File Size 139.9 KB
OCR Confidence 85.0%
Has Readable Text Yes
Text Length 4,050 characters
Indexed 2026-02-11T23:28:14.777320
Ask the Files